# 350 San Jose Av

Permit 201804035430. Page: https://www.permitgraph.org/p/201804035430

addition of 8 units & 1 adu to an (e) 4 dwelling unit bldg: 5 one-bedrm units & 8 two-bedrm units (13 total); addition will consist of: horizontal addition to 45% setback line; one story vertical addition to (e) 2-story bldg; excavation of (e) garage to add basement level and open space.

- Outcome: Completed (city status: complete, Oct 3, 2024)
- Filed: Apr 3, 2018
- Permit issued: Jun 13, 2022
- Final sign-off: Oct 3, 2024
- Declared cost: $3,556,000
- Building use: apartments
- Neighborhood: Mission
- Contractor: [Transatlantic Construction Company](https://www.permitgraph.org/contractor/transatlantic-construction-company-587416) (license 587416)
- Property: [All permits at this address](https://www.permitgraph.org/a/6532/010A) (block 6532, lot 010A)

## Everyone on the permit

The parties and license numbers written on the permit, as the city lists them; not a check with any state board. The person who paid the fee and the project contact are not shown.

- Contractor: [Transatlantic Construction Company](https://www.permitgraph.org/contractor/transatlantic-construction-company-587416) (license 587416)
- Engineer: [Bahman Ghassemzadeh](https://www.permitgraph.org/professional/bahman-ghassemzadeh-C75941), Bahman Ghassenmzadeh (license C75941)
- Engineer: [Erwin O'toole](https://www.permitgraph.org/professional/erwin-o-toole-C80734) (license C80734)
- Authorized agent: Kevin Cassidy (no license listed)
- Authorized agent: Sally Szeto, Sia Consulting (no license listed)

---