Andy Yu
- License
- C27612
- Civil engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up C27612 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Anf & Associates
- Based in
- El Monte
- On San Francisco permits
- Oct 2004 to Oct 2010
3 permits since 2000 (engineer on 3 permits): 1 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Colorado Structures Inc Dba Csi Construc
- Architects
- Adolph Ziemba
- Engineers
- Andy Forrest, Benjamin P. Lau
Where they worked
- Single-family 2
- Multi-family (2-family, apartments) 0
- Commercial 1
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 5, 2010 | Completed final sign-off Sep 2011 | 5800 03rd St | Colorado Structures Inc Dba Csi Construc | t.i. for existing building. shell on 1st floor with minor slab demolition.Details
t.i. for existing building. shell on 1st floor with minor slab demolition. | $600,000 |
| Jun 14, 2006 | Expired or cancelled expired Nov 2007 | 334 Collingwood St | revision to pa# 2002/05/03/5733 structural work only, change from steel framing at 1st floor to suspended concrete floor, revised retaining walls as per new concrete design.Details
revision to pa# 2002/05/03/5733 structural work only, change from steel framing at 1st floor to suspended concrete floor, revised retaining walls as per new concrete design. | ||
| Oct 20, 2004 | Expired or cancelled expired Oct 2007 | 132 Clarendon Av | (n) perimeter rear yard fence less <= 10' drilled pier & timber ret. wall <= 3' high.Details
(n) perimeter rear yard fence less <= 10' drilled pier & timber ret. wall <= 3' high. | $75,000 |