Permit GraphShortlistSan Francisco building permits since 2000

Bill Poon

License
C17475
Look the license up with the state
Listed as
architect
On San Francisco permits
Aug 2013 to Oct 2022

4 permits since 2000 (architect on 4 permits): 2 completed, 2 never finaled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Oct 19, 2022Completed
final sign-off Dec 2025
32 Everglade DrCheuk Yin Chen Constructionconstruct attached adu within (e) 2 story & extended rear. horizontal addition to both floors. replacce driveways. extend ext stair to access usable open space at rear yard.
Details
Permit
202210194645
Status
complete
Filed
Oct 19, 2022
Permit issued
Mar 4, 2024
Final sign-off
Dec 1, 2025
Declared cost
$525,000
Address
32 Everglade Dr

construct attached adu within (e) 2 story & extended rear. horizontal addition to both floors. replacce driveways. extend ext stair to access usable open space at rear yard.

Open the permit page

$525,000
Aug 19, 2019Never finaled
issued Sep 2021, no final
95 Santa Cruz Averect a two story, 1 basement type 5 construction two residential building, cross reference adu permit #201908199202s.
Details
Permit
201908199195
Status
issued
Filed
Aug 19, 2019
Permit issued
Sep 16, 2021
Declared cost
$700,000
Address
95 Santa Cruz Av

erect a two story, 1 basement type 5 construction two residential building, cross reference adu permit #201908199202s.

Open the permit page

$700,000
Aug 19, 2019Never finaled
issued Sep 2021, no final
95 Santa Cruz Avadd units per ordinance nos. 162-16, 95-17 & 162-17, administrative permit only for change of use: 2nd floor dwelling unit in cross reference pa #201908199195s wil be adu per ordinance 116-19. the estimated cost of the adu is 1.00
Details
Permit
201908199202
Status
issued
Filed
Aug 19, 2019
Permit issued
Sep 16, 2021
Address
95 Santa Cruz Av

add units per ordinance nos. 162-16, 95-17 & 162-17, administrative permit only for change of use: 2nd floor dwelling unit in cross reference pa #201908199195s wil be adu per ordinance 116-19. the estimated cost of the adu is 1.00

Open the permit page

Aug 12, 2013Completed
final sign-off Apr 2014
7230 Geary BlHousing Construction Inc.legalize & develop ground floor including library, playroom & bath. new roof deck & exterior stair, alter sitting room, replace & add windows, repair rotted siding, add shower, relocate washer/dryer, replace furnace & water heater at rear of bldg
Details
Permit
201308124111
Status
complete
Filed
Aug 12, 2013
Permit issued
Sep 5, 2013
Final sign-off
Apr 14, 2014
Declared cost
$30,000
Address
7230 Geary Bl

legalize & develop ground floor including library, playroom & bath. new roof deck & exterior stair, alter sitting room, replace & add windows, repair rotted siding, add shower, relocate washer/dryer, replace furnace & water heater at rear of bldg

Open the permit page

$30,000