# Xl Construction, Corporation

Contractor license 647480. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/xl-construction-corporation-647480
- JSON: https://www.permitgraph.org/api/contractor?license=647480
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=647480

56 permits since 2000: 50 completed, 4 in progress, 2 never finaled. Typically 10 days from filing to permit and 200 days from permit to final inspection. Of the 2 never-finaled permits, 2 are 5 to 10 years old.

- Based in: Milpitas
- On San Francisco permits: Feb 2005 to May 2026
- Last 24 months: 5 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2005 | 1 | 0 | 0 | 0 |
| 2006 | 3 | 0 | 0 | 0 |
| 2009 | 1 | 0 | 0 | 0 |
| 2014 | 14 | 0 | 0 | 0 |
| 2015 | 4 | 0 | 0 | 0 |
| 2018 | 3 | 0 | 0 | 0 |
| 2019 | 10 | 0 | 0 | 0 |
| 2020 | 1 | 0 | 0 | 0 |
| 2021 | 7 | 0 | 2 | 0 |
| 2022 | 5 | 0 | 0 | 0 |
| 2025 | 0 | 1 | 0 | 0 |
| 2026 | 1 | 3 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Stairs | 2 | 2 | 0 | 0 | 0 | 68 | 319 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202605282040](https://www.permitgraph.org/p/202605282040) | May 28, 2026 | In progress: issued Jun 2026 | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | revision to 202602266592. revised floor plan and associated mep | $65,000 |
| [202604159446](https://www.permitgraph.org/p/202604159446) | Apr 15, 2026 | In progress: issued Apr 2026 | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | 6/fl- deffered structural for equipment anchorage |  |
| [202602266592](https://www.permitgraph.org/p/202602266592) | Feb 26, 2026 | In progress: issued Apr 2026 | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | 6th fl, sector 2b ti for mri suite | $6,100,500 |
| [202601123690](https://www.permitgraph.org/p/202601123690) | Jan 12, 2026 | Completed: final sign-off Feb 2026 | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | 6/f: interior non-structural demo only per ab-017. | $50,000 |
| [202506128629](https://www.permitgraph.org/p/202506128629) | Jun 12, 2025 | In progress: issued Jul 2025 | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | level 8 and level 9, 2 new privacy pods on level 8. 3 new privacy pods on level 9. the installation of these pods include associated structural, electrical & sprinkler installation defered. | $50,000 |
| [202208039804](https://www.permitgraph.org/p/202208039804) | Aug 3, 2022 | Completed: final sign-off Oct 2022 | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | evacuation map for floor 8-12 sector 1 | $3,000 |
| [202208019663](https://www.permitgraph.org/p/202208019663) | Aug 1, 2022 | Completed: final sign-off Aug 2024 | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | tenant improvement on the 4th and 5th floors of an existing 12-story building. scope of work includes office and labratories (changing occupancy from b to l) with associated mechancial, plumbing, and… | $6,000,000 |
| [202207259239](https://www.permitgraph.org/p/202207259239) | Jul 25, 2022 | Completed: final sign-off Mar 2024 | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | selective demo in preparation for t.i of the 4-7th floor in sector 1 of an (e) 12-story bldg. no structural demo. to comply with ab-017. | $125,000 |
| [202207188717](https://www.permitgraph.org/p/202207188717) | Jul 18, 2022 | Completed: final sign-off Aug 2024 | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | level 6-7: addition of shafts and duct riser only in sector 1 of building. | $250,000 |
| [202207188714](https://www.permitgraph.org/p/202207188714) | Jul 18, 2022 | Completed: final sign-off Aug 2024 | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | level 4-5: addition of shafts and duct riser only in sector 1 of building. | $240,000 |
| [202111293210](https://www.permitgraph.org/p/202111293210) | Nov 29, 2021 | Completed: final sign-off May 2022 | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | 7th floor: shaft enclusures at 7th floor.minor t.i. for future work. | $5,000 |
| [202110210946](https://www.permitgraph.org/p/202110210946) | Oct 21, 2021 | Completed: final sign-off May 2022 | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | levels 8 + 9. work includes (n) huddles rooms break room, shaft connections (for future use) + associated finishes + mep |  |
| [202109017583](https://www.permitgraph.org/p/202109017583) | Sep 1, 2021 | Completed: final sign-off Dec 2021 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | t.i. adding non bearing partitions, fixtures, mep. fire suppression under separate permit. ref partial t.i. work on 5th fl 2020 1222 1526. | $755,762 |
| [202108166488](https://www.permitgraph.org/p/202108166488) | Aug 16, 2021 | Completed: final sign-off Aug 2022 | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | addition of shafts on floors 10, 11, &12 of the building | $250,000 |
| [202108025538](https://www.permitgraph.org/p/202108025538) | Aug 2, 2021 | Completed: final sign-off Nov 2022 | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | t.i.build out & change of use on the 10th,11th & 12th floors (all in sector)scope of work include office & laboratories (l occupancy)with associated mechanical, plumbing & electrical requirements. | $10,000,000 |
| [202107164578](https://www.permitgraph.org/p/202107164578) | Jul 16, 2021 | Never finaled: issued Jul 2021, no final | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | addition of 0,2 depletion sensors @ 1/f & 5/f gas storage areas associated w/(e) compressed gas distribution system under bpa#202106031593 & t.i. permit 202012221526 | $2,000 |
| [202106031593](https://www.permitgraph.org/p/202106031593) | Jun 3, 2021 | Completed: final sign-off Jun 2021 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | modification to e compressed gas distribution system serving ti under 202012221526. modification includes (n) piping runs from (e) storage room at level 1 to renovated areas at level 5 | $1,000 |
| [202105110190](https://www.permitgraph.org/p/202105110190) | May 11, 2021 | Never finaled: issued May 2021, no final | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | revisions to pa# 201909121454 & 201909121458. minor revisions to 8th & 9th fl consisting of new huddle rooms, breakrooms, finishes, millwork, cieling & associated electrical, mechanical & plumbing wo… |  |
| [202104148565](https://www.permitgraph.org/p/202104148565) | Apr 14, 2021 | Completed: final sign-off Jan 2022 | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | 10/f,11/f,12/f - selective demo in preparation for tenant improcements. soft demo does not include structural demo or demo of rated construction needed to maintain core x shell conditions for life sa… | $60,000 |
| [202012221526](https://www.permitgraph.org/p/202012221526) | Dec 22, 2020 | Completed: final sign-off Jun 2021 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | 5th fl: tenant improvement. fire suppression system under sep permit. deffered fire sprinklers & life safety system to remain operational during construction and alterations to be system will be desi… | $850,000 |
| [201908158903](https://www.permitgraph.org/p/201908158903) | Aug 15, 2019 | Completed: final sign-off Apr 2021 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/032) | 5th flr lab/freezer storage only - interior demo. non structural demo only of non rated construction per ab017, space to remain vacant until accessible features are restored. | $12,000 |
| [201904299173](https://www.permitgraph.org/p/201904299173) | Apr 29, 2019 | Completed: final sign-off Aug 2019 | [360 03rd St](https://www.permitgraph.org/a/3751/157) | revision to 201901281353 to provide structural drawings and calculations for equip weighing over 450 lbs. inclucing manifold system. ups support system and fishtank support as shown on ti permit,mahe… |  |
| [201904047074](https://www.permitgraph.org/p/201904047074) | Apr 4, 2019 | Completed: final sign-off Jan 2020 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | 7th fl - mep for tenant improvement ref pa 2019-0319-5583 | $500,000 |
| [201904047075](https://www.permitgraph.org/p/201904047075) | Apr 4, 2019 | Completed: final sign-off Jan 2020 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | 5th fl - mep for tenant improvement ref pa 2019-0319-5584 | $500,000 |
| [201903225977](https://www.permitgraph.org/p/201903225977) | Mar 22, 2019 | Completed: final sign-off May 2021 | [1700 California St](https://www.permitgraph.org/a/0642/037) | (n) generator at level g5. sffd requested this permit be submitted separately from pa# 2018-1205-7469. which it orignally was part. payment for this permit is under first permit. generator for kaiser… |  |
| [201903195584](https://www.permitgraph.org/p/201903195584) | Mar 19, 2019 | Completed: final sign-off Jan 2020 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | 5th fl project consist of buildout of 1 floor of leased warm shell space. program includes counselor offices, group therapy rooms, reception and staff support spaces mep deferred maher not req | $883,000 |
| [201903195583](https://www.permitgraph.org/p/201903195583) | Mar 19, 2019 | Completed: final sign-off Jan 2020 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | 7th fl build out of 1 floor leased warm shell space. program includes counselor offices, group therapy rooms, reception and staff support spaces. mep defered non osh facility | $883,000 |
| [201903135077](https://www.permitgraph.org/p/201903135077) | Mar 13, 2019 | Completed: final sign-off Jan 2020 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | 6th floor: mechanical, electrical and plumbing for 201903114897 | $567,000 |
| [201903114897](https://www.permitgraph.org/p/201903114897) | Mar 11, 2019 | Completed: final sign-off Jan 2020 | [939 Ellis St](https://www.permitgraph.org/a/0738/019) | 6th flr - this project consist of buildout of one floor of leased warm shell space. program includes councilor offices; therapy room, reception area and staff support spaces. mep | $883,000 |
| [201901281353](https://www.permitgraph.org/p/201901281353) | Jan 28, 2019 | Completed: final sign-off Aug 2019 | [360 03rd St](https://www.permitgraph.org/a/3751/157) | 7th fl - ti of office to include non structural improvement of office area, break room (no food service), mep improvement. sprinkler, & fire safety under separate permit. no exterior work | $7,273,098 |
| [201812067656](https://www.permitgraph.org/p/201812067656) | Dec 6, 2018 | Completed: final sign-off Jun 2019 | [360 03rd St](https://www.permitgraph.org/a/3751/157) | interior soft demo on 7th floor office space. approx 26,500 sf. no exterior work, no cou, sprinkler permit under sep permit | $100,000 |
| [201812057469](https://www.permitgraph.org/p/201812057469) | Dec 5, 2018 | Completed: final sign-off Nov 2020 | [1700 California St](https://www.permitgraph.org/a/0642/037) | (4th & 2nd flrs, g5 & g2) ti of (e) office space. (n) outpatient ivf and reproductive med office clinic. (n) fuel port installation & (n) mechanical unit. (non-oshpd3 review) (fire alarm & sprinklers… | $2,400,000 |
| [201811065181](https://www.permitgraph.org/p/201811065181) | Nov 6, 2018 | Completed: final sign-off May 2019 | [360 03rd St](https://www.permitgraph.org/a/3751/157) | demo per ab-017 of 29,500 sf of (e) offices in ste 700 partitions, electrical, data cabling, ceilings, and flooring to be removed, temp const. barrier to be provided between ste 700 & 750, mep is des… | $5,000 |
| [201510281068](https://www.permitgraph.org/p/201510281068) | Oct 28, 2015 | Completed: final sign-off Apr 2016 | [343 Sansome St](https://www.permitgraph.org/a/0239/030) | 5th floor, suite 505: interior ti of (e) office maher na replace finishes, demo partition walls, replace suite entry door, add eating counter and casework. | $42,000 |
| [201510099361](https://www.permitgraph.org/p/201510099361) | Oct 9, 2015 | Completed: final sign-off Aug 2016 | [1 Daniel Burnham Ct](https://www.permitgraph.org/a/0690/017) | exploratory demo: to verify low voltage wiring & plumbing line location; no structural work under this permit. | $8,000 |
| [201503029747](https://www.permitgraph.org/p/201503029747) | Mar 2, 2015 | Completed: final sign-off Jun 2015 | [555 California St](https://www.permitgraph.org/a/0259/026) | 2nd and 3rd floor: show location of card reader locations on egress drawings per fire dept. ref. appl. 201406279698 & 201406279703. maher n/a. card readers were shown/approved under bpa#201406279698 |  |
| [201501095359](https://www.permitgraph.org/p/201501095359) | Jan 9, 2015 | Completed: final sign-off Jun 2015 | [555 California St](https://www.permitgraph.org/a/0259/026) | 2nd floor -revision to pa #2014.1029.0262 & 2014.0808.3436: changes include incorporation of (n) shear walls & video monitors. mep under separate permit. n/a maher ordinance |  |
| [201410300335](https://www.permitgraph.org/p/201410300335) | Oct 30, 2014 | Completed: final sign-off Dec 2014 | [555 California St](https://www.permitgraph.org/a/0259/026) | 1st floor - temperary removal and replacement in kind of (e) ceilings to inspect new plumbing infrastructural needed as point of the work associated with bldg. appl. 2014.0627.9698. haher n/a. | $10,000 |
| [201410290263](https://www.permitgraph.org/p/201410290263) | Oct 29, 2014 | Completed: final sign-off Apr 2015 | [555 California St](https://www.permitgraph.org/a/0259/026) | revision to app#201406279703. revision to conference room change from non rated to rated partition at corridor b and minor plant ceiling revisions in response to field conditions and client request.… |  |
| [201410290264](https://www.permitgraph.org/p/201410290264) | Oct 29, 2014 | Completed: final sign-off Apr 2015 | [555 California St](https://www.permitgraph.org/a/0259/026) | 2/f: revision to app#201406279698. revisions include minor plan and ceiling revisions in response to field conditions and client requests and incorporation of cold formed framing details. n/a for the… |  |
| [201410290262](https://www.permitgraph.org/p/201410290262) | Oct 29, 2014 | Completed: final sign-off Jun 2015 | [555 California St](https://www.permitgraph.org/a/0259/026) | revision to app#201408083436. changes include change from glass guardrail to cable rail and incorporation of a smoke curtain. n/a for the maher. |  |
| [201408083436](https://www.permitgraph.org/p/201408083436) | Aug 8, 2014 | Completed: final sign-off Jun 2015 | [555 California St](https://www.permitgraph.org/a/0259/026) | (n) connecting stair between 2nd & 3rd floors for tenant. revision to t.i. permits 2014-0627-9698 & 2014-0627-9703. draft curtains and sprinklers under sep. permit maher n/a | $140,000 |
| [201406279703](https://www.permitgraph.org/p/201406279703) | Jun 27, 2014 | Completed: final sign-off Jun 2015 | [555 California St](https://www.permitgraph.org/a/0259/026) | 3rd flr: t.i. of approx 24,650 sq.ft. for office space incl private offices, meeting rms & powered work stations,work includes (n) pantries, restrooms, closets, and (2) large conference rms, (accesso… | $2,500,000 |
| [201406279698](https://www.permitgraph.org/p/201406279698) | Jun 27, 2014 | Completed: final sign-off Apr 2015 | [555 California St](https://www.permitgraph.org/a/0259/026) | 2nd flr: approx 19000 sq.ft. tenant improvement of a class "a"office space on the 2nd flr including private offices, meeting rooms & powered workstations, construction of (n) pantries, restrooms, & c… | $2,500,000 |
| [201404223896](https://www.permitgraph.org/p/201404223896) | Apr 22, 2014 | Completed: final sign-off Dec 2014 | [120 Kearny St](https://www.permitgraph.org/a/0292/008) | revised layout of restroom partitions per pa# 201403120525 |  |
| [201404223897](https://www.permitgraph.org/p/201404223897) | Apr 22, 2014 | Completed: final sign-off Dec 2014 | [120 Kearny St](https://www.permitgraph.org/a/0292/008) | revised layout of restroom partitons per pa # 201403110475 |  |
| [201404153280](https://www.permitgraph.org/p/201404153280) | Apr 15, 2014 | Completed: final sign-off Jul 2015 | [120 Kearny St](https://www.permitgraph.org/a/0292/008) | 19th floor: revision to app#201403120525. construction of structural partitions and finishes. n/a for the maher ordinance #155-13 mep, fire alarm and sprinklers separate permit. |  |
| [201403120525](https://www.permitgraph.org/p/201403120525) | Mar 12, 2014 | Completed: final sign-off Sep 2014 | [120 Kearny St](https://www.permitgraph.org/a/0292/008) | 19th floor:demolition of extg non-structural interior partitions, doors, frames, hardware, millwork, ceilings, finishes, mep, construction of non-structural partitions, doors, frames, hardware, millw… | $1,375,000 |
| [201403110475](https://www.permitgraph.org/p/201403110475) | Mar 11, 2014 | Completed: final sign-off Sep 2014 | [120 Kearny St](https://www.permitgraph.org/a/0292/008) | 20/f-demol (e) non-structural int partitoins in restroom,doors,frames, hardware,millwork,ceiling, finishes, mep. construction of non-structural partitions, doors, frames, hardware, millwrok & acousti… | $1,375,000 |
| [201403049836](https://www.permitgraph.org/p/201403049836) | Mar 4, 2014 | Completed: final sign-off Sep 2014 | [1 Montgomery St](https://www.permitgraph.org/a/0292/002) | selective demolition of acoustical ceilings, existing mechanical ductwork, light fixtures and drywall partitions. scope of work on 19th and 20th floors. demo per ab-017. | $150,000 |
| [201401226787](https://www.permitgraph.org/p/201401226787) | Jan 22, 2014 | Completed: final sign-off Jun 2014 | [1580 Valencia St](https://www.permitgraph.org/a/6575/001) | suite #802- remodel of 2 suites into one large suite, provide accessible exams and corridors. life safety permits separate compliance with ordinance #155-13 not required. | $493,000 |
| [200904075715](https://www.permitgraph.org/p/200904075715) | Apr 7, 2009 | Completed: final sign-off Jul 2010 | [755 Ashbury St](https://www.permitgraph.org/a/1254/011) | remove/replace existing fire exit stair w/ a code compliant exit stair, removal of (e) windows on 3rd & 4th floor, to be replaced w/ egress doors, removal/replace of (e) egress doors on 2nd floor, re… | $150,000 |
| [200604118688](https://www.permitgraph.org/p/200604118688) | Apr 11, 2006 | Completed: final sign-off Jul 2006 | [270 Masonic Av](https://www.permitgraph.org/a/1111/002) | revision to approved pa# 2006/03/23/7367. new 3'-0" high x 12" wide buttress @ 7'-2 1/2" o.c. attached to (e) concrete retaining wall. | $2,000 |
| [200603237367](https://www.permitgraph.org/p/200603237367) | Mar 23, 2006 | Completed: final sign-off Jul 2006 | [270 Masonic Av](https://www.permitgraph.org/a/1111/002) | add to (e) permit: new structurals foundation for owners equipment (condensers for freezer s) owners requipment condenser units to be under separate permit. | $8,000 |
| [200603166787](https://www.permitgraph.org/p/200603166787) | Mar 16, 2006 | Completed: final sign-off Jun 2006 | [270 Masonic Av](https://www.permitgraph.org/a/1111/002) | revise 200511228850, 200601313445. install walk in freezer and piping (new). sprinkler under separte permit | $95,000 |
| [200502034765](https://www.permitgraph.org/p/200502034765) | Feb 3, 2005 | Completed: final sign-off May 2005 | [270 Masonic Av](https://www.permitgraph.org/a/1111/002) | minor modifications to appl#200405113517 increase in interior ramp length due to scope(from 18'to19' | $11,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/xl-construction-corporation-647480.