3850 17th St
connecting the new 6" ductile iron pipe to the existing 6" service provided city. install a new 6" dca wilkins 350 where shown on the plan. install new 6" ductile iron pipe from the dca to building. the asr to be outside of the building.
- Outcome
- Completed (city status: complete, Jun 14, 2022)
- Filed
- May 13, 2021
- Permit issued
- Jul 15, 2021
- Final sign-off
- Jun 14, 2022
- Declared cost
- $25,700
- Neighborhood
- Castro/Upper Market
- Contractor
- Blackwell General Engineering Inc (license 394004)
- Property
- All permits at this address (block 3564, lot 049)
Everyone on the permit
The parties and license numbers written on the permit, as the city lists them; not a check with any state board. The person who paid the fee and the project contact are not shown.
- Contractor
- Blackwell General Engineering Inc (license 394004)
- Authorized agent-others
- Mark Blackwell (no license listed), applicant