Anshul Gupta
- Listed as
- architect
- Firm
- Cozycraft Homes Llc
- On San Francisco permits
- Dec 2025 to Oct 2026
4 permits since 2000 (architect on 4 permits): 1 completed, 3 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 6, 2026 | In progress filed Oct 2026, not yet issued | 1340 Stockton St | F C Company | sidewalk repair over sub- sidewalk vault.Details
sidewalk repair over sub- sidewalk vault. | $25,000 |
| Mar 20, 2026 | In progress filed Mar 2026, not yet issued | 2307 09th Av | level 1 - garage conversion to primary bedrm with en-suite bathroom, closet and laundry; new sliding door and windows facing rear yard; level 2 - kitchen updated in place with removal of wall between kitchen and living room; new freestanding deck within buildable area and exterior stair access toDetails
level 1 - garage conversion to primary bedrm with en-suite bathroom, closet and laundry; new sliding door and windows facing rear yard; level 2 - kitchen updated in place with removal of wall between kitchen and living room; new freestanding deck within buildable area and exterior stair access to | $200,000 | |
| Dec 18, 2025 | In progress issued May 2026 | 3250 Folsom St | F C Company | lv1: infill within existing footprint and into garage to add primary suite, stair access from foyer. lv2: update bathroom/kitchen; reconfigure stair for code compliance.lv3: convert unoccupied attic to a story, add bedroom and bathroom. whole house reroof, replace windows, structural upgrades mepDetails
lv1: infill within existing footprint and into garage to add primary suite, stair access from foyer. lv2: update bathroom/kitchen; reconfigure stair for code compliance.lv3: convert unoccupied attic to a story, add bedroom and bathroom. whole house reroof, replace windows, structural upgrades mep | $522,000 |
| Dec 17, 2025 | Completed final sign-off Jul 2026 | 101 Moffitt St | Chl Construction Company | level 1 - infill beneath level 2 footprint apprx 45 sqft, convert garage space to conditioned space apprx 275 sqft: bedroom, bathroom & family room. level 2- kitchen, bathroom update, adjustment to int. walls. misc scope - repair exterior trims & finishes, new furnace ducting, repair foundtion updatDetails
level 1 - infill beneath level 2 footprint apprx 45 sqft, convert garage space to conditioned space apprx 275 sqft: bedroom, bathroom & family room. level 2- kitchen, bathroom update, adjustment to int. walls. misc scope - repair exterior trims & finishes, new furnace ducting, repair foundtion updat | $80,000 |