Alan Chu
- License
- C47155
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C47155 at the Board for Professional Engineers
- Listed as
- architect, designer, engineer
- Firm
- Meterparel & Associates
- Based in
- San Francisco
- On San Francisco permits
- Jan 2009 to Aug 2012
7 permits since 2000 (engineer on 5 permits, architect on 1 permit, designer on 1 permit): 6 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Primus Construction (2), A W Construction Company, Cas Construction
- Architects
- Albert Gordon Atkinson
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 3
- Commercial 2
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 9, 2012 | Completed final sign-off Feb 2013 | 2282 Mission St | revision to appl #2012.07.19.5187 - revise the restrooms layout.Details
revision to appl #2012.07.19.5187 - revise the restrooms layout. | ||
| Jul 19, 2012 | Completed final sign-off Feb 2013 | 2282 Mission St | change front glazing to tempered glass. partial upgrade of 1 restroom as unisex, remodel with double wall with 1" gap to reduce sound. provide additional mech at dining area. change all appliances, freezers, sink, etc. to modern & energy effiency. change existing bar to din-in barDetails
change front glazing to tempered glass. partial upgrade of 1 restroom as unisex, remodel with double wall with 1" gap to reduce sound. provide additional mech at dining area. change all appliances, freezers, sink, etc. to modern & energy effiency. change existing bar to din-in bar | $50,000 | |
| Jul 8, 2009 | Completed final sign-off Aug 2009 | 1483 05th Av | A W Construction Company | to replace stair with landing in kind with complying landing.Details
to replace stair with landing in kind with complying landing. | $9,000 |
| Feb 18, 2009 | Completed final sign-off Feb 2010 | 2290 Green St | Primus Construction | rearrange 2nd & 3rd floor rooms, widened existing interior stair to 3'-0". install plywood sheating on wall & steel beam per plan.Details
rearrange 2nd & 3rd floor rooms, widened existing interior stair to 3'-0". install plywood sheating on wall & steel beam per plan. | $45,000 |
| Feb 5, 2009 | Completed final sign-off Feb 2010 | 2290 Green St | Primus Construction | const a connecting stair fr 2nd fl to ground fl to multi-use rm w/ bathrm & wine cellar, excavate one foot more or less to have 8' ceiling, at unit 2 @ rear, relocate bathrm from 1st fl to 2nd fl, remodel (e)kitchen and (n)half bath, install plywood sheathing, steel bm & upgrade new foundation perDetails
const a connecting stair fr 2nd fl to ground fl to multi-use rm w/ bathrm & wine cellar, excavate one foot more or less to have 8' ceiling, at unit 2 @ rear, relocate bathrm from 1st fl to 2nd fl, remodel (e)kitchen and (n)half bath, install plywood sheathing, steel bm & upgrade new foundation per | $65,000 |
| Jan 26, 2009 | Completed final sign-off Jan 2011 | 2584 California St | Cas Construction | (1) horizontal addition (2) remodel first flr (3) detached garage of 3 parking to change to 2 car parking & repair its roof. construct 2 stairs to rear (4) facade @ california st shall have mouldings & front dr change (5) new living space in (e) basement garage & crawl space. (6) replace (e) walkwayDetails
(1) horizontal addition (2) remodel first flr (3) detached garage of 3 parking to change to 2 car parking & repair its roof. construct 2 stairs to rear (4) facade @ california st shall have mouldings & front dr change (5) new living space in (e) basement garage & crawl space. (6) replace (e) walkway | $125,000 |
| Jan 13, 2009 | Never finaled issued Jan 2009, no final | 976 South Van Ness Av | to complete work & obtain final inspection for work approved under appl#200710094888Details
to complete work & obtain final inspection for work approved under appl#200710094888 | $70,000 |