Permit 202104017756
249 Eddy St
as-built ref pa# 2020 0824 2498 add of monitor modules connected to the sprinkler water flow and tamper switch at every floor, one tamper switch was added on ground floor, modules were added to monitor fsds and also the acclimate, add 2 smokes
- Outcome
- Completed (city status: complete, Aug 30, 2024)
- Filed
- Apr 1, 2021
- Permit issued
- Apr 19, 2021
- Final sign-off
- Aug 30, 2024
- Building use
- apartments
- Neighborhood
- Tenderloin
- Contractor
- San Francisco Fire Protection (license 806216)
- Property
- All permits at this address (block 0339, lot 015A)