Adebowale Sodipo
- License
- S3860
- Structural engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up S3860 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Carona Engineers
- On San Francisco permits
- Feb 2012 to Oct 2026
3 permits since 2000 (engineer on 3 permits): 1 completed, 1 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Central Valley Family Construction Inc., Domus Construction & Design, Sf Building Group
- Designers
- Courtney Mayfield
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 2
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 8, 2026 | In progress issued Oct 2026 | 367 Bartlett St | Sf Building Group | revision 202609248598- replacement of two rear decks at 2nd and 3rd level will add post and footingDetails
revision 202609248598- replacement of two rear decks at 2nd and 3rd level will add post and footing | $20,000 |
| Nov 20, 2012 | Expired or cancelled cancelled Jan 2026 | 535 Teresita Bl | Central Valley Family Construction Inc. | remodel of an existing kitchen and four bathrooms within an existing residential bldg. work includes installation of new railings along a rear deck and reconstruction of a set on interior stairs. new recessed lighting.Details
remodel of an existing kitchen and four bathrooms within an existing residential bldg. work includes installation of new railings along a rear deck and reconstruction of a set on interior stairs. new recessed lighting. | $96,000 |
| Feb 22, 2012 | Completed final sign-off May 2012 | 744 Clementina St | Domus Construction & Design | refer to pa# 2011-0912-4430, 2011-0504-5391, 2011-0211-0085 & 2011-0128-9241-replace (e) 4x12 in kitchen's (3 total) in kind. work for unit's #2, 4 & 6Details
refer to pa# 2011-0912-4430, 2011-0504-5391, 2011-0211-0085 & 2011-0128-9241-replace (e) 4x12 in kitchen's (3 total) in kind. work for unit's #2, 4 & 6 | $900 |