Brendan Canning
- License
- C34451
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- On San Francisco permits
- Mar 2019 to Jun 2026
2 permits since 2000 (architect on 2 permits): 1 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Baxter Construction
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 1
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 22, 2026 | In progress issued Jun 2026 | 611 Washington St | Baxter Construction | unit 2402- interior remodel to include electrical and plumbing. kitchen appliances and finishes replaced in kind. one kitchen wall with door to be reconfigured. 3xbathrooms remodeled in kind. one wall with two doors between guest bedroom and primary bathroom to be reconfigured. casework throughoutDetails
unit 2402- interior remodel to include electrical and plumbing. kitchen appliances and finishes replaced in kind. one kitchen wall with door to be reconfigured. 3xbathrooms remodeled in kind. one wall with two doors between guest bedroom and primary bathroom to be reconfigured. casework throughout | $200,000 |
| Mar 28, 2019 | Completed final sign-off Dec 2020 | 22 Franklin St | tenant improvement of (e) commercial unit and change of use to restaurant "le fantastique". new construction consists of interior partitions, doors, millwork, hvac, electrical and plumbing (e) to remainDetails
tenant improvement of (e) commercial unit and change of use to restaurant "le fantastique". new construction consists of interior partitions, doors, millwork, hvac, electrical and plumbing (e) to remain | $450,000 |