We Do Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Oct 2018 to Oct 2026
- Last 24 months
- 102 permits filed
157 permits since 2000: 110 completed, 45 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
11 stairs permits: 5 completed, 6 in progress. Typically 56 days from filing to permit and 512 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 25, 2026 | Completed final sign-off Oct 2026 | 1919 Judah St | revision to pa# 202510217813: change to shape of finish stair elevation.Details
revision to pa# 202510217813: change to shape of finish stair elevation. | |
| Jan 14, 2026 | In progress issued Feb 2026 | 457 Oak St | revision to pa# 202508193437, add to scope more than 50% stair repair.Details
revision to pa# 202508193437, add to scope more than 50% stair repair. | |
| Dec 31, 2025 | In progress issued Jul 2026 | 241 Granville Wy | convert 640 sf of ground floor storage at rear into habitable. reconfigure windows and doors and facade at rear. add master suite on 1st floor. reconfigure rear stair to yard.Details
convert 640 sf of ground floor storage at rear into habitable. reconfigure windows and doors and facade at rear. add master suite on 1st floor. reconfigure rear stair to yard. | $92,000 |
| Oct 29, 2025 | In progress issued Nov 2025 | 64 Cook St | deck extention upgrade of an (e) exterior wood deck including the replacment of structural support, decking railing and stairs as needed located at rearDetails
deck extention upgrade of an (e) exterior wood deck including the replacment of structural support, decking railing and stairs as needed located at rear | $35,000 |
| Oct 21, 2025 | Completed final sign-off Oct 2026 | 1919 Judah St | in kind stair replacement. existing non compliant exterior entry stair system bring up to code. new garage door.Details
in kind stair replacement. existing non compliant exterior entry stair system bring up to code. new garage door. | $67,000 |
| Sep 3, 2025 | In progress issued Oct 2025 | 2519 32nd Av | interior remodel converting ground fl. into habitable space on ground floor. remodeling kitchen, bathroom, new plan configuration, adding 2 moere bedrooms & recreational room in ground fl., rebuilding stairs, adding a 2nd floor deck & exterior stairs, adding new windows/skylights. replacing cielingDetails
interior remodel converting ground fl. into habitable space on ground floor. remodeling kitchen, bathroom, new plan configuration, adding 2 moere bedrooms & recreational room in ground fl., rebuilding stairs, adding a 2nd floor deck & exterior stairs, adding new windows/skylights. replacing cieling | $400,000 |
| Aug 19, 2025 | In progress issued Aug 2025 | 457 Oak St | stairs repair like for like front. (less than 50%)Details
stairs repair like for like front. (less than 50%) | $40,000 |
| Nov 26, 2024 | Completed final sign-off Jul 2026 | 425 Valley St | stair reconfiguration, kitchen extension, open walls between dining/living, entry hallway. remodel master suite; new skylight, heat pump system, and tankless water heater. new beam in the lower floor (basement) for additional support. upgrade electrical panel from 100 to 150 ampDetails
stair reconfiguration, kitchen extension, open walls between dining/living, entry hallway. remodel master suite; new skylight, heat pump system, and tankless water heater. new beam in the lower floor (basement) for additional support. upgrade electrical panel from 100 to 150 amp | $175,000 |
| Oct 1, 2024 | Completed final sign-off Aug 2026 | 1740 Sanchez St | 1/f: remove e) garage, create new reconfifing garage, bedroom, bathroom & stair. 2nd/f: convert (e) living rm to 1 bedroom, family rm to 1 bedroom. remove (e) dining room and create (n) bathroom and dining room. remodel (e) kitchen. remove (e) bathroom to create new kids area. remove (e) dining roomDetails
1/f: remove e) garage, create new reconfifing garage, bedroom, bathroom & stair. 2nd/f: convert (e) living rm to 1 bedroom, family rm to 1 bedroom. remove (e) dining room and create (n) bathroom and dining room. remodel (e) kitchen. remove (e) bathroom to create new kids area. remove (e) dining room | $250,000 |
| Jun 27, 2024 | Completed final sign-off Oct 2026 | 2167 North Point St | 1st fl: (n) family room, bedroom, closet, bathroom & stairs to 2nd fl., laundry room and storage. (n) mudroom, remove (e) outdoor stairs. relocate upgrade main panel. 2nd fl: remodel kitchen & bathroom, infill (e) covered deck. (n) alum clad windows at front.Details
1st fl: (n) family room, bedroom, closet, bathroom & stairs to 2nd fl., laundry room and storage. (n) mudroom, remove (e) outdoor stairs. relocate upgrade main panel. 2nd fl: remodel kitchen & bathroom, infill (e) covered deck. (n) alum clad windows at front. | $70,000 |
| Apr 29, 2024 | In progress issued Feb 2025 | 2566 42nd Av | 1/f: remodel (e) bathroom, remodel (e) exterior stairs provide new, create new addition for new sitting room/ recreation room; 2/f: remove and replace (e) balcony railings as indicated,Details
1/f: remodel (e) bathroom, remodel (e) exterior stairs provide new, create new addition for new sitting room/ recreation room; 2/f: remove and replace (e) balcony railings as indicated, | $65,000 |