Ahsanullah Kushkaki
- License
- C59045
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C59045 at the Board for Professional Engineers
- Listed as
- architect, engineer
- On San Francisco permits
- Jun 2021 to Aug 2026
7 permits since 2000 (engineer on 6 permits, architect on 1 permit): 2 completed, 2 in progress, 1 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Canning Electric Inc, Carlos & Brothers Construction, Line Of Art Construction Inc, Nassif A Ayyad, Trejo Construction, Urban Nest Inc, Zemm Construction
- Architects
- Bruce Lyon
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 3
- Commercial 0
- Other or unknown 3
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 14, 2026 | In progress filed Aug 2026, not yet issued | 2293 Powell St | public electrical vehicle charging (16) v4 supercharger.Details
public electrical vehicle charging (16) v4 supercharger. | $288,000 | |
| Jan 22, 2025 | Completed final sign-off Feb 2026 | 1965 Lombard St | Canning Electric Inc | install ev charging, 16 posts, 4 cabinets, 6 lights, 1 switch board. 4 trash bins, 1 van access sign, 7 drilled bolts, 2 bolt down , 1 wifi repainter.Details
install ev charging, 16 posts, 4 cabinets, 6 lights, 1 switch board. 4 trash bins, 1 van access sign, 7 drilled bolts, 2 bolt down , 1 wifi repainter. | $451,000 |
| Apr 30, 2024 | Expired or cancelled withdrawn Aug 2026 | 2293 Powell St | installation of new dcfc ev charging station.installationg of (1) new switchboard, 5 ac-dc cabinets, 19 charging posts and associated ada acess features.Details
installation of new dcfc ev charging station.installationg of (1) new switchboard, 5 ac-dc cabinets, 19 charging posts and associated ada acess features. | $640,000 | |
| Jul 24, 2023 | Never finaled issued Aug 2023, no final | 3556 22nd St | Zemm Construction, Line Of Art Construction Inc | converting part of garage 200 sq.ft to office and bathroomDetails
converting part of garage 200 sq.ft to office and bathroom | $29,500 |
| Jun 1, 2023 | Expired or cancelled cancelled Jan 2026 | 3556 22nd St | Trejo Construction | install beams and posts at garage level | $34,000 |
| May 25, 2023 | In progress issued Nov 2024 | 2527 25th St | Urban Nest Inc, Carlos & Brothers Construction | convert existing ground level non-conforming unit and garage to 2-bedroom/ 1-bath adu: 708 sqft, per ordinance # 162-16. existing non-conforming adu will be added per government code section 65852.2.Details
convert existing ground level non-conforming unit and garage to 2-bedroom/ 1-bath adu: 708 sqft, per ordinance # 162-16. existing non-conforming adu will be added per government code section 65852.2. | $50,000 |
| Jun 1, 2021 | Completed final sign-off Sep 2022 | 632 Geneva Av | Nassif A Ayyad | remodel interior portion of the (e) garage to include familyroom and studyroom and 2 new baths. the parking area of garage will not be affected by the remodel. remodel (e) kitchen, living and dinning area. add a second bathroom on 2/f.Details
remodel interior portion of the (e) garage to include familyroom and studyroom and 2 new baths. the parking area of garage will not be affected by the remodel. remodel (e) kitchen, living and dinning area. add a second bathroom on 2/f. | $30,000 |