# 2108 Broadway

Permit 202011249600. Page: https://www.permitgraph.org/p/202011249600

at unit 1: remove secondary tsair 7 add new stairway to connect 3rd/4th floor. add secondary elevator for access to unit from parking level. at unit 2: reconfigure main entry to side yard, replace main stair, add bed & bathroom at 1st fl. maher n/a

- Outcome: Never finaled (city status: filed, Nov 24, 2020)
- Filed: Nov 24, 2020
- Declared cost: $300,000
- Building use: apartments
- Neighborhood: Pacific Heights
- Contractor: [L H Construction](https://www.permitgraph.org/contractor/l-h-construction-758684) (license 758684)
- Project type: Stairs, Bathroom remodel
- Property: [All permits at this address](https://www.permitgraph.org/a/0565/008) (block 0565, lot 008)

## Everyone on the permit

The parties and license numbers written on the permit, as the city lists them; not a check with any state board. The person who paid the fee and the project contact are not shown.

- Contractor: [L H Construction](https://www.permitgraph.org/contractor/l-h-construction-758684) (license 758684)
- Architect: [Greg Iboshi](https://www.permitgraph.org/professional/greg-iboshi-C27547), Huang Iboshi Architecture (license C27547), applicant
- Engineer: [Donald David](https://www.permitgraph.org/professional/donald-david-S3928), Double D Engineering (license S3928)
- Pmt consultant/expediter: Kyle Sheehy, B & B Contractors Svcs (no license listed)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/p/202011249600.
