Antje Paiz
- License
- 31989
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- architect
- Firm
- Raumfabrik Architecture
- Based in
- Berkeley
- On San Francisco permits
- Jul 2020 to Apr 2023
3 permits since 2000 (architect on 3 permits): 2 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Dfr Construction Inc., Hearth Corporation
- Engineers
- Peter Bonneau
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 2
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 19, 2023 | Completed final sign-off Apr 2025 | 621 Baker St | Hearth Corporation | remodel of upper unit w/ new bathroom at 3rd flr and new 8'wide dormer meeting 311 notification exception.Details
remodel of upper unit w/ new bathroom at 3rd flr and new 8'wide dormer meeting 311 notification exception. | $150,000 |
| Dec 2, 2021 | Expired or cancelled withdrawn Oct 2025 | 619 Baker St | to construct a type 5b, 1 story building with 1 adu. | $100,000 | |
| Jul 24, 2020 | Completed final sign-off Feb 2021 | 1301 Clay St | Dfr Construction Inc. | unit 5 - replace 8 windows in kind in existing openings in front of bldg. new windows will be marvin all wood inserts, with divided lite styles and patterns and window lugs to match the existing. all new windows will have a max. u-value of 0.3. tempered glass will be provided as required by code.Details
unit 5 - replace 8 windows in kind in existing openings in front of bldg. new windows will be marvin all wood inserts, with divided lite styles and patterns and window lugs to match the existing. all new windows will have a max. u-value of 0.3. tempered glass will be provided as required by code. | $20,000 |