Benhang Shi
- Listed as
- engineer
- Firm
- La Premiere Design
- On San Francisco permits
- Aug 2025 to Jun 2026
3 permits since 2000 (engineer on 3 permits): 1 completed, 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 29, 2026 | In progress issued Jun 2026 | 100 Stonecrest Dr | Tao Mountain Construction Inc | restore framing damage due to fire in living room. replace interior drywall boards, insulation, and electrical fixtures. remove existing fireplace and chimney. re-frame sunroom and sunroom roof/deck.Details
restore framing damage due to fire in living room. replace interior drywall boards, insulation, and electrical fixtures. remove existing fireplace and chimney. re-frame sunroom and sunroom roof/deck. | $100,000 |
| Aug 13, 2025 | In progress issued Jun 2026 | 140 Chicago Wy | Rowland Construction Co | to comply with nov# 202431573. add 2 bedrooms & 1 bathroom on the ground floor,remove the 1-story wet bar addition at the northwest,relocate (shift) existing 2-story deck with stairs to be 3 feet away from property lineDetails
to comply with nov# 202431573. add 2 bedrooms & 1 bathroom on the ground floor,remove the 1-story wet bar addition at the northwest,relocate (shift) existing 2-story deck with stairs to be 3 feet away from property line | $20,000 |
| Aug 5, 2025 | Completed final sign-off Mar 2026 | 852 Guerrero St | Elev8 Design & Build | upper level: remodel small bathroom and adding a sink. remodel primary bathroom and expand it to add a toilet.Details
upper level: remodel small bathroom and adding a sink. remodel primary bathroom and expand it to add a toilet. | $50,000 |