# West Coast Masonry Inc

Contractor license 1032563. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/west-coast-masonry-inc-1032563
- JSON: https://www.permitgraph.org/api/contractor?license=1032563
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=1032563

21 permits since 2000: 18 completed, 2 in progress, 1 never finaled. Typically 0 days from filing to permit and 129 days from permit to final inspection. Of the 1 never-finaled permit, 1 is 3 to 5 years old.

- Based in: San Francisco
- On San Francisco permits: Jul 2018 to May 2026
- Last 24 months: 6 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2018 | 2 | 0 | 0 | 0 |
| 2019 | 1 | 0 | 0 | 0 |
| 2020 | 2 | 0 | 0 | 0 |
| 2021 | 2 | 0 | 0 | 0 |
| 2022 | 0 | 0 | 1 | 0 |
| 2023 | 3 | 0 | 0 | 0 |
| 2024 | 4 | 2 | 0 | 0 |
| 2025 | 3 | 0 | 0 | 0 |
| 2026 | 1 | 0 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Stairs | 8 | 8 | 0 | 0 | 0 | 2 | 138 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202605131182](https://www.permitgraph.org/p/202605131182) | May 13, 2026 | Completed: final sign-off Jul 2026 | [3225 Laguna St](https://www.permitgraph.org/a/0494/003) | remove (e) brick around garage door's and replace w/ new brick and anchor to structure. | $15,000 |
| [202512020728](https://www.permitgraph.org/p/202512020728) | Dec 2, 2025 | Completed: final sign-off Mar 2026 | [1983 09th Av](https://www.permitgraph.org/a/2125/004B) | replace in kind brick stairs with new framing and waterproof and patch stucco at front | $29,500 |
| [202510167504](https://www.permitgraph.org/p/202510167504) | Oct 16, 2025 | Completed: final sign-off Mar 2026 | [3145 Octavia St](https://www.permitgraph.org/a/0495/001A) | to comply with nov 2025-38786 at front facade (east facing exterior wall) repair wall damage, partial in kind replacement of existing bricks and stucco | $5,000 |
| [202507251580](https://www.permitgraph.org/p/202507251580) | Jul 25, 2025 | Completed: final sign-off Jan 2026 | [1874 17th Av](https://www.permitgraph.org/a/2053/027) | replacement of existing wood framed brick entry stair, guardrail and dryrot. damanged framing, stairs to be replaced with brick. | $35,000 |
| [202412036044](https://www.permitgraph.org/p/202412036044) | Dec 3, 2024 | In progress: issued Dec 2024 | [644 Jackson St](https://www.permitgraph.org/a/0177/007) | brick repointing in back of the property | $30,000 |
| [202412036062](https://www.permitgraph.org/p/202412036062) | Dec 3, 2024 | Completed: final sign-off Mar 2025 | [895 24th Av](https://www.permitgraph.org/a/1667/021) | repair any dryrot as needed install new paper for waterproofing. install new brick to match existing, install brick tie every 12 inches on center for anchoring. | $15,200 |
| [202409160862](https://www.permitgraph.org/p/202409160862) | Sep 16, 2024 | Completed: final sign-off Dec 2024 | [658 36th Av](https://www.permitgraph.org/a/1578/017A) | replace front stairs framing, waterproof, stone steps; revisions to pa#: 202407176659 | $22,000 |
| [202407176658](https://www.permitgraph.org/p/202407176658) | Jul 17, 2024 | In progress: issued Jul 2024 | [3620 18th St](https://www.permitgraph.org/a/3578/079) | remove brick above garage doors and repair brick at main entrance, any repair will be installed with brick tie every 16" on the center. | $13,000 |
| [202407176659](https://www.permitgraph.org/p/202407176659) | Jul 17, 2024 | Completed: final sign-off Dec 2024 | [658 36th Av](https://www.permitgraph.org/a/1578/017A) | repair brick stairs (less than 50%) and install new bluestone step and risers. reapir any dry rot as needed and new waterproofing. | $2,000 |
| [202406255163](https://www.permitgraph.org/p/202406255163) | Jun 25, 2024 | Completed: final sign-off Jul 2024 | [1404 Irving St](https://www.permitgraph.org/a/1735/018) | to comply with nov #202421528 repair lose brick, reuse same brick and install (n) brick tie to anchor to building. location of the repair is at southside of the building, 2nd story. approx. 100 sq ft. | $18,000 |
| [202308184771](https://www.permitgraph.org/p/202308184771) | Aug 18, 2023 | Completed: final sign-off Mar 2024 | [120 Kenwood Wy](https://www.permitgraph.org/a/3276/003) | stucco replacement in front facade and approx 30 ft on side. replacement stucco to match existing stucco in-kind including texture. | $15,000 |
| [202308073887](https://www.permitgraph.org/p/202308073887) | Aug 7, 2023 | Completed: final sign-off Mar 2024 | [120 Kenwood Wy](https://www.permitgraph.org/a/3276/003) | rot repair replace in kind stucco repair brick steps around 100 sq ft of patching. | $20,000 |
| [202308073885](https://www.permitgraph.org/p/202308073885) | Aug 7, 2023 | Completed: final sign-off Mar 2024 | [2300 32nd Av](https://www.permitgraph.org/a/2360/001L) | repair roof tiles and repair brick steps to entrance. in kind replacement - terra cotta tile roofing and brick stair. | $7,000 |
| [202208160592](https://www.permitgraph.org/p/202208160592) | Aug 16, 2022 | Never finaled: issued Aug 2022, no final | [236 Avila St](https://www.permitgraph.org/a/0441B/020) | repair martar joint in brick : fix crack in joints repair brick work | $5,000 |
| [202109218801](https://www.permitgraph.org/p/202109218801) | Sep 21, 2021 | Completed: final sign-off Feb 2022 | [44 20th Av](https://www.permitgraph.org/a/1339/013) | brick stairs repair crack in stucco repair. exploration under stairs. not sure of damage under stairs no access. less than 50% | $13,000 |
| [202106182745](https://www.permitgraph.org/p/202106182745) | Jun 18, 2021 | Completed: final sign-off Feb 2022 | [330 Niagara Av](https://www.permitgraph.org/a/6972/009) | dry rot repair.replace in-kind under one window waterproof steps, pater stucco, not mor than 9sf area. visitble form street. finish to match (e). | $7,000 |
| [202012070344](https://www.permitgraph.org/p/202012070344) | Dec 7, 2020 | Completed: final sign-off Jan 2021 | [885 Bryant St](https://www.permitgraph.org/a/3779/039) | repointing brick and paint outside of building. visible from street. | $9,000 |
| [202007270800](https://www.permitgraph.org/p/202007270800) | Jul 27, 2020 | Completed: final sign-off Oct 2020 | [1360 Montgomery St](https://www.permitgraph.org/a/0106/046) | replace broken glass bricks in window with 95 minute fire rated glass bricks. location is common area. | $3,294 |
| [201911278341](https://www.permitgraph.org/p/201911278341) | Nov 27, 2019 | Completed: final sign-off Mar 2021 | [1307 Bay St](https://www.permitgraph.org/a/0472/042) | in kind replacement of front stairway | $30,000 |
| [201811216593](https://www.permitgraph.org/p/201811216593) | Nov 21, 2018 | Completed: final sign-off Apr 2019 | [1470 Newcomb Av](https://www.permitgraph.org/a/5308/010B) | replace in kind front steps. 5 steps to be repaired and wall cap on both sides, less than 50% | $5,000 |
| [201807305958](https://www.permitgraph.org/p/201807305958) | Jul 30, 2018 | Completed: final sign-off Sep 2018 | [2 Rockwood Ct](https://www.permitgraph.org/a/2936A/020) | replace in kind front stair steps (red brick), replace 7 step and brick landing, less than 50% | $5,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/west-coast-masonry-inc-1032563.