Anthony Richardson
- Listed as
- engineer
- Firm
- Biggs Cardosa Assoc
- On San Francisco permits
- Dec 2015 to Dec 2015
2 permits since 2000 (engineer on 2 permits): 2 completed.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 18, 2015 | Completed final sign-off Jun 2016 | 3662 Mission St | soft sotry retrofit per sfbc chapter 34b engineering criteria, 2012 iebc appendix 1-4. add new wood shear wall, concrete footing and wood blocking to satisfy the requirements of the soft story programDetails
soft sotry retrofit per sfbc chapter 34b engineering criteria, 2012 iebc appendix 1-4. add new wood shear wall, concrete footing and wood blocking to satisfy the requirements of the soft story program | $20,000 | |
| Dec 18, 2015 | Completed final sign-off Sep 2022 | 119 Day St | soft story retrofit per sfbc chapter 34b engineering criteria fema p-807. strengthen the existing steel moment frame to satisfy the requirements of the soft story programDetails
soft story retrofit per sfbc chapter 34b engineering criteria fema p-807. strengthen the existing steel moment frame to satisfy the requirements of the soft story program | $15,000 |