Brian Hogan
- Listed as
- authorized agent-others, contractor
- Firm
- Kadon Construction
- Based in
- Burlingame
- On San Francisco permits
- Dec 2017 to Sep 2026
19 permits since 2000 (contractor on 19 permits, authorized agent-others on 1 permit): 18 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 17, 2026 | In progress filed Sep 2026, not yet issued | 273 Dolores St | Kadon Construction | erect type vb 2-story adu residence in rear of yard.Details
erect type vb 2-story adu residence in rear of yard. | $235,000 |
| Feb 28, 2025 | Completed final sign-off Jul 2025 | 273 Dolores St | Kadon Construction | unit #273: full bathroom remodel in-kind, full kitchen remodel in-kind. unit #275: full bathroom remodel in-kind, full kitchen remodel in-kind.Details
unit #273: full bathroom remodel in-kind, full kitchen remodel in-kind. unit #275: full bathroom remodel in-kind, full kitchen remodel in-kind. | $40,000 |
| Jul 16, 2024 | Completed final sign-off Nov 2024 | 89 Belgrave Av | Kadon Construction | revision to previous permit# 202211156492: revised mechanical mini-split unit and revised t-24 energy report.Details
revision to previous permit# 202211156492: revised mechanical mini-split unit and revised t-24 energy report. | |
| Dec 29, 2023 | Completed final sign-off May 2025 | 1616 Shrader St | Kadon Construction | renovate 2 full baths & laundry at 3/f, w/new floors throughtout, replace 2 fireplaces w/gas appliance, kitchen remodel and 2 new openings at 2/f, select new windows, new interior doors, new lighting and plumb fixtures @ areas altered. removal of 2 fire escapes, w/new sprinklers along path of egressDetails
renovate 2 full baths & laundry at 3/f, w/new floors throughtout, replace 2 fireplaces w/gas appliance, kitchen remodel and 2 new openings at 2/f, select new windows, new interior doors, new lighting and plumb fixtures @ areas altered. removal of 2 fire escapes, w/new sprinklers along path of egress | $84,000 |
| Apr 6, 2023 | Completed final sign-off Nov 2023 | 27 Brewster St | Kadon Construction | relocate bathroom at ground fl. no added total square footage, adding 97 sf conditioned area. rear sliding door and new window.Details
relocate bathroom at ground fl. no added total square footage, adding 97 sf conditioned area. rear sliding door and new window. | $10,000 |
| Mar 1, 2023 | Completed final sign-off May 2023 | 1616 Shrader St | Kadon Construction | repair of (e) deteriorated deck and framing in-kindDetails
repair of (e) deteriorated deck and framing in-kind | $5,000 |
| Mar 24, 2022 | Completed final sign-off May 2023 | 1616 Shrader St | Kadon Construction | replacement of (e) deteriorated property line retaining wall and fence.Details
replacement of (e) deteriorated property line retaining wall and fence. | $50,000 |
| Feb 3, 2022 | Completed final sign-off Dec 2022 | 7 Danvers St | Kadon Construction | 7a danvers street: rev to pa202102104427 sheet a-2: side yard stair access revision to have a landingDetails
7a danvers street: rev to pa202102104427 sheet a-2: side yard stair access revision to have a landing | $500 |
| Feb 1, 2022 | Completed final sign-off Jan 2023 | 249 Corbett Av | Kadon Construction | new electrical room in existing mechanical room. addition of rated cabinet around gas meters.Details
new electrical room in existing mechanical room. addition of rated cabinet around gas meters. | $500 |
| Sep 24, 2021 | Completed final sign-off Jan 2022 | 43 Buena Vista Tr | Kadon Construction | revision to pa 202104158608. partial wood guardrail instead of all steel guardrail.Details
revision to pa 202104158608. partial wood guardrail instead of all steel guardrail. | |
| Sep 23, 2021 | Completed final sign-off Jan 2023 | 7 Danvers St | Kadon Construction | administrative permit to correct scope of work under pa#2021-0210-4427. the corrected scope of work to include "revision to pa#2019-0416-8082".Details
administrative permit to correct scope of work under pa#2021-0210-4427. the corrected scope of work to include "revision to pa#2019-0416-8082". | |
| Jun 24, 2021 | Completed final sign-off May 2023 | 1616 Shrader St | Kadon Construction | 1st floor: new full bath, new partitions, electrical, lighting, plumbing, mech, floor & ceiling surfaces, new doors and window as well. 2nd floor: gas fire place, nw front door. (in extg location). new deck, stair, fenceDetails
1st floor: new full bath, new partitions, electrical, lighting, plumbing, mech, floor & ceiling surfaces, new doors and window as well. 2nd floor: gas fire place, nw front door. (in extg location). new deck, stair, fence | $150,000 |
| Apr 15, 2021 | Completed final sign-off Jan 2022 | 43 Buena Vista Tr | Kadon Construction | replace an (e) front entry stair including new painted wood stair and painted antique guardrail. removal of non histroic reinforced concrete elements. new permeable pavers with planting in b/t each paver. new planting beds. new painted wood landing at entry door to bring entry code.Details
replace an (e) front entry stair including new painted wood stair and painted antique guardrail. removal of non histroic reinforced concrete elements. new permeable pavers with planting in b/t each paver. new planting beds. new painted wood landing at entry door to bring entry code. | $3,000 |
| Feb 10, 2021 | Completed final sign-off Jan 2023 | 7 Danvers St | Kadon Construction | remodel of an extg adu unit @ ground/basement level (sloped site) work includes kitchen remodel with plmg fixtures, finishes, new hood & exhaust. replacing extg bath vanity, vanity sink faucet & lighting. nw lighting in studio. nw water heater to be located in basemet space with other extg waterDetails
remodel of an extg adu unit @ ground/basement level (sloped site) work includes kitchen remodel with plmg fixtures, finishes, new hood & exhaust. replacing extg bath vanity, vanity sink faucet & lighting. nw lighting in studio. nw water heater to be located in basemet space with other extg water | $30,000 |
| Jan 30, 2020 | Completed final sign-off Oct 2020 | 625 47th Av | Kadon Construction | replacement of one full bahtroom. expansion of 49 sq feet of conditioned space into existing garage, new lighting electrical and plumbing on ground floor.Details
replacement of one full bahtroom. expansion of 49 sq feet of conditioned space into existing garage, new lighting electrical and plumbing on ground floor. | $75,000 |
| Dec 6, 2019 | Completed final sign-off Oct 2021 | 43 Buena Vista Tr | Kadon Construction | revision to app#201905201150. 2)revision of footings. 3)provide shoring per drawings sheets s-13 and s-14Details
revision to app#201905201150. 2)revision of footings. 3)provide shoring per drawings sheets s-13 and s-14 | |
| Sep 4, 2019 | Completed final sign-off Oct 2021 | 43 Buena Vista Tr | Kadon Construction | 12 sq ft powder room additon with (1) new toilet, (1) new sink & new light fixtures & finishes. addition located on 1st fl onlyDetails
12 sq ft powder room additon with (1) new toilet, (1) new sink & new light fixtures & finishes. addition located on 1st fl only | $1,000 |
| May 20, 2019 | Completed final sign-off Jan 2022 | 43 Buena Vista Tr | Kadon Construction | interior remodel and minor extg improvement incl. increase with of gargae, door, nw int. stair, replace extg windw, kitchen remodel, bathroom remodel, nw laundry room, addition at basement & 1st fl., demo of exterior & interior stair in non-shared lightwell (south side of bldg)Details
interior remodel and minor extg improvement incl. increase with of gargae, door, nw int. stair, replace extg windw, kitchen remodel, bathroom remodel, nw laundry room, addition at basement & 1st fl., demo of exterior & interior stair in non-shared lightwell (south side of bldg) | $1,200,000 |
| Dec 7, 2017 | Completed final sign-off Dec 2017 | 625 47th Av | Kadon Construction | replace 2 leaking windows in kind on ground floor at back of house. replace 1 door unit in kind at back of house.Details
replace 2 leaking windows in kind on ground floor at back of house. replace 1 door unit in kind at back of house. | $6,000 |