- Sep 2019 to Aug 2026
4 permits since 2000 (engineer on 4 permits): 1 completed, 1 in progress, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 6, 2026 | In progress issued Aug 2026 | 4162 17th St | Shearman Construction Llc | revision to permit 202605201641. add holddowns to accommodate balloon framing. add calculations for load transfer where window is turning to a door. add structural framing details.Details
revision to permit 202605201641. add holddowns to accommodate balloon framing. add calculations for load transfer where window is turning to a door. add structural framing details. | |
| Jan 13, 2022 | Never finaled issued Nov 2022, no final | 1801 18th Av | Rwr Construction Inc | replacement of retaining wall to shotcrete wall with drilled piers. amount of 11 cubic yards soils.Details
replacement of retaining wall to shotcrete wall with drilled piers. amount of 11 cubic yards soils. | $50,000 |
| Mar 19, 2021 | Never finaled issued Oct 2021, no final | 216 Winfield St | digging back yard to depth of neighbors level. drilling 6 ft under-neath neighbor level to install cantileves wall. installing wooden retaining wall. backfilling with drainage.Details
digging back yard to depth of neighbors level. drilling 6 ft under-neath neighbor level to install cantileves wall. installing wooden retaining wall. backfilling with drainage. | $25,000 | |
| Sep 23, 2019 | Completed final sign-off Jun 2020 | 4421 19th St | Rwr Construction Inc | install 25' long x 7.5' tall reinforced concrete lagging retaining wall with "l" footing with an integrated steel 1-beam & wood lagging temporary earth shoring system to stablize neighbor's yard.Details
install 25' long x 7.5' tall reinforced concrete lagging retaining wall with "l" footing with an integrated steel 1-beam & wood lagging temporary earth shoring system to stablize neighbor's yard. | $70,000 |