Arathi Gopakumar
- License
- C79207
- Civil engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up C79207 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Mar 2014 to Feb 2022
4 permits since 2000 (engineer on 4 permits): 4 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Dconstrux General Building Contracting I, Envirotek Restoration Inc, Vi Tang Hinh, Wnh Construction
Where they worked
- Single-family 3
- Multi-family (2-family, apartments) 1
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 18, 2022 | Completed final sign-off Aug 2023 | 122 Elsie St | Envirotek Restoration Inc | replace 2 (e) cantilever decks (2nd fl 100 sf & 3rd fl 60 sf) with the same including acrulic panel railings.Details
replace 2 (e) cantilever decks (2nd fl 100 sf & 3rd fl 60 sf) with the same including acrulic panel railings. | $49,850 |
| Jun 16, 2021 | Completed final sign-off Jul 2021 | 2627 Clay St | Vi Tang Hinh | removal of interior (e) walls & columns @ 2ndd floor as per plans to gain open sapce between living room & dining room.Details
removal of interior (e) walls & columns @ 2ndd floor as per plans to gain open sapce between living room & dining room. | $14,500 |
| Sep 26, 2019 | Completed final sign-off Aug 2020 | 85 Carr St | Wnh Construction | dry rot repair per plans. removal of one wall and replacing with a beam. voluntary strengthening.Details
dry rot repair per plans. removal of one wall and replacing with a beam. voluntary strengthening. | $10,000 |
| Mar 28, 2014 | Completed final sign-off Apr 2015 | 201 Tocoloma Av | Dconstrux General Building Contracting I | build deck to spec/plans @ rear of house.Details
build deck to spec/plans @ rear of house. | $18,000 |