Alich James
- Listed as
- engineer
- On San Francisco permits
- Jun 2026 to Jun 2026
1 permit since 2000 (engineer on 1 permit): 1 in progress.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 30, 2026 | In progress filed Jun 2026, not yet issued | 750 Bush St | electrical work to include: 12 dual port evm005 48a, 280v, 1 with built-in (1) hypr nanogrid 2020, 2 ct cabinet and ct rated smart meter 120/ 208vDetails
electrical work to include: 12 dual port evm005 48a, 280v, 1 with built-in (1) hypr nanogrid 2020, 2 ct cabinet and ct rated smart meter 120/ 208v | $25,000 |