Permit GraphShortlistSan Francisco building permits since 2000

Brian Wieseler

License
18289
Board not determined from the city's record: no role or letter places this number
About the state's license search
Search the state's license records (not the contractors board)
Listed as
engineer
On San Francisco permits
Jun 2018 to Jun 2018

1 permit since 2000 (engineer on 1 permit): 1 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Lions Gate Electric

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jun 6, 2018Completed
final sign-off Jul 2018
550 Ofarrell StLions Gate Electricinstall floor data/electrical boxes. chage t-bar tile. change existing lighting. add receptacles and data outlets. work includes core-drill non-pt slab for floor boxes, 3" maximum diameter, approximate 7 locations.
Details
Permit
201806061091
Permit issued
Jun 6, 2018
Final sign-off
Jul 10, 2018

install floor data/electrical boxes. chage t-bar tile. change existing lighting. add receptacles and data outlets. work includes core-drill non-pt slab for floor boxes, 3" maximum diameter, approximate 7 locations.

Open the permit page

$10,000