Y.C. Alvan Ma
- License
- 34968
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- architect, designer
- Firm
- Alvan Ma
- On San Francisco permits
- Jun 2013 to Dec 2020
5 permits since 2000 (architect on 4 permits, designer on 1 permit): 5 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Beyond The Horizon Construction (4)
Where they worked
- Single-family 4
- Multi-family (2-family, apartments) 1
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 29, 2020 | Completed final sign-off Dec 2021 | 2566 33rd Av | reference to pa #201906052611 - remove the bearing wall between the kitchen and living room. remove the post from the first floor family room. add a wall in the main entrance to create the foyerDetails
reference to pa #201906052611 - remove the bearing wall between the kitchen and living room. remove the post from the first floor family room. add a wall in the main entrance to create the foyer | $20,000 | |
| May 26, 2015 | Completed final sign-off Aug 2015 | 78 Whitney St | Beyond The Horizon Construction | convert (e) storage space on ground floor into 1 bedroom and 1 full bathroomDetails
convert (e) storage space on ground floor into 1 bedroom and 1 full bathroom | $25,000 |
| May 14, 2015 | Completed final sign-off Aug 2015 | 78 Whitney St | Beyond The Horizon Construction | revision to pa 2015 0424 4519 - foundation repair (partial)Details
revision to pa 2015 0424 4519 - foundation repair (partial) | $7,500 |
| Apr 24, 2015 | Completed final sign-off Aug 2015 | 78 Whitney St | Beyond The Horizon Construction | foundation repair at front of structure. voluntary seismic upgrade down center of structure - to add grade beam & shear wallsDetails
foundation repair at front of structure. voluntary seismic upgrade down center of structure - to add grade beam & shear walls | $25,000 |
| Jun 25, 2013 | Completed final sign-off Sep 2015 | 2938 23rd St | Beyond The Horizon Construction | convert non-habital space on 1st floor to in-law unit - 1 bathroom, 1 bedroom, 1 kitchen to add with proposal.Details
convert non-habital space on 1st floor to in-law unit - 1 bathroom, 1 bedroom, 1 kitchen to add with proposal. | $30,000 |