Back to bathroom remodel contractors
William Gregory Clause
- Based in
- San Francisco
- On San Francisco permits
- Mar 2004 to Mar 2025
- Last 24 months
- 5 permits filed
234 permits since 2000: 212 completed, 1 in progress, 12 never finaled, 9 expired or cancelled.
Of the 12 never-finaled permits, 4 are 5 to 10 years old, 8 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
109 bathroom remodel permits: 107 completed, 2 expired or cancelled. Typically 0 days from filing to permit and 181 days from permit to final inspection.
Showing the 100 most recent of 109.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 12, 2024 | Completed final sign-off Aug 2025 | 428 Corbett Av | 3/f: remodel existing kitchen and bathroom.Details
3/f: remodel existing kitchen and bathroom. | $65,000 |
| May 31, 2024 | Completed final sign-off Nov 2024 | 1105 Bosworth St | remodel (e) 1st fl. bath in place, replace (1) window at south side not visible from streetDetails
remodel (e) 1st fl. bath in place, replace (1) window at south side not visible from street | $42,000 |
| Apr 22, 2024 | Completed final sign-off Jan 2025 | 816 Ortega St | relocate full bath and install new bath (2) new windows not visible from the streetDetails
relocate full bath and install new bath (2) new windows not visible from the street | $110,000 |
| Apr 3, 2023 | Completed final sign-off Jun 2025 | 54 States St | remodel e 2nd flr kitchen, reconfigure bathroom at 1st flr, infill under entry stair landing to add new bathroom and laundry at 1st flr, 2 new windows (not visible from street).Details
remodel e 2nd flr kitchen, reconfigure bathroom at 1st flr, infill under entry stair landing to add new bathroom and laundry at 1st flr, 2 new windows (not visible from street). | $110,000 |
| Nov 3, 2022 | Completed final sign-off Dec 2023 | 333 Haight St | unit 4: interior renovation including kitchen and 2 baths; add new bath; replace windows and add 2 windows (not visible from street)Details
unit 4: interior renovation including kitchen and 2 baths; add new bath; replace windows and add 2 windows (not visible from street) | $290,000 |
| Jan 19, 2022 | Completed final sign-off Dec 2023 | 4309 19th St | remove wall and replace sliding glass door in ground floor kitchen, replace plumbing fixtures in bathroom on ground floor, extend 2nd floor bedroom over one story kitchen below and add full bathroom in bedroom. new lighting and electrical in areas of work.Details
remove wall and replace sliding glass door in ground floor kitchen, replace plumbing fixtures in bathroom on ground floor, extend 2nd floor bedroom over one story kitchen below and add full bathroom in bedroom. new lighting and electrical in areas of work. | $125,000 |
| Sep 16, 2021 | Completed final sign-off May 2025 | 54 States St | remodel e 3rd fl kitchen, reconfigure e 2 baths at 3rd fl, new window not visible from street. new skylight and parapetDetails
remodel e 3rd fl kitchen, reconfigure e 2 baths at 3rd fl, new window not visible from street. new skylight and parapet | $85,000 |
| Feb 22, 2021 | Completed final sign-off May 2021 | 701 Minnesota St | remodel bath in place-new fixtures, tile, vanity, high efficancy lightingDetails
remodel bath in place-new fixtures, tile, vanity, high efficancy lighting | $20,000 |
| Dec 1, 2020 | Completed final sign-off Aug 2022 | 4732 Fulton St | convert garage space to habitable living space, new bath, new stair from 1st to 2nd fl. new door to rear year. (2) new windows (not visible from street)Details
convert garage space to habitable living space, new bath, new stair from 1st to 2nd fl. new door to rear year. (2) new windows (not visible from street) | $150,000 |
| Dec 1, 2020 | Completed final sign-off Jun 2024 | 4348 26th St | reconfigure 2 interior stairs,convert some unconditioned space to habitaable on lower level; remodel 1 bath,relocate 1 bath,remodel kitchen,replace 5 pairs sliders at rear, removed 2 wood burning fireplaces.add 1 new gas fireplace, add 3 stop elevator, 2 new skylights.Details
reconfigure 2 interior stairs,convert some unconditioned space to habitaable on lower level; remodel 1 bath,relocate 1 bath,remodel kitchen,replace 5 pairs sliders at rear, removed 2 wood burning fireplaces.add 1 new gas fireplace, add 3 stop elevator, 2 new skylights. | $450,000 |
| Sep 25, 2020 | Completed final sign-off Mar 2021 | 64 Divisadero St | remodel bath in place, no walls moved. new fixtures, tile, vanity.Details
remodel bath in place, no walls moved. new fixtures, tile, vanity. | $28,000 |
| Sep 11, 2020 | Completed final sign-off Feb 2021 | 363 Princeton St | kitchen remodel in kind; no walls moved; new cabinets, counter appliances; bath remodl in kind - no walls moved; new fixtures, vanity, tileDetails
kitchen remodel in kind; no walls moved; new cabinets, counter appliances; bath remodl in kind - no walls moved; new fixtures, vanity, tile | $65,000 |
| Jul 21, 2020 | Completed final sign-off Jun 2021 | 1212 08th Av | remodel kitchen in place - new cabinets, counters, appliances, remove new bearing wall. remodel bath - new tile, vanity, fixtures. add 1/2 bath at former pantry.Details
remodel kitchen in place - new cabinets, counters, appliances, remove new bearing wall. remodel bath - new tile, vanity, fixtures. add 1/2 bath at former pantry. | $95,000 |
| Jul 15, 2020 | Completed final sign-off Apr 2021 | 926 Grove St | remodel bath in place no walls moved, new fixitures, tile replace hardwood floors.Details
remodel bath in place no walls moved, new fixitures, tile replace hardwood floors. | $30,000 |
| Jul 8, 2020 | Completed final sign-off Jun 2021 | 362 Lexington St | remodel bath in place. new fixtures tile. high deffiency lighting,no walls moved. work to be done at 2nd floor.Details
remodel bath in place. new fixtures tile. high deffiency lighting,no walls moved. work to be done at 2nd floor. | $22,000 |
| Feb 27, 2020 | Completed final sign-off Sep 2020 | 1998 Broadway | remodel kitchen in kind. no walls moved. replace vanity in (2) bathrooms. all work in kind.Details
remodel kitchen in kind. no walls moved. replace vanity in (2) bathrooms. all work in kind. | $45,000 |
| Jan 8, 2020 | Completed final sign-off Jun 2021 | 1212 08th Av | remove fireplace upstairs, add interior stair from upper to lower level. convert existing storage to bedroom & lounge, add bathroom at first level.Details
remove fireplace upstairs, add interior stair from upper to lower level. convert existing storage to bedroom & lounge, add bathroom at first level. | $250,000 |
| Dec 19, 2019 | Completed final sign-off Feb 2020 | 42 Littlefield Tr | remodel 2 bathrooms in kind. new shower, tub tiles, vanity. h.e lighting- no wals move. new on damand water heater in attic "comply with ced 150.1(a.c) req." with hall access. 35&45 sq ft bathroomDetails
remodel 2 bathrooms in kind. new shower, tub tiles, vanity. h.e lighting- no wals move. new on damand water heater in attic "comply with ced 150.1(a.c) req." with hall access. 35&45 sq ft bathroom | $35,000 |
| Oct 17, 2019 | Completed final sign-off Jan 2020 | 733 Joost Av | remodel 40sq ft bath- new fixtures, new tile, high efficacy lighting- no walls moved.Details
remodel 40sq ft bath- new fixtures, new tile, high efficacy lighting- no walls moved. | $18,000 |
| Aug 28, 2019 | Completed final sign-off Jan 2020 | 1107 Castro St | remodel 1 (e) bath to create 1 full bath + 1 half bath. move front door to recess, reconfigure bedroom doors to fit new abthrm configurations. fix leaj @ (e) entry corridor/Details
remodel 1 (e) bath to create 1 full bath + 1 half bath. move front door to recess, reconfigure bedroom doors to fit new abthrm configurations. fix leaj @ (e) entry corridor/ | $10,000 |
| May 16, 2019 | Completed final sign-off Oct 2019 | 70 Divisadero St | remodel in place 1 56sq feet full bathroom, 1 12sq feet half bath. new fixture, vanities, tile and high efficacy lighting. nw walls moved. same foot print.Details
remodel in place 1 56sq feet full bathroom, 1 12sq feet half bath. new fixture, vanities, tile and high efficacy lighting. nw walls moved. same foot print. | $30,000 |
| Mar 29, 2019 | Completed final sign-off Jan 2020 | 1476 07th Av | remove existing non-permitted improvements on and reconfigure existing 1st floor - convert unconditioned storage and garage space to living space and relocate/add bathroom, add bedroom; add exterior stair from 2nd fl to rear yard.Details
remove existing non-permitted improvements on and reconfigure existing 1st floor - convert unconditioned storage and garage space to living space and relocate/add bathroom, add bedroom; add exterior stair from 2nd fl to rear yard. | $190,285 |
| Apr 10, 2018 | Completed final sign-off Dec 2018 | 201 Buchanan St | remodel (e) bathroom - new fixtures and finsihes, remodel (e) family room - new electrical fixtures and finishesDetails
remodel (e) bathroom - new fixtures and finsihes, remodel (e) family room - new electrical fixtures and finishes | $55,000 |
| Apr 5, 2018 | Completed final sign-off Jul 2019 | 36 Seward St | kitchen renovation at new location. convert half bath to full bath on 2nd floor. full bath renovation at 3rd floor. sheetrock garage and storage. install 5 new windows at rear not visible to street.Details
kitchen renovation at new location. convert half bath to full bath on 2nd floor. full bath renovation at 3rd floor. sheetrock garage and storage. install 5 new windows at rear not visible to street. | $200,000 |
| Apr 4, 2018 | Completed final sign-off Aug 2018 | 1475 Noe St | remodel master bath in place. new fixtures, new vanity, tile.Details
remodel master bath in place. new fixtures, new vanity, tile. | $19,000 |
| Mar 23, 2018 | Completed final sign-off Aug 2018 | 1475 Noe St | remodel (2) full and (1) 1/2 baths, new vanities, tile, fixturesDetails
remodel (2) full and (1) 1/2 baths, new vanities, tile, fixtures | $35,000 |
| Mar 5, 2018 | Completed final sign-off Aug 2019 | 1720 Larkin St | remodel of 2 units: unit #1 relocate kitchen, remodel bathroom and add 2 new bathroom. unit #2: relocate kitchen remodel 2 bathroom. 3rd unit - relocate kitchen - add bath - remodel (e) bathDetails
remodel of 2 units: unit #1 relocate kitchen, remodel bathroom and add 2 new bathroom. unit #2: relocate kitchen remodel 2 bathroom. 3rd unit - relocate kitchen - add bath - remodel (e) bath | $50,000 |
| Nov 17, 2017 | Completed final sign-off Mar 2018 | 849 Dolores St | bathroom remodel, new hardwood floor, lights, and cabinet. replace windows, and create storageDetails
bathroom remodel, new hardwood floor, lights, and cabinet. replace windows, and create storage | $60,000 |
| Oct 26, 2017 | Completed final sign-off Jan 2018 | 218 26th Av | remodel bath in place: new vanity, shower pan, tiles, fixturesDetails
remodel bath in place: new vanity, shower pan, tiles, fixtures | $15,000 |
| Oct 23, 2017 | Completed final sign-off Jan 2018 | 80 Venus St | work on garage level- convert closet at bath on 1st floor to shower, add partition wall to storage area.Details
work on garage level- convert closet at bath on 1st floor to shower, add partition wall to storage area. | $18,000 |
| Sep 6, 2017 | Completed final sign-off Nov 2017 | 2251 Washington St | remodel bath in place - new tile, fixtures, vanity, new high efficacy lighting, new flooring throughout.Details
remodel bath in place - new tile, fixtures, vanity, new high efficacy lighting, new flooring throughout. | $32,000 |
| May 3, 2017 | Completed final sign-off May 2017 | 3448 19th St | remodel kitchen, in kind - new cabinets, countertops, fixtures, tiles. redel bath in kind - new fixtures, tiles. replace (2) windows in (e) openings. not visible from street.Details
remodel kitchen, in kind - new cabinets, countertops, fixtures, tiles. redel bath in kind - new fixtures, tiles. replace (2) windows in (e) openings. not visible from street. | $40,000 |
| May 3, 2017 | Completed final sign-off May 2017 | 3446 19th St | remodel kitchen, in kind - new cabinets, countertops, fixtures, tiles. redel bath in kind - new fixtures, tiles. replace (2) windows in (e) openings. not visible from street.Details
remodel kitchen, in kind - new cabinets, countertops, fixtures, tiles. redel bath in kind - new fixtures, tiles. replace (2) windows in (e) openings. not visible from street. | $40,000 |
| Mar 29, 2017 | Completed final sign-off Jun 2017 | 45 Henry St | apt #2: revision to 201701278062 - replace windows at lightwell kitchen and slider at living area - not visible from street. move 1 partition wall at bath, change door location at closet, add door from foyer to bedroom, close-up bath window, repair dryrot at sliderDetails
apt #2: revision to 201701278062 - replace windows at lightwell kitchen and slider at living area - not visible from street. move 1 partition wall at bath, change door location at closet, add door from foyer to bedroom, close-up bath window, repair dryrot at slider | $9,000 |
| Jan 27, 2017 | Completed final sign-off Jun 2017 | 45 Henry St | remodel kitchen in place, new cabinets, counters, remodel bath in place, new fixtures, tile no walls moved.( unit # 2)Details
remodel kitchen in place, new cabinets, counters, remodel bath in place, new fixtures, tile no walls moved.( unit # 2) | $55,000 |
| Aug 3, 2016 | Completed final sign-off Apr 2017 | 1105 Castro St | 3rd floor - add toilet to (e) bath; add shower & vanity to toilet room. move washer/dryer connections from 2nd floor to 3rd floor. no walls removedDetails
3rd floor - add toilet to (e) bath; add shower & vanity to toilet room. move washer/dryer connections from 2nd floor to 3rd floor. no walls removed | $28,000 |
| Aug 1, 2016 | Completed final sign-off Nov 2016 | 1450 Post St | remodel bathroom & kitchen. no walls moved.Details
remodel bathroom & kitchen. no walls moved. | $38,000 |
| Jun 30, 2016 | Completed final sign-off Feb 2018 | 1111 Bay St | remodel bath in place. new fixtures, tile, vanity, new highefficacy lighting. no walls removed.Details
remodel bath in place. new fixtures, tile, vanity, new highefficacy lighting. no walls removed. | $25,000 |
| Jan 21, 2016 | Completed final sign-off Aug 2016 | 423 Eureka St | interior remodel. remove wall between kitchen, dining rm. replace cabinets, counters, appliances at kitchen, new high eff lighting, remodel bath, new fixtures, tile. add 1/2 bathDetails
interior remodel. remove wall between kitchen, dining rm. replace cabinets, counters, appliances at kitchen, new high eff lighting, remodel bath, new fixtures, tile. add 1/2 bath | $150,000 |
| Dec 22, 2015 | Completed final sign-off May 2016 | 451 Kansas St | apt#368: at (2) bathrooms: replace vanity, fixtures, tile, new h.e. lighting. new wood flooing at (2) bedrooms. no structural work.Details
apt#368: at (2) bathrooms: replace vanity, fixtures, tile, new h.e. lighting. new wood flooing at (2) bedrooms. no structural work. | $32,000 |
| Oct 16, 2015 | Completed final sign-off Mar 2016 | 1865 California St | remodel bathroom in-place, new tub, vanity, tilet. remodel kitchen in place, new cabinets, counters, appliances, new light efficiency lighting.Details
remodel bathroom in-place, new tub, vanity, tilet. remodel kitchen in place, new cabinets, counters, appliances, new light efficiency lighting. | $38,000 |
| Aug 7, 2015 | Completed final sign-off Apr 2019 | 450 27th St | 2 story side & rear addition with decks. alter roof line & enlarge 3rd story @ front, sides & rear. modify front facade & add 3rd floor concealed front deck. new retractable skylt for roof access & new roof deck. relocate kit. renovate 2 full baths. add 2 full bahts & 1/2 bath. seismic upgrades.Details
2 story side & rear addition with decks. alter roof line & enlarge 3rd story @ front, sides & rear. modify front facade & add 3rd floor concealed front deck. new retractable skylt for roof access & new roof deck. relocate kit. renovate 2 full baths. add 2 full bahts & 1/2 bath. seismic upgrades. | $550,000 |
| Aug 4, 2015 | Completed final sign-off Mar 2017 | 3446 19th St | convert 1st flr storage to living space for unit #3450 - 1/2 bath, install 3 exterior doors, 7 windows (not visible from street), new foundations & slab on grade.. new patio slabDetails
convert 1st flr storage to living space for unit #3450 - 1/2 bath, install 3 exterior doors, 7 windows (not visible from street), new foundations & slab on grade.. new patio slab | $200,000 |
| Jul 15, 2015 | Completed final sign-off May 2017 | 3446 19th St | vert addition. kit & 2 full baths. (n) elevator from 1st fl to 4th fl & roof. (n) stair from 4th fl to roof. (n) penthouse & rear roof deck (488 sq ft). (3) exterior doors, 21 windows & 2 skylights. not visible from street. fire sprinklers and life safety @ 4th fl & roof under separate permit.Details
vert addition. kit & 2 full baths. (n) elevator from 1st fl to 4th fl & roof. (n) stair from 4th fl to roof. (n) penthouse & rear roof deck (488 sq ft). (3) exterior doors, 21 windows & 2 skylights. not visible from street. fire sprinklers and life safety @ 4th fl & roof under separate permit. | $275,000 |
| Jun 18, 2015 | Completed final sign-off Sep 2015 | 1701 Baker St | bath remodel: new tub, tile, vanity, 1/2 bath remodel 50 sq. ft., replace toilet & sink only, 24 sq. ft.Details
bath remodel: new tub, tile, vanity, 1/2 bath remodel 50 sq. ft., replace toilet & sink only, 24 sq. ft. | $12,000 |
| Jun 11, 2015 | Completed final sign-off Jan 2016 | 92 Sotelo Av | remodel existing kitchen, relocate half bath @ ground floor.Details
remodel existing kitchen, relocate half bath @ ground floor. | $55,000 |
| Mar 19, 2015 | Completed final sign-off Feb 2016 | 9 Ord St | convert basement space to living space(450 sq ft) inc full bath. install spiral stair to connect to 1st floor. new foundations and fl. slab & stair to rear yard. install 1 extg door and 3 windows at rear(not visible to street).Details
convert basement space to living space(450 sq ft) inc full bath. install spiral stair to connect to 1st floor. new foundations and fl. slab & stair to rear yard. install 1 extg door and 3 windows at rear(not visible to street). | $110,000 |
| Feb 25, 2015 | Completed final sign-off Jun 2015 | 210 Castro St | install 2nd full bath & laundry, replace 1 window at side lightwell, not visable to street. all work is on the 1st floor over garage level n/a ordinance #155-13.Details
install 2nd full bath & laundry, replace 1 window at side lightwell, not visable to street. all work is on the 1st floor over garage level n/a ordinance #155-13. | $20,000 |
| Feb 13, 2015 | Completed final sign-off Jun 2015 | 1515 Golden Gate Av | remodel bath in place - new fixtures, tile, vanity, new lighting on occupancy sensor, new closets, convert sitting room to new bath.Details
remodel bath in place - new fixtures, tile, vanity, new lighting on occupancy sensor, new closets, convert sitting room to new bath. | $65,000 |
| Dec 24, 2014 | Completed final sign-off May 2015 | 4150 17th St | remodel (2) bath in place new tile, vanity, fixtures, lights on occupancy sensor, kitchen remodel in place -new cabinets, counters, appliancesDetails
remodel (2) bath in place new tile, vanity, fixtures, lights on occupancy sensor, kitchen remodel in place -new cabinets, counters, appliances | $42,000 |
| Dec 15, 2014 | Completed final sign-off May 2015 | 1800 Bryant St | remodel (2) bathrooms -new tile, vanity, plumbing fixtures, new lighting on occupancy sensor; maher n/aDetails
remodel (2) bathrooms -new tile, vanity, plumbing fixtures, new lighting on occupancy sensor; maher n/a | $32,000 |
| Oct 16, 2014 | Completed final sign-off Jun 2015 | 926 Grove St | bath remodel, new vanity, tile, fixtures, kitchen remodel, 2 new cabinets, new counters, new wood flooring at upstairs. no change in layoutDetails
bath remodel, new vanity, tile, fixtures, kitchen remodel, 2 new cabinets, new counters, new wood flooring at upstairs. no change in layout | $40,000 |
| Oct 6, 2014 | Completed final sign-off Jan 2015 | 292 San Jose Av | bathroom remodel - new tub, tile, shower pan, vanity, no changes to electric, wall, window & doorDetails
bathroom remodel - new tub, tile, shower pan, vanity, no changes to electric, wall, window & door | $18,000 |
| Sep 3, 2014 | Completed final sign-off Nov 2014 | 2185 Bush St | unit 210: remodel bath - new tiles, vanity, tub. remodel kitchen - new cabinets, counters, high efficacy lighting. n/a maher ordinance # 155-13Details
unit 210: remodel bath - new tiles, vanity, tub. remodel kitchen - new cabinets, counters, high efficacy lighting. n/a maher ordinance # 155-13 | $22,000 |
| Sep 3, 2014 | Completed final sign-off Mar 2015 | 3946 17th St | remodel kitchen - new cabinets, counters, appliances - high efficiency lighting. remodel (2) baths - new tile, vanity, tub, shower. no alteration onf walls, windows and doors. n/a maher ordinance # 155-13Details
remodel kitchen - new cabinets, counters, appliances - high efficiency lighting. remodel (2) baths - new tile, vanity, tub, shower. no alteration onf walls, windows and doors. n/a maher ordinance # 155-13 | $42,000 |
| Jun 26, 2014 | Completed final sign-off Dec 2014 | 33 Dellbrook Av | remodel first floor bedroom and new bath. relocate laundry.Details
remodel first floor bedroom and new bath. relocate laundry. | $65,000 |
| Feb 25, 2014 | Completed final sign-off Sep 2014 | 504 Hugo St | project proposes an interior remodel which includes a relocated kitchen, new bathroom, and new bedroom.Details
project proposes an interior remodel which includes a relocated kitchen, new bathroom, and new bedroom. | $35,000 |
| Feb 3, 2014 | Completed final sign-off Dec 2014 | 726 Masonic Av | remodel existing kitchen & bathroom and add a new bathroom to master bedroom.Details
remodel existing kitchen & bathroom and add a new bathroom to master bedroom. | $80,000 |
| Jan 27, 2014 | Completed final sign-off Apr 2014 | 83 Crags Ct | remodel 2 baths new vanities, fixtuers, toilets, tile lights on occupancy sensor new hardwood flooringDetails
remodel 2 baths new vanities, fixtuers, toilets, tile lights on occupancy sensor new hardwood flooring | $35,000 |
| Nov 13, 2013 | Completed final sign-off Nov 2014 | 4732 Fulton St | remodel extg kitchen and remove wall between kitchen and dining room. remodel extg bath and add master bath.Details
remodel extg kitchen and remove wall between kitchen and dining room. remodel extg bath and add master bath. | $85,000 |
| Oct 10, 2013 | Completed final sign-off Jul 2015 | 999 Green St | interior remodel of unit #3005, including kitchen and bathroom remodel. new front door to unit, new exterior sliding doors and glazing. capture exterior balcony space.Details
interior remodel of unit #3005, including kitchen and bathroom remodel. new front door to unit, new exterior sliding doors and glazing. capture exterior balcony space. | $90,000 |
| Oct 8, 2013 | Completed final sign-off Dec 2013 | 1416 18th Av | remodel kitchen in place- new cabinets, counters appliances, new high effeciency lighting, no walls moved new windows to lightwell remodel bath, new tile vanity, toilet lights on occupancy sensor.Details
remodel kitchen in place- new cabinets, counters appliances, new high effeciency lighting, no walls moved new windows to lightwell remodel bath, new tile vanity, toilet lights on occupancy sensor. | $32,000 |
| Sep 13, 2013 | Completed final sign-off Oct 2013 | 151 Galewood Cr | bath remodel, no walls moved, new shower, tub, vanity, no change to lighting. kitchen, replace cabinets, counters, no change to lighting.Details
bath remodel, no walls moved, new shower, tub, vanity, no change to lighting. kitchen, replace cabinets, counters, no change to lighting. | $17,000 |
| Aug 14, 2013 | Completed final sign-off Oct 2013 | 1414 18th Av | remodel bath in place - new tile, vanity, shower lighting on occupancy sensor.Details
remodel bath in place - new tile, vanity, shower lighting on occupancy sensor. | $10,000 |
| Jul 15, 2013 | Completed final sign-off Jan 2014 | 119 Buena Vista Tr | remodel (2) bathrooms - new fixtures, vanity, tile, lighting with occ. sensors, new kitchen cabinets - keep (e) appliances. new hardwood floors and carpet.Details
remodel (2) bathrooms - new fixtures, vanity, tile, lighting with occ. sensors, new kitchen cabinets - keep (e) appliances. new hardwood floors and carpet. | $55,000 |
| May 31, 2013 | Completed final sign-off Dec 2013 | 521 Lake St | add 1/2 bath by removing secondary stair to 1st level. remodel kitchen. new cabinets, counters, appliances. new high efficacy lighting in kitchenDetails
add 1/2 bath by removing secondary stair to 1st level. remodel kitchen. new cabinets, counters, appliances. new high efficacy lighting in kitchen | $22,000 |
| May 14, 2013 | Completed final sign-off Aug 2013 | 4150 17th St | remodel 2 bathrooms in place, no walls moved, no new openings, new tile, vanity, toilet. all lighting on occupancy sensor.Details
remodel 2 bathrooms in place, no walls moved, no new openings, new tile, vanity, toilet. all lighting on occupancy sensor. | $25,000 |
| May 7, 2013 | Completed final sign-off Feb 2014 | 50 Taraval St | remodel bath in place, no new openings, no walls moved, new tub, shower, vanity, tileDetails
remodel bath in place, no new openings, no walls moved, new tub, shower, vanity, tile | $15,000 |
| Jun 25, 2012 | Completed final sign-off Jan 2013 | 2219 24th St | remodel space at (e) ground level utility space including new bathroom & laundry/work room. remodel ktichen including new cabinets & appliances. new interior stairs to repalce spiral stair. infill floor at level 3 within (e) bldg envelope. new furnace at ground floor level.Details
remodel space at (e) ground level utility space including new bathroom & laundry/work room. remodel ktichen including new cabinets & appliances. new interior stairs to repalce spiral stair. infill floor at level 3 within (e) bldg envelope. new furnace at ground floor level. | $85,000 |
| Jun 25, 2012 | Completed final sign-off Aug 2012 | 470 Fillmore St | remodel 2 baths in place. new fixtures, tile. no walls moved. occupancy sensor for extg lighting.Details
remodel 2 baths in place. new fixtures, tile. no walls moved. occupancy sensor for extg lighting. | $18,000 |
| Jun 25, 2012 | Completed final sign-off Nov 2012 | 109 Caselli Av | remodel kitchen in place. new tile, appliances, cabinets, counters. no walls moved, high efficacy lighting. remodel bath in place. new tile, fixtures, plmg, new lighting on occupancy sensor.Details
remodel kitchen in place. new tile, appliances, cabinets, counters. no walls moved, high efficacy lighting. remodel bath in place. new tile, fixtures, plmg, new lighting on occupancy sensor. | $30,000 |
| Apr 23, 2012 | Completed final sign-off Aug 2012 | 62 Nordhoff St | remodel bath in place, no wall moved, new tub, vanity, toilet & tile.Details
remodel bath in place, no wall moved, new tub, vanity, toilet & tile. | $10,000 |
| Mar 26, 2012 | Completed final sign-off Oct 2012 | 60 Monticello St | remodel one bath in place - replace tub, shower, vanity. new lights on occupancy sensor. no walls moved.Details
remodel one bath in place - replace tub, shower, vanity. new lights on occupancy sensor. no walls moved. | $10,000 |
| Mar 19, 2012 | Completed final sign-off Mar 2013 | 1207 Cole St | remodel bath in place, new vanity, toilet, tile, new lighting on occupancy sensor. no change on walls and openings.Details
remodel bath in place, new vanity, toilet, tile, new lighting on occupancy sensor. no change on walls and openings. | $12,000 |
| Feb 17, 2012 | Completed final sign-off May 2014 | 823 Vermont St | horizontal addition at 2nd floor rear, and new bath and living space at 1st floor. garage addition (120 s.f)Details
horizontal addition at 2nd floor rear, and new bath and living space at 1st floor. garage addition (120 s.f) | $75,000 |
| Jan 18, 2012 | Completed final sign-off Oct 2012 | 9 Ord St | remodel bath in place _ new shower, vanity, lighting , sensor, remvoe 1 reframe bearing wall bet dining & kitchen. relocate/remodel kitchen - new cabinety, appliances,new high efficacy lighting.Details
remodel bath in place _ new shower, vanity, lighting , sensor, remvoe 1 reframe bearing wall bet dining & kitchen. relocate/remodel kitchen - new cabinety, appliances,new high efficacy lighting. | $65,000 |
| Dec 13, 2011 | Completed final sign-off Jan 2012 | 1800 Bryant St | remodel bath in place - new shower, vanity, tile, no new lightingDetails
remodel bath in place - new shower, vanity, tile, no new lighting | $9,000 |
| Dec 13, 2011 | Completed final sign-off Feb 2012 | 1020 Church St | remodel kitchen in place. new cabinets, counters, appliances, lighting, high eff. remodel bath in place. new tub,tile, vanity. lighting on occupancy sensor. to comply with cec 150kDetails
remodel kitchen in place. new cabinets, counters, appliances, lighting, high eff. remodel bath in place. new tub,tile, vanity. lighting on occupancy sensor. to comply with cec 150k | $19,000 |
| Nov 3, 2011 | Completed final sign-off Dec 2011 | 301 Mission St | retile powder bath floor, replace vanity, sink fixture, replace bath lighting with high efficacy or occupancy sensor. add built in bookcase in study. (n) lighting comply with cec 150(k). no structural work.Details
retile powder bath floor, replace vanity, sink fixture, replace bath lighting with high efficacy or occupancy sensor. add built in bookcase in study. (n) lighting comply with cec 150(k). no structural work. | $8,000 |
| Oct 19, 2011 | Completed final sign-off Jan 2014 | 21 Beaver St | 3rd floor horizontal addition. ground floor build-out & interior remodel: partial excauvation to un-occupied ground floor, new slab, remodel as habitable space. new addition on 3rd floor. remodel entire dwelling including 2 new bathrooms, remodel kitchen, remodel all (e) living rooms &Details
3rd floor horizontal addition. ground floor build-out & interior remodel: partial excauvation to un-occupied ground floor, new slab, remodel as habitable space. new addition on 3rd floor. remodel entire dwelling including 2 new bathrooms, remodel kitchen, remodel all (e) living rooms & | $280,829 |
| Aug 4, 2011 | Completed final sign-off Dec 2011 | 2255 Pine St | remodel of (1) full bath & (1) half bath - new tub, vanities, toilets, tile. no change to walls, window or exterior doors. occupancy sensor for new lighting to comply with cec 150(k).Details
remodel of (1) full bath & (1) half bath - new tub, vanities, toilets, tile. no change to walls, window or exterior doors. occupancy sensor for new lighting to comply with cec 150(k). | $18,000 |
| Jul 15, 2011 | Completed final sign-off Feb 2013 | 823 Vermont St | new master bath, (n) skylight, reframe living room walls, roofing over (e) skylite opening.Details
new master bath, (n) skylight, reframe living room walls, roofing over (e) skylite opening. | $16,000 |
| Jun 13, 2011 | Completed final sign-off Feb 2013 | 823 Vermont St | remodel bath in place - new shower, toilet, vanity, occupancy sensor in bath for new lighting. remodel kitchen in place - new appliances, cabinets, coutners, new lighting at least 50% high efficacy.Details
remodel bath in place - new shower, toilet, vanity, occupancy sensor in bath for new lighting. remodel kitchen in place - new appliances, cabinets, coutners, new lighting at least 50% high efficacy. | $60,000 |
| May 12, 2011 | Completed final sign-off Dec 2011 | 2168 Bush St | kitchen remodel in place - new cabinets, counters, appliances; bath remodel in place - new tub, tile, fixtures. new high efficacy lighting in kitchen occupancy sensor in bath. selective window repalcement (rear). remove nonbearing partition.Details
kitchen remodel in place - new cabinets, counters, appliances; bath remodel in place - new tub, tile, fixtures. new high efficacy lighting in kitchen occupancy sensor in bath. selective window repalcement (rear). remove nonbearing partition. | $90,000 |
| Apr 21, 2011 | Completed final sign-off Feb 2012 | 387 Tehama St | revision to pa# 2010.06.16.4610. reconfigurattion of interior walls at 3rd fl bathroom and bedroom spaces. no additional sq.footage to permitted space. scope of revision to residential unit only. no exterior work.Details
revision to pa# 2010.06.16.4610. reconfigurattion of interior walls at 3rd fl bathroom and bedroom spaces. no additional sq.footage to permitted space. scope of revision to residential unit only. no exterior work. | |
| Feb 23, 2011 | Completed final sign-off Apr 2011 | 203 Central Av | remodel one bath in place, no walls moved, repl tub surround, vanity, toilet, flooring, no change to wall window doors, low efficacy lighting or occupancy sensor per cec 150(k)Details
remodel one bath in place, no walls moved, repl tub surround, vanity, toilet, flooring, no change to wall window doors, low efficacy lighting or occupancy sensor per cec 150(k) | $15,000 |
| Oct 12, 2010 | Completed final sign-off Jan 2011 | 1851 15th St | bath remodel in place, no walls moved, replace tub, vanity, tile no change in lighting.Details
bath remodel in place, no walls moved, replace tub, vanity, tile no change in lighting. | $12,000 |
| Jul 19, 2010 | Completed final sign-off Dec 2011 | 143 Duncan St | create new hallway by framing new wall at 2nd floor. relocate doors to bedrooms. add lavatory and vanity, relocate door to an existing bath. add closet doors. 3rd floor: enclsoe existing space for office useDetails
create new hallway by framing new wall at 2nd floor. relocate doors to bedrooms. add lavatory and vanity, relocate door to an existing bath. add closet doors. 3rd floor: enclsoe existing space for office use | $21,000 |
| Jun 17, 2010 | Completed final sign-off Jul 2010 | 300 Valley St | add 1/2 bath, sink and toilet. partition walls only. no walls moved or removed. provide exhaust. no rated floor penetration, terminate 3'min from pl and bldg opening. occupancy sensor for lighting.Details
add 1/2 bath, sink and toilet. partition walls only. no walls moved or removed. provide exhaust. no rated floor penetration, terminate 3'min from pl and bldg opening. occupancy sensor for lighting. | $15,000 |
| Apr 9, 2010 | Completed final sign-off Jul 2010 | 931 14th St | remodel bathroom in place, replace (e) fixtures, non structural no walls moved.one bathroom at unit 931. new lighting provide high efficancy lights or manuel on occupancy sensor.Details
remodel bathroom in place, replace (e) fixtures, non structural no walls moved.one bathroom at unit 931. new lighting provide high efficancy lights or manuel on occupancy sensor. | $12,000 |
| Dec 24, 2009 | Completed final sign-off Sep 2010 | 121 Caselli Av | bathroom remodel, new tub, toilet & vanity. no walls moved. lighting. provide high efficancy lighting or "manual on" occupancy sensor.Details
bathroom remodel, new tub, toilet & vanity. no walls moved. lighting. provide high efficancy lighting or "manual on" occupancy sensor. | $20,000 |
| Sep 21, 2009 | Completed final sign-off May 2010 | 171 Caselli Av | remodel of lower floor & conversion to habitable space including; new master bedroom suite, bedroom, bathroom & closet, new family room, new laundry room.Details
remodel of lower floor & conversion to habitable space including; new master bedroom suite, bedroom, bathroom & closet, new family room, new laundry room. | $30,000 |
| Mar 31, 2009 | Completed final sign-off Jul 2009 | 634 Castro St | convert office space into bathroom in 638 castro street to comply with 3r-5340. add smoke detectors per code in 634 castro street, remove non-compliant interior stairs in 638 castro street.Details
convert office space into bathroom in 638 castro street to comply with 3r-5340. add smoke detectors per code in 634 castro street, remove non-compliant interior stairs in 638 castro street. | $15,000 |
| Mar 24, 2009 | Completed final sign-off Sep 2009 | 1724 Alabama St | remodel bath room on main floor include non structural wall removal. add sky light (flat).Details
remodel bath room on main floor include non structural wall removal. add sky light (flat). | $20,000 |
| Aug 11, 2008 | Completed final sign-off Nov 2008 | 725 Hampshire St | remodel kitchen in place - replace cabients, counters, appliances, tile. remodel bath in place - new shower pan, new toilet, tile. replace windows at rear in kind.Details
remodel kitchen in place - replace cabients, counters, appliances, tile. remodel bath in place - new shower pan, new toilet, tile. replace windows at rear in kind. | $40,000 |
| Aug 1, 2008 | Completed final sign-off Jan 2011 | 64 Nordhoff St | horizontal rear addition @ 2nd floor (2 bedrooms, 2 full bathrooms, laundry room & storage).Details
horizontal rear addition @ 2nd floor (2 bedrooms, 2 full bathrooms, laundry room & storage). | $110,000 |
| May 12, 2008 | Completed final sign-off Dec 2008 | 110 Hoffman Av | convert (e) storage room into new family room, bedroom & new bath.Details
convert (e) storage room into new family room, bedroom & new bath. | $40,000 |
| Apr 18, 2008 | Completed final sign-off Dec 2008 | 110 Hoffman Av | 3rd fl: new bath and bath remodel, reconfigure master bedroom and closets, new laundry, new beam at hallway. 2nd floor: new beam between kitchen and dining, kitchen remodel. 1st floor: new beams and posts, new footingDetails
3rd fl: new bath and bath remodel, reconfigure master bedroom and closets, new laundry, new beam at hallway. 2nd floor: new beam between kitchen and dining, kitchen remodel. 1st floor: new beams and posts, new footing | $70,000 |
| Apr 16, 2008 | Completed final sign-off Oct 2008 | 2111 Vallejo St | demo 3rd floor wall at lightwell, install 2nd floor powder room exhaust fan, construct 3rd floor joists and roof system, demo 3rd fl interior walls to remodel 2 baths, 1 bedroom. add 1 window 3rd floor rear, move deck accesss door from bedroom to master bedroom. mep sep permitDetails
demo 3rd floor wall at lightwell, install 2nd floor powder room exhaust fan, construct 3rd floor joists and roof system, demo 3rd fl interior walls to remodel 2 baths, 1 bedroom. add 1 window 3rd floor rear, move deck accesss door from bedroom to master bedroom. mep sep permit | $60,000 |
| Sep 5, 2007 | Completed final sign-off Jun 2008 | 290 San Jose Av | remodel kitchen in place; replace cabinets, flooring, and appliances. lighting to remain. remodel bath in place; replace shower, fixtures, tile. lighting to remain.Details
remodel kitchen in place; replace cabinets, flooring, and appliances. lighting to remain. remodel bath in place; replace shower, fixtures, tile. lighting to remain. | $55,000 |