# Wells Construction Inc

Contractor license 619655. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/wells-construction-inc-619655
- JSON: https://www.permitgraph.org/api/contractor?license=619655
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=619655

65 permits since 2000: 52 completed, 2 in progress, 8 never finaled, 3 expired or cancelled. Typically 35 days from filing to permit and 86 days from permit to final inspection. Of the 8 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old, 5 are over 10 years old.

- Based in: Roseville
- On San Francisco permits: Apr 2004 to Jul 2026
- Last 24 months: 2 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2004 | 1 | 0 | 0 | 2 |
| 2008 | 2 | 0 | 1 | 0 |
| 2009 | 2 | 0 | 0 | 0 |
| 2010 | 5 | 0 | 0 | 0 |
| 2011 | 1 | 0 | 0 | 0 |
| 2012 | 7 | 0 | 0 | 0 |
| 2013 | 8 | 0 | 2 | 1 |
| 2014 | 5 | 0 | 0 | 0 |
| 2015 | 1 | 0 | 1 | 0 |
| 2016 | 4 | 0 | 1 | 0 |
| 2018 | 1 | 0 | 0 | 0 |
| 2020 | 1 | 0 | 0 | 0 |
| 2021 | 6 | 0 | 1 | 0 |
| 2022 | 4 | 0 | 2 | 0 |
| 2023 | 3 | 0 | 0 | 0 |
| 2024 | 1 | 0 | 0 | 0 |
| 2025 | 0 | 1 | 0 | 0 |
| 2026 | 0 | 1 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Kitchen remodel | 2 | 1 | 0 | 1 | 0 | 10 | 365 |
| Bathroom remodel | 1 | 1 | 0 | 0 | 0 | 8 | 365 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202607145037](https://www.permitgraph.org/p/202607145037) | Jul 14, 2026 | In progress: filed Jul 2026, not yet issued | [1001 Ocean Av](https://www.permitgraph.org/a/6945/045) | underground utility upgrade, electrical and gas. informed we needed to apply for another building permit for this revision. currently building permit #202406215053 | $1,500,000 |
| [202406215053](https://www.permitgraph.org/p/202406215053) | Aug 28, 2025 | In progress: issued May 2026 | [1001 Ocean Av](https://www.permitgraph.org/a/6945/045) | horizontal addition to accomodate new elevator. modifications to 2nd story to expand veterinary services. modifications to 1st floor to accomodate elevator. new accessible restrooms. new interior wal… | $650,000 |
| [202402125711](https://www.permitgraph.org/p/202402125711) | Feb 12, 2024 | Completed: final sign-off Feb 2025 | [216 11th St](https://www.permitgraph.org/a/3516/003) | ref pa# 202208180819, electrical work only reuse 400a 208v y 3ph service & switchgear; replace (e) panel a, relocate (e) panel c, install (n) panel; installation of (n) lighting systems & associated… | $100,000 |
| [202306140100](https://www.permitgraph.org/p/202306140100) | Jun 14, 2023 | Completed: final sign-off Aug 2023 | [1428 Irving St](https://www.permitgraph.org/a/1735/021) | install split unit. install new duct and grills. | $5,000 |
| [202302162109](https://www.permitgraph.org/p/202302162109) | Feb 16, 2023 | Completed: final sign-off Apr 2023 | [201 Powell St](https://www.permitgraph.org/a/0315/003) | revision to permit number 202204263011. changing swing on exterior store front back to out. |  |
| [202301120108](https://www.permitgraph.org/p/202301120108) | Jan 12, 2023 | Completed: final sign-off Jul 2023 | [44 Cleveland St](https://www.permitgraph.org/a/3754/030) | title 24 "mechanical" addendum to approved permit 202207067803. |  |
| [202209303565](https://www.permitgraph.org/p/202209303565) | Sep 30, 2022 | Completed: final sign-off Feb 2025 | [216 11th St](https://www.permitgraph.org/a/3516/003) | mep work only ref pa 2022-0818-0819 |  |
| [202208180819](https://www.permitgraph.org/p/202208180819) | Aug 18, 2022 | Never finaled: issued Sep 2022, no final | [216 11th St](https://www.permitgraph.org/a/3516/003) | prop h- remodel (e) tenant space(manufacturing) to a veterinaty clinic. minor eterior work to remove garage door w/ folding glass door. interior: remove non-bearing wall partitions & replace w/ metal… | $760,000 |
| [202208029708](https://www.permitgraph.org/p/202208029708) | Aug 2, 2022 | Completed: final sign-off Feb 2023 | [300 Brannan St](https://www.permitgraph.org/a/3775/008) | tenant improvement for new vetrinary clinic. new electrical, plumbing, walls, finsihes, ducting | $250,000 |
| [202207067803](https://www.permitgraph.org/p/202207067803) | Jul 6, 2022 | Completed: final sign-off Jul 2023 | [44 Cleveland St](https://www.permitgraph.org/a/3754/030) | 1)kitchen and bathroom renovation. 2) new air intake, exhaust ventilation and hvac system. 3)lighting update. | $50,000 |
| [202204263011](https://www.permitgraph.org/p/202204263011) | Apr 26, 2022 | Completed: final sign-off Apr 2023 | [201 Powell St](https://www.permitgraph.org/a/0315/006) | t.i. for a take out only coffee shop in (e) shell. new non-structural partitions, storefront, equipment, fixtures, finishes, and mep upgrades. | $192,800 |
| [202201125861](https://www.permitgraph.org/p/202201125861) | Jan 12, 2022 | Never finaled: issued Jan 2022, no final | [1428 Irving St](https://www.permitgraph.org/a/1735/021) | adding a new backflow and system to one head. | $2,000 |
| [202112245020](https://www.permitgraph.org/p/202112245020) | Dec 24, 2021 | Completed: final sign-off Jul 2022 | [462 Powell St](https://www.permitgraph.org/a/0295/008) | interior remodel of an extg starbucks coffee shop. all seating will be removed and store will be transformed into a take out only coffee shop. no consumption on site. scope od work is comprised o new… | $100,000 |
| [202109148428](https://www.permitgraph.org/p/202109148428) | Sep 14, 2021 | Never finaled: issued Sep 2021, no final | [1428 Irving St](https://www.permitgraph.org/a/1735/021) | revision to pa 202101112449. revised wood frame slab to concrete slab to match (e) condition. updated ramp detail and structural details to match for a new proposed slab. |  |
| [202106162579](https://www.permitgraph.org/p/202106162579) | Jun 16, 2021 | Completed: final sign-off Oct 2021 | [7 Drumm St](https://www.permitgraph.org/a/0235/008) | revision to app#202012221572 store front and interior changes. (minimum) | $2,000 |
| [202105049789](https://www.permitgraph.org/p/202105049789) | May 4, 2021 | Completed: final sign-off Jun 2022 | [3595 California St](https://www.permitgraph.org/a/1035/003) | g/f: interior t.i. into (e) starbucks. new non-structural partitions, update restrooms, new equipment, new cabinets and new finishes, upate (e) lighting and electrical. no exterior work. no increase… | $117,500 |
| [202102023848](https://www.permitgraph.org/p/202102023848) | Feb 2, 2021 | Completed: final sign-off Aug 2021 | [1830 Polk St](https://www.permitgraph.org/a/0597/029) | remodel of an (e) gym facility & its conversion to an animal hospital. m.e.p. included. prop h. | $300,000 |
| [202101273460](https://www.permitgraph.org/p/202101273460) | Jan 27, 2021 | Completed: final sign-off Sep 2022 | [1434 Irving St](https://www.permitgraph.org/a/1735/023) | ground floor tenant improvement. includes new partitions, new ceilings, lighting & finishes. | $238,407 |
| [202101112449](https://www.permitgraph.org/p/202101112449) | Jan 11, 2021 | Completed: final sign-off Mar 2022 | [1428 Irving St](https://www.permitgraph.org/a/1735/021) | animal hospital ti at ground floor only. work includes (n) partitions, ceilings, lighting, restrooms, finishes & associated mep. | $238,407 |
| [202012221572](https://www.permitgraph.org/p/202012221572) | Dec 22, 2020 | Completed: final sign-off Mar 2022 | [7 Drumm St](https://www.permitgraph.org/a/0235/008) | tenant improvement for a take out only coffee shop in (e) shell. new non-structural partitions, storefront, equipment, fixtures, finishes, and mep upgrades. | $96,500 |
| [201809129890](https://www.permitgraph.org/p/201809129890) | Sep 12, 2018 | Completed: final sign-off Dec 2018 | [100 Church St](https://www.permitgraph.org/a/3537/001) | tenant improvement suite suite b demolish non load bearing walls, relocate doors, lighing, power data as needed. demo e flooring material to expose e concrete floors for animal hospital tenant | $75,000 |
| [201604275778](https://www.permitgraph.org/p/201604275778) | Apr 27, 2016 | Never finaled: issued Apr 2016, no final | [343 Sansome St](https://www.permitgraph.org/a/0239/030) | revision to 2016 0120 7414: addition of 1 heat pump mechanical unit maher na | $21,000 |
| [201604013733](https://www.permitgraph.org/p/201604013733) | Apr 1, 2016 | Completed: final sign-off Jun 2016 | [215 King St](https://www.permitgraph.org/a/8706/003) | #100- revision to pa#201601207404, addition of (1) new heat pump (ffp-4) unit with associated electrical & plumbing requirements. relocation of heat pump units. n/a ordinance #155-13 | $28,000 |
| [201603041199](https://www.permitgraph.org/p/201603041199) | Mar 4, 2016 | Completed: final sign-off Jun 2016 | [215 King St](https://www.permitgraph.org/a/8706/003) | #100- saw cut & removal of concrete/pandeck sub floor, install new supporting walls, pandeck & concrete replacement to allow for new plumbing waste @ restroom shower. revision to pa#201601207404. n/a… | $3,500 |
| [201601207414](https://www.permitgraph.org/p/201601207414) | Jan 20, 2016 | Completed: final sign-off May 2016 | [343 Sansome St](https://www.permitgraph.org/a/0239/030) | ste 125, change of use from office to fitness training. ti of existing space on 1st floor to include new partitions, lighting, re-assignment of existing electrical, counter, upgrade front entry and a… | $450,000 |
| [201601207404](https://www.permitgraph.org/p/201601207404) | Jan 20, 2016 | Completed: final sign-off Jun 2016 | [215 King St](https://www.permitgraph.org/a/8706/003) | ste. #100: change of use from office to fitness training. work to inlcude re-use of existing mechanical, plumbing, electrical system, redesigned to new layout. buildout of walls, ceiling, refinishing… | $350,000 |
| [201502198732](https://www.permitgraph.org/p/201502198732) | Feb 19, 2015 | Completed: final sign-off May 2015 | [744 Irving St](https://www.permitgraph.org/a/1742/017) | construct (n) walls, (n) flooring, modify (e) signage. | $50,000 |
| [201502047483](https://www.permitgraph.org/p/201502047483) | Feb 4, 2015 | Never finaled: issued Mar 2015, no final | [99 Jackson St](https://www.permitgraph.org/a/0171/069) | interior remodel: demolition, installation of new walls, ada upgrade of restrooms. relocation of extg lights, refinish floor covering, door replacements, furniture installation. n/a for the maher. | $99,000 |
| [201410239733](https://www.permitgraph.org/p/201410239733) | Oct 23, 2014 | Completed: final sign-off Mar 2015 | [490 Post St](https://www.permitgraph.org/a/0296/111) | interior t.i. new t bar ceiling, lighting, casework and partition related plumbing and electrical, demo 2 walls. | $57,000 |
| [201404284355](https://www.permitgraph.org/p/201404284355) | Apr 28, 2014 | Completed: final sign-off Jul 2014 | [74 New Montgomery St](https://www.permitgraph.org/a/3707/064) | t.i. to existing starbuck. demo existing bar area, new front and back bar layout with modified plumbing and electrical. new eating and furniture, with added wall of chill as indicated on plan. maher… | $329,000 |
| [201404143134](https://www.permitgraph.org/p/201404143134) | Apr 14, 2014 | Completed: final sign-off Jul 2014 | [27 Drumm St](https://www.permitgraph.org/a/0235/006) | remodel existing starbucks cafe including minor plumbing and electrical modificiations | $7,500 |
| [201403191148](https://www.permitgraph.org/p/201403191148) | Mar 19, 2014 | Completed: final sign-off Oct 2015 | [564 Market St](https://www.permitgraph.org/a/0291/005) | t.i. for new coffee cafe. work includes new partitions, fixtures, finishes, equipment mep. no exterior work. fire protection under seperate permit. | $573,000 |
| [201401317554](https://www.permitgraph.org/p/201401317554) | Jan 31, 2014 | Completed: final sign-off Jun 2014 | [120 04th St](https://www.permitgraph.org/a/3724/067) | remodel of (e) starbucks including minor plumbing, mechanical & electrical modifications. demolish & rebuild restroom, replace portion of storefront. compliance with maher ordinance no.155-13 not req… | $115,000 |
| [201312315371](https://www.permitgraph.org/p/201312315371) | Dec 31, 2013 | Expired or cancelled: cancelled Jul 2014 | [1800 Irving St](https://www.permitgraph.org/a/1731/019) | installation of tile, new stucco finishes and hot rolled steel at canopy edge; signage under separate permit. exterior scope only. compliance with ordinance #155-13 not required | $34,000 |
| [201312124023](https://www.permitgraph.org/p/201312124023) | Dec 12, 2013 | Completed: final sign-off Jun 2014 | [2727 Mariposa St](https://www.permitgraph.org/a/4017/002) | interior remodel of an extg starbucks cafe including minor plumbing and electrical. | $120,000 |
| [201311222613](https://www.permitgraph.org/p/201311222613) | Nov 22, 2013 | Never finaled: issued Feb 2014, no final | [1298 Howard St](https://www.permitgraph.org/a/3728/019) | remodel of (e) cafe at 1298 howard street. compliance with ordinance #155-13 not required | $50,000 |
| [201311041009](https://www.permitgraph.org/p/201311041009) | Nov 4, 2013 | Completed: final sign-off Jan 2014 | [565 Clay St](https://www.permitgraph.org/a/0228/030) | alteration of existing interior. replace finsihes, cabinetry, lighting, equipment. exterior paint. any replacement shall not exceed current allowed service provided | $350,000 |
| [201309267808](https://www.permitgraph.org/p/201309267808) | Sep 26, 2013 | Completed: final sign-off Dec 2013 | [36 02nd St](https://www.permitgraph.org/a/3707/004) | minor t.i to cafe front bar, back bar w/reconfiguration. relocate bar equipment, floor sinks, update furniture & casework. repaint (e) walls & ceilings for new finish. install new flooring, non load… | $100,000 |
| [201309177035](https://www.permitgraph.org/p/201309177035) | Sep 17, 2013 | Completed: final sign-off Feb 2014 | [1390 Market St](https://www.permitgraph.org/a/0813/007) | t.i. to the (e) starbucks ground floor. full renovation of the (e) business, this includes, as shown on plans, replacing, finishes, ceiling, walls, cabinetry, lighting, plumbing, mechanical, electric… | $350,000 |
| [201309096253](https://www.permitgraph.org/p/201309096253) | Sep 9, 2013 | Completed: final sign-off Nov 2013 | [1401 Van Ness Av](https://www.permitgraph.org/a/0666/005) | commercial t.i. to extg starbucks, major improvements to cafe front bar & backbar. install newcounter tops & reskin casework. update funiture and casework. repaint extg walls and ceiling for new fini… | $129,000 |
| [201304023602](https://www.permitgraph.org/p/201304023602) | Apr 2, 2013 | Completed: final sign-off Jul 2013 | [359 Grant Av](https://www.permitgraph.org/a/0286/001) | minor improvement to existing cafe, relocation of exisitng equipments, new finishes, light fixtures & plumbing fixtures, new hi-lo automatic door opener at front door. signage, fire alarn, sprinklers… | $150,000 |
| [201303283301](https://www.permitgraph.org/p/201303283301) | Mar 28, 2013 | Never finaled: issued Apr 2013, no final | [780 Market St](https://www.permitgraph.org/a/0328/001) | remodel extg star bucks. new interior. nonstructural partitions, floor and ceiling finishes. new light fixtures and restroom plmg & fixtures.new sinks for kitchen. | $200,000 |
| [201302079707](https://www.permitgraph.org/p/201302079707) | Feb 7, 2013 | Completed: final sign-off Mar 2014 | [440 Geary St](https://www.permitgraph.org/a/0306/007) | minor improvements to existing starbucks. new finishes, relocation of existing equipment, update new sink, light fixtures, mop sink, existing restroom to remain | $174,039 |
| [201301047247](https://www.permitgraph.org/p/201301047247) | Jan 4, 2013 | Completed: final sign-off Feb 2013 | [4094 18th St](https://www.permitgraph.org/a/3582/057) | revision to pa# 2012-1102-3405-relocaye power door operator, install new 6x36 bollard door actuator at store entry adjacent to level landing behind property line. |  |
| [201211023405](https://www.permitgraph.org/p/201211023405) | Nov 2, 2012 | Completed: final sign-off Feb 2013 | [4094 18th St](https://www.permitgraph.org/a/3582/057) | revision to app#201207034029. install new 6"x36" door activator at entry door. | $7,500 |
| [201208308684](https://www.permitgraph.org/p/201208308684) | Aug 30, 2012 | Completed: final sign-off Feb 2013 | [4094 18th St](https://www.permitgraph.org/a/3582/057) | revision to app#201207034029. alteration to mep layout and system. provide fire seperation for tenant spaces. new colums - structural under seperate permit. | $25,000 |
| [201208217887](https://www.permitgraph.org/p/201208217887) | Aug 21, 2012 | Completed: final sign-off Feb 2013 | [4094 18th St](https://www.permitgraph.org/a/3582/057) | revision to 201207034029. changes to structural system, detailing of connections at slab |  |
| [201208096992](https://www.permitgraph.org/p/201208096992) | Aug 9, 2012 | Completed: final sign-off Aug 2012 | [4094 18th St](https://www.permitgraph.org/a/3582/057) | interior non structural demo of e coffee shop. all work to comply with sfbc ab017. no exterior work. | $15,000 |
| [201207034029](https://www.permitgraph.org/p/201207034029) | Jul 3, 2012 | Completed: final sign-off Feb 2013 | [4094 18th St](https://www.permitgraph.org/a/3582/057) | ti to existing cafe of existing starbucks. update walls, floors, furniture, casework, bar equipment, new lighting, mechanical diffusers. new storefront location and finishes | $600,000 |
| [201205251262](https://www.permitgraph.org/p/201205251262) | May 25, 2012 | Completed: final sign-off Aug 2012 | [2801 Jones St](https://www.permitgraph.org/a/0011/008) | revision to pa# 2012-0106-1833-revisions to exterior canopy support | $4,000 |
| [201201061833](https://www.permitgraph.org/p/201201061833) | Jan 6, 2012 | Completed: final sign-off Aug 2012 | [2801 Jones St](https://www.permitgraph.org/a/0011/008) | ti to existing starbucks coffee. minor improvements to cafe and front bar. repair & update walls, ceiling finishes, furniture, casework. relocate bar equipment, floor sinks. install new lighting. new… | $200,000 |
| [201104144117](https://www.permitgraph.org/p/201104144117) | Apr 14, 2011 | Completed: final sign-off Aug 2011 | [3595 California St](https://www.permitgraph.org/a/1035/003) | commercial tenant improvement to (e) building interior space of coffee shop. | $90,000 |
| [201008209278](https://www.permitgraph.org/p/201008209278) | Aug 20, 2010 | Completed: final sign-off Feb 2011 | [343 Sansome St](https://www.permitgraph.org/a/0239/030) | replace base cabinet & counter top, new case work & finish work | $2,500 |
| [201006154573](https://www.permitgraph.org/p/201006154573) | Jun 15, 2010 | Completed: final sign-off Nov 2010 | [2222 Fillmore St](https://www.permitgraph.org/a/0629/021) | remove (e) casework @ backbar & install tile & undercounter refrigerator & microwave & associated electrical outlets for both. | $5,000 |
| [201006104265](https://www.permitgraph.org/p/201006104265) | Jun 10, 2010 | Completed: final sign-off Nov 2010 | [1401 Van Ness Av](https://www.permitgraph.org/a/0666/004) | remove (e) cuby's & install undercounter refrigerator & microwave & electrical outlets for both. | $1,500 |
| [201006104264](https://www.permitgraph.org/p/201006104264) | Jun 10, 2010 | Completed: final sign-off Nov 2010 | [388 Market St](https://www.permitgraph.org/a/0265/003) | starbuck. remove exsting warming oven and install counter top microwave and associated outlets. | $1,500 |
| [201003097778](https://www.permitgraph.org/p/201003097778) | Mar 9, 2010 | Completed: final sign-off Jun 2010 | [1800 Irving St](https://www.permitgraph.org/a/1731/019) | new rear gate fence with access gate & door setback from sidewalk 19th ave site. | $2,000 |
| [200906190846](https://www.permitgraph.org/p/200906190846) | Jun 19, 2009 | Completed: final sign-off Sep 2009 | [3995 24th St](https://www.permitgraph.org/a/6508/025) | partial renovation of an existing starbucks. work includes addition of warming oven, new countertops, new casework, new paint, wall tile, refinishing of e casework, minor elec modifications. (no mep) | $40,000 |
| [200903033243](https://www.permitgraph.org/p/200903033243) | Mar 3, 2009 | Completed: final sign-off Mar 2009 | [565 Clay St](https://www.permitgraph.org/a/0228/030) | replacement of extg cabinets, counter tops and furniture. re-use/ relocation of extg equipment and plmg fixtures at kchn area:some new equipment to replace extg. monor electrical and plmg for new ite… | $76,000 |
| [200812037732](https://www.permitgraph.org/p/200812037732) | Dec 3, 2008 | Never finaled: issued Dec 2008, no final | [450 Rhode Island St](https://www.permitgraph.org/a/3978/001) | install new 12'x 25' t-bar acoustical sound barrier ceiling at extg utility shaft on sales floor of whole foods market. | $8,000 |
| [200810164348](https://www.permitgraph.org/p/200810164348) | Oct 16, 2008 | Completed: final sign-off Oct 2008 | [450 Rhode Island St](https://www.permitgraph.org/a/3978/001) | demo extg message room. safe off utilities, as needed. demo non structural walls at extg massage room. 12'x14'x8' tall non bearing walls. patch concrete floor | $14,500 |
| [200804078982](https://www.permitgraph.org/p/200804078982) | Apr 7, 2008 | Completed: final sign-off Jun 2008 | [3595 California St](https://www.permitgraph.org/a/1035/003) | remodel (e) starbucks-remove door into hallway and replace it in new location (hallway). new finishes, light fixtures, no change to equipment | $10,000 |
| [200406146378](https://www.permitgraph.org/p/200406146378) | Jun 14, 2004 | Expired or cancelled: expired Jan 2007 | [74 New Montgomery St](https://www.permitgraph.org/a/3707/033) | repaint and re-fixture existing coffee shop | $66,000 |
| [200406146374](https://www.permitgraph.org/p/200406146374) | Jun 14, 2004 | Expired or cancelled: cancelled Nov 2024 | [74 New Montgomery St](https://www.permitgraph.org/a/3707/033) | repaint and refixture existing coffee shop |  |
| [200404151407](https://www.permitgraph.org/p/200404151407) | Apr 15, 2004 | Completed: final sign-off Sep 2004 | [27 Drumm St](https://www.permitgraph.org/a/0235/006) | equip.swap out(pastry case) remove back bar counter top & install nw stainless steel counter top | $10,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/wells-construction-inc-619655.
