# Wcp Svcs, Dba: Venture Builders

Contractor license 477459. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/wcp-svcs-dba-venture-builders-477459
- JSON: https://www.permitgraph.org/api/contractor?license=477459
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=477459

366 permits since 2000: 260 completed, 27 never finaled, 79 expired or cancelled. Typically 13 days from filing to permit and 134 days from permit to final inspection. Of the 27 never-finaled permits, 27 are over 10 years old.

- Based in: San Francisco
- On San Francisco permits: Jan 2000 to Feb 2008
- Last 24 months: 0 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2000 | 17 | 0 | 0 | 21 |
| 2001 | 24 | 0 | 0 | 14 |
| 2002 | 17 | 0 | 9 | 15 |
| 2003 | 67 | 0 | 10 | 12 |
| 2004 | 33 | 0 | 2 | 6 |
| 2005 | 57 | 0 | 3 | 9 |
| 2006 | 38 | 0 | 0 | 1 |
| 2007 | 6 | 0 | 3 | 0 |
| 2008 | 1 | 0 | 0 | 1 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Stairs | 1 | 1 | 0 | 0 | 0 | 30 | 115 |
| Kitchen remodel | 1 | 1 | 0 | 0 | 0 | 3 | 116 |

## Most recent permits

The 100 most recent of 366.

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [200802255507](https://www.permitgraph.org/p/200802255507) | Feb 25, 2008 | Completed: final sign-off Dec 2008 | [71 Stevenson St](https://www.permitgraph.org/a/3708/028) | office tenant improvement on 3rd floor includes new offices, break rooms, conference rooms. mep, life safety, fire sprinkler under sepatare permit. | $975,000 |
| [200802255509](https://www.permitgraph.org/p/200802255509) | Feb 25, 2008 | Expired or cancelled: expired Oct 2013 | [71 Stevenson St](https://www.permitgraph.org/a/3708/028) | office tenant improvement on 2nd floor. work includes new offices, break araes, conference rooms. mep, fire sprinkler and life safety under separate permit. | $975,000 |
| [200710115182](https://www.permitgraph.org/p/200710115182) | Oct 11, 2007 | Completed: final sign-off Feb 2008 | [71 Stevenson St](https://www.permitgraph.org/a/3708/028) | t/i 9th floor-full floor remodel to provide new offices , conference room,open office space | $790,000 |
| [200709182922](https://www.permitgraph.org/p/200709182922) | Sep 18, 2007 | Completed: final sign-off Jan 2008 | [200 Brannan St](https://www.permitgraph.org/a/3774/429) | #510- replace existing kitchen hood and supply grill with ducting. | $42,940 |
| [200709172790](https://www.permitgraph.org/p/200709172790) | Sep 17, 2007 | Completed: final sign-off Nov 2007 | [200 Brannan St](https://www.permitgraph.org/a/3774/190) | provide new door in existing wall to create new room for window washing system | $20,000 |
| [200708311481](https://www.permitgraph.org/p/200708311481) | Aug 31, 2007 | Completed: final sign-off Dec 2007 | [90 New Montgomery St](https://www.permitgraph.org/a/3707/016) | demo partitions & door, build back walls & doors, $6,700 restroom upgrades. fire safety, electrical, mechanical on seperate permit. | $30,000 |
| [200708230757](https://www.permitgraph.org/p/200708230757) | Aug 23, 2007 | Never finaled: issued Aug 2007, no final | [405 Howard St](https://www.permitgraph.org/a/3737/001) | renewal for final inspection #200408242361 & #200408252567 |  |
| [200706143916](https://www.permitgraph.org/p/200706143916) | Jun 14, 2007 | Never finaled: issued Jun 2007, no final | [71 Stevenson St](https://www.permitgraph.org/a/3708/028) | oti-2, bare escentuals, 15th floor, me. | $9,200 |
| [200704249573](https://www.permitgraph.org/p/200704249573) | Apr 24, 2007 | Never finaled: issued Apr 2007, no final | [201 California St](https://www.permitgraph.org/a/0262/021) | interior soft demo of imterior rooms patition and finishes | $3,800 |
| [200701242452](https://www.permitgraph.org/p/200701242452) | Jan 24, 2007 | Completed: final sign-off Jul 2007 | [71 Stevenson St](https://www.permitgraph.org/a/3708/028) | oti-2, cushman & wakefield, 15/fl, me. | $20,000 |
| [200701091293](https://www.permitgraph.org/p/200701091293) | Jan 9, 2007 | Completed: final sign-off Jul 2007 | [71 Stevenson St](https://www.permitgraph.org/a/3708/028) | oti-2 el, floor 15 | $34,750 |
| [200611218235](https://www.permitgraph.org/p/200611218235) | Nov 21, 2006 | Completed: final sign-off Feb 2007 | [580 California St](https://www.permitgraph.org/a/0240/007) | oti-1 revision to pa# 2006/09/07/1638. 19th floor. | $30,000 |
| [200610256034](https://www.permitgraph.org/p/200610256034) | Oct 25, 2006 | Completed: final sign-off May 2007 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | oti-5, 22nd floor, ls | $42,000 |
| [200610165112](https://www.permitgraph.org/p/200610165112) | Oct 16, 2006 | Completed: final sign-off May 2007 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | oti-4, 22nd floor, me. | $145,000 |
| [200610124872](https://www.permitgraph.org/p/200610124872) | Oct 12, 2006 | Completed: final sign-off Feb 2007 | [580 California St](https://www.permitgraph.org/a/0240/007) | oti-3, 19th floor, el, me, sp. | $166,000 |
| [200610054273](https://www.permitgraph.org/p/200610054273) | Oct 5, 2006 | Completed: final sign-off May 2007 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | oti-3 22nd floor el | $218,000 |
| [200609111896](https://www.permitgraph.org/p/200609111896) | Sep 11, 2006 | Completed: final sign-off Jan 2007 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | oti-4, 15th floor, me. | $28,000 |
| [200609071638](https://www.permitgraph.org/p/200609071638) | Sep 7, 2006 | Completed: final sign-off Feb 2007 | [580 California St](https://www.permitgraph.org/a/0240/007) | oti-1, 19th floor, el, me, ls, sp. | $154,000 |
| [200608159497](https://www.permitgraph.org/p/200608159497) | Aug 15, 2006 | Completed: final sign-off Jan 2007 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | oti-2, 15th floor, ls | $55,000 |
| [200608159491](https://www.permitgraph.org/p/200608159491) | Aug 15, 2006 | Completed: final sign-off Jan 2007 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | oti-3, 15th floor, ls. | $20,000 |
| [200608048625](https://www.permitgraph.org/p/200608048625) | Aug 4, 2006 | Completed: final sign-off May 2007 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | oti-1 22/fl el, me, ls, sp | $475,000 |
| [200608038449](https://www.permitgraph.org/p/200608038449) | Aug 3, 2006 | Completed: final sign-off Oct 2006 | [433 California St](https://www.permitgraph.org/a/0260/016) | oti-3 4th floor me. | $20,000 |
| [200607267709](https://www.permitgraph.org/p/200607267709) | Jul 26, 2006 | Completed: final sign-off Oct 2006 | [71 Stevenson St](https://www.permitgraph.org/a/3708/028) | oti-3 13/f el | $30,000 |
| [200607207143](https://www.permitgraph.org/p/200607207143) | Jul 20, 2006 | Completed: final sign-off Oct 2006 | [71 Stevenson St](https://www.permitgraph.org/a/3708/028) | oti-2, 13th floor, li, sp. | $30,000 |
| [200607186865](https://www.permitgraph.org/p/200607186865) | Jul 18, 2006 | Completed: final sign-off Oct 2006 | [433 California St](https://www.permitgraph.org/a/0260/016) | oti-2, 4th fl, el. | $25,000 |
| [200606073407](https://www.permitgraph.org/p/200606073407) | Jun 7, 2006 | Expired or cancelled: expired Aug 2007 | [120 Montgomery St](https://www.permitgraph.org/a/0289/005) | oti-2 25th floor sp | $28,000 |
| [200605111367](https://www.permitgraph.org/p/200605111367) | May 11, 2006 | Completed: final sign-off Oct 2006 | [71 Stevenson St](https://www.permitgraph.org/a/3708/028) | oti-1 13th floor, el, me, ls. demo walls, (n) restroom upgrade. | $337,860 |
| [200604259802](https://www.permitgraph.org/p/200604259802) | Apr 25, 2006 | Completed: final sign-off May 2006 | [301 Howard St](https://www.permitgraph.org/a/3738/011) | oti-3 el, me, sp. life safety | $10,000 |
| [200604128799](https://www.permitgraph.org/p/200604128799) | Apr 12, 2006 | Completed: final sign-off May 2006 | [301 Howard St](https://www.permitgraph.org/a/3738/011) | oti-2 13th fl,el, me. | $41,360 |
| [200603307913](https://www.permitgraph.org/p/200603307913) | Mar 30, 2006 | Completed: final sign-off Jan 2007 | [120 Montgomery St](https://www.permitgraph.org/a/0289/005) | oti-1, 9th floor, el, me, ls, sp. | $460,560 |
| [200603307917](https://www.permitgraph.org/p/200603307917) | Mar 30, 2006 | Completed: final sign-off Jan 2007 | [120 Montgomery St](https://www.permitgraph.org/a/0289/005) | oti-1, 8th floor, el, me, ls, sp. | $460,560 |
| [200603307922](https://www.permitgraph.org/p/200603307922) | Mar 30, 2006 | Completed: final sign-off Jan 2007 | [120 Montgomery St](https://www.permitgraph.org/a/0289/005) | oti 2, 8th floor, el, me, ls. | $307,040 |
| [200603307919](https://www.permitgraph.org/p/200603307919) | Mar 30, 2006 | Completed: final sign-off Jan 2007 | [120 Montgomery St](https://www.permitgraph.org/a/0289/005) | oti-2, 9th floor, el, me, ls. | $307,040 |
| [200603307920](https://www.permitgraph.org/p/200603307920) | Mar 30, 2006 | Completed: final sign-off Jan 2007 | [120 Montgomery St](https://www.permitgraph.org/a/0289/005) | oti-2, 7th floor, el, me, ls. | $142,292 |
| [200603307915](https://www.permitgraph.org/p/200603307915) | Mar 30, 2006 | Completed: final sign-off Jan 2007 | [120 Montgomery St](https://www.permitgraph.org/a/0289/005) | oti-1 7th floor, el, me, ls, sp | $213,438 |
| [200603237352](https://www.permitgraph.org/p/200603237352) | Mar 23, 2006 | Completed: final sign-off Dec 2006 | [120 Montgomery St](https://www.permitgraph.org/a/0289/005) | 2nd floor - structural reinforcement of floor slab and adjacent beams to support high density filing oti-1 pa# 2006/03/10/6423 in processing (see attached). | $50,000 |
| [200603176921](https://www.permitgraph.org/p/200603176921) | Mar 17, 2006 | Completed: final sign-off Oct 2006 | [71 Stevenson St](https://www.permitgraph.org/a/3708/028) | interior soft demo 13th floor ti to follow | $50,000 |
| [200603136528](https://www.permitgraph.org/p/200603136528) | Mar 13, 2006 | Completed: final sign-off Apr 2006 | [441 California St](https://www.permitgraph.org/a/0260/016) | sprinklers- ref. appl#200602023636 ground floor | $7,500 |
| [200603106422](https://www.permitgraph.org/p/200603106422) | Mar 10, 2006 | Completed: final sign-off Dec 2006 | [120 Montgomery St](https://www.permitgraph.org/a/0289/005) | oti-2, 2nd floor, el, me. | $274,080 |
| [200603106423](https://www.permitgraph.org/p/200603106423) | Mar 10, 2006 | Completed: final sign-off Dec 2006 | [120 Montgomery St](https://www.permitgraph.org/a/0289/005) | oti-1, 2nd floor, el, me, ls, sp. | $411,120 |
| [200603096326](https://www.permitgraph.org/p/200603096326) | Mar 9, 2006 | Completed: final sign-off Oct 2006 | [71 Stevenson St](https://www.permitgraph.org/a/3708/028) | oti-2 12 flr el | $12,000 |
| [200603025823](https://www.permitgraph.org/p/200603025823) | Mar 2, 2006 | Completed: final sign-off Oct 2006 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | oti1, 15th floor, el, me, ls, sp. | $145,000 |
| [200603025826](https://www.permitgraph.org/p/200603025826) | Mar 2, 2006 | Completed: final sign-off Oct 2006 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | oti2, 15th floor, el, me | $27,000 |
| [200603015758](https://www.permitgraph.org/p/200603015758) | Mar 1, 2006 | Completed: final sign-off Apr 2006 | [441 California St](https://www.permitgraph.org/a/0260/016) | electrical only, reference no 200602023636 for t.i. | $14,925 |
| [200602164829](https://www.permitgraph.org/p/200602164829) | Feb 16, 2006 | Completed: final sign-off Apr 2006 | [441 California St](https://www.permitgraph.org/a/0260/016) | rvision to 200602023636-ground floor= restroom moved closer to existing waste pipe, mill work omitted. mechinical nad electrical work under eparate permit for200602023636 |  |
| [200602094236](https://www.permitgraph.org/p/200602094236) | Feb 9, 2006 | Completed: final sign-off Mar 2006 | [201 California St](https://www.permitgraph.org/a/0262/021) | oti-2 3rd floor el | $14,000 |
| [200602094230](https://www.permitgraph.org/p/200602094230) | Feb 9, 2006 | Completed: final sign-off Mar 2006 | [201 California St](https://www.permitgraph.org/a/0262/021) | oti-1 3rd floor el ls | $39,600 |
| [200601303310](https://www.permitgraph.org/p/200601303310) | Jan 30, 2006 | Completed: final sign-off May 2006 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | ot1-2 20th floor el. ref. to appl#200512200728 & 200512059510 | $20,000 |
| [200601172267](https://www.permitgraph.org/p/200601172267) | Jan 17, 2006 | Completed: final sign-off Mar 2006 | [301 Howard St](https://www.permitgraph.org/a/3738/011) | oti-3, 9th floor, ls. | $11,120 |
| [200601061620](https://www.permitgraph.org/p/200601061620) | Jan 6, 2006 | Completed: final sign-off Mar 2006 | [301 Howard St](https://www.permitgraph.org/a/3738/011) | oti-2 9th/fl-el,me. | $9,000 |
| [200512200728](https://www.permitgraph.org/p/200512200728) | Dec 20, 2005 | Completed: final sign-off May 2006 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | oti-1 rev. 20th floor, el, me, ls, sp. | $2,000 |
| [200512190607](https://www.permitgraph.org/p/200512190607) | Dec 19, 2005 | Completed: final sign-off Mar 2006 | [301 Howard St](https://www.permitgraph.org/a/3738/011) | oti-1 rev. 9th fl., el, me, ls, sp change in location of demising wall (e) demising wall to remain.change in location of required exit door (no new door & alcove,existing exit door to qualify as requ… | $100 |
| [200512140287](https://www.permitgraph.org/p/200512140287) | Dec 14, 2005 | Completed: final sign-off Nov 2006 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | oti-4, 5th floor, ls. | $21,700 |
| [200512059510](https://www.permitgraph.org/p/200512059510) | Dec 5, 2005 | Completed: final sign-off May 2006 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | oti-1 20th floor el me ls sp | $72,000 |
| [200511309173](https://www.permitgraph.org/p/200511309173) | Nov 30, 2005 | Completed: final sign-off May 2006 | [501 02nd St](https://www.permitgraph.org/a/3774/067) | 4/f structural ref.#200509203373 add 8"xc16mtl studs to show structural stabibity of wall, add steel barn door structural assembly (2) | $5,000 |
| [200511309164](https://www.permitgraph.org/p/200511309164) | Nov 30, 2005 | Completed: final sign-off May 2006 | [501 02nd St](https://www.permitgraph.org/a/3774/067) | oti-2 4th floor, el, me. electrical & mechanical | $200,000 |
| [200511097759](https://www.permitgraph.org/p/200511097759) | Nov 9, 2005 | Completed: final sign-off Nov 2006 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | oti-3 5th/fl-me. | $121,710 |
| [200511027226](https://www.permitgraph.org/p/200511027226) | Nov 2, 2005 | Completed: final sign-off Nov 2006 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | oti-2 lt | $75,000 |
| [200510286836](https://www.permitgraph.org/p/200510286836) | Oct 28, 2005 | Completed: final sign-off Jun 2006 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | oti-4, 16th floor, ls. | $29,583 |
| [200510286833](https://www.permitgraph.org/p/200510286833) | Oct 28, 2005 | Completed: final sign-off Jun 2006 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | oti-4, 18th floor, ls. | $11,833 |
| [200510206064](https://www.permitgraph.org/p/200510206064) | Oct 20, 2005 | Completed: final sign-off Jun 2006 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | oti-2 17th floor sp | $10,000 |
| [200510206063](https://www.permitgraph.org/p/200510206063) | Oct 20, 2005 | Completed: final sign-off Jun 2006 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | oti-2 18th floor sp | $8,250 |
| [200510206062](https://www.permitgraph.org/p/200510206062) | Oct 20, 2005 | Completed: final sign-off Jun 2006 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | oti-2 16th floor sp | $15,600 |
| [200510145636](https://www.permitgraph.org/p/200510145636) | Oct 14, 2005 | Completed: final sign-off Feb 2006 | [360 Post St](https://www.permitgraph.org/a/0295/006) | oti-2-6th fl= me | $5,800 |
| [200510125322](https://www.permitgraph.org/p/200510125322) | Oct 12, 2005 | Completed: final sign-off Mar 2006 | [201 California St](https://www.permitgraph.org/a/0262/021) | oti-1 rev 13th/ fl | $25,000 |
| [200510125320](https://www.permitgraph.org/p/200510125320) | Oct 12, 2005 | Expired or cancelled: expired Mar 2007 | [201 California St](https://www.permitgraph.org/a/0262/021) | oti-2, 13th floor, el, me. | $75,000 |
| [200510054847](https://www.permitgraph.org/p/200510054847) | Oct 5, 2005 | Completed: final sign-off Nov 2006 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | oti-1, 5th floor, el, me, ls, sp. | $475,000 |
| [200509203373](https://www.permitgraph.org/p/200509203373) | Sep 20, 2005 | Completed: final sign-off May 2006 | [501 02nd St](https://www.permitgraph.org/a/3774/067) | oti-1 at 4th fl, el, me, ls,sp. | $240,000 |
| [200508241150](https://www.permitgraph.org/p/200508241150) | Aug 24, 2005 | Expired or cancelled: cancelled Sep 2006 | [120 Montgomery St](https://www.permitgraph.org/a/0289/005) | commercial t.i. non structural t.i. giving back a portion of floor. re-do ceiling work. | $355,000 |
| [200508241146](https://www.permitgraph.org/p/200508241146) | Aug 24, 2005 | Expired or cancelled: expired Oct 2006 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | revision to pa# 2005/08/02/9221. widen one portion of new corridor & add 1 "s" door. | $4,000 |
| [200508241153](https://www.permitgraph.org/p/200508241153) | Aug 24, 2005 | Completed: final sign-off Mar 2006 | [201 California St](https://www.permitgraph.org/a/0262/021) | oti-2, 13th floor, el, me. | $380,000 |
| [200508109949](https://www.permitgraph.org/p/200508109949) | Aug 10, 2005 | Expired or cancelled: expired Oct 2007 | [301 Howard St](https://www.permitgraph.org/a/3738/011) | oti-3 18/f el electrical only | $10,000 |
| [200508059574](https://www.permitgraph.org/p/200508059574) | Aug 5, 2005 | Completed: final sign-off Oct 2005 | [301 Howard St](https://www.permitgraph.org/a/3738/011) | oti-2 ls 18/f oti-1 2005/06/14/5073 | $16,000 |
| [200508029221](https://www.permitgraph.org/p/200508029221) | Aug 2, 2005 | Completed: final sign-off Jun 2006 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | extend the rated corridor & install demising wall (3) . ref oti-1, pa# 2005/07/26/8606. | $22,000 |
| [200507268604](https://www.permitgraph.org/p/200507268604) | Jul 26, 2005 | Expired or cancelled: withdrawn Aug 2005 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | stuctural support for movable partition. disabled access 0on reference oti-1 | $5,000 |
| [200507268609](https://www.permitgraph.org/p/200507268609) | Jul 26, 2005 | Completed: final sign-off Jun 2006 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | oti-2, 18th floor, el,me. | $77,000 |
| [200507268606](https://www.permitgraph.org/p/200507268606) | Jul 26, 2005 | Completed: final sign-off Jun 2006 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | oti-1, 18th floor, el, me, ls, sp. | $115,000 |
| [200507187863](https://www.permitgraph.org/p/200507187863) | Jul 18, 2005 | Completed: final sign-off Aug 2005 | [433 California St](https://www.permitgraph.org/a/0260/016) | oti-3 3rd floor el me | $115,000 |
| [200507157723](https://www.permitgraph.org/p/200507157723) | Jul 15, 2005 | Completed: final sign-off Jun 2006 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | oti-1, 17th/fl-el,me, ls, sp. | $190,000 |
| [200507157730](https://www.permitgraph.org/p/200507157730) | Jul 15, 2005 | Completed: final sign-off Jun 2006 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | oti-1 16th/fl-el,me,ls, sp. | $210,000 |
| [200507157734](https://www.permitgraph.org/p/200507157734) | Jul 15, 2005 | Completed: final sign-off Jun 2006 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | oti-2, 16th/fl-el,me. | $130,000 |
| [200507157739](https://www.permitgraph.org/p/200507157739) | Jul 15, 2005 | Completed: final sign-off Jun 2006 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | oti-2, 17th/fl-el,me,ls,sp. | $130,000 |
| [200507056795](https://www.permitgraph.org/p/200507056795) | Jul 5, 2005 | Completed: final sign-off Mar 2006 | [201 California St](https://www.permitgraph.org/a/0262/021) | oti-1, 13th floor, el, me, ls, sp. | $400,000 |
| [200507016715](https://www.permitgraph.org/p/200507016715) | Jul 1, 2005 | Never finaled: issued Jul 2005, no final | [433 California St](https://www.permitgraph.org/a/0260/016) | oti-3 4th flfoor el, me | $89,000 |
| [200506276130](https://www.permitgraph.org/p/200506276130) | Jun 27, 2005 | Completed: final sign-off Sep 2006 | [201 California St](https://www.permitgraph.org/a/0262/021) | oti-4 27th floor sp | $4,900 |
| [200506276094](https://www.permitgraph.org/p/200506276094) | Jun 27, 2005 | Completed: final sign-off Jan 2006 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | oti-4,3rd/fl-el,me. | $115,000 |
| [200506215627](https://www.permitgraph.org/p/200506215627) | Jun 21, 2005 | Completed: final sign-off Jan 2006 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | oti-3 ls 15th fl | $35,000 |
| [200506205512](https://www.permitgraph.org/p/200506205512) | Jun 20, 2005 | Expired or cancelled: cancelled Mar 2007 | [301 Howard St](https://www.permitgraph.org/a/3738/011) | oti-1, 16th floor, el, me, ls, sp. | $81,640 |
| [200506175377](https://www.permitgraph.org/p/200506175377) | Jun 17, 2005 | Completed: final sign-off Sep 2005 | [501 02nd St](https://www.permitgraph.org/a/3774/067) | oti-2, 4th floor, el & me. | $25,000 |
| [200506175385](https://www.permitgraph.org/p/200506175385) | Jun 17, 2005 | Completed: final sign-off Nov 2005 | [301 Howard St](https://www.permitgraph.org/a/3738/011) | oti-4, 5th floor, me. | $82,500 |
| [200506145073](https://www.permitgraph.org/p/200506145073) | Jun 14, 2005 | Completed: final sign-off Oct 2005 | [301 Howard St](https://www.permitgraph.org/a/3738/011) | oti-1, 18th floor, el, me, ls, sp. | $25,000 |
| [200506134942](https://www.permitgraph.org/p/200506134942) | Jun 13, 2005 | Completed: final sign-off Dec 2005 | [201 California St](https://www.permitgraph.org/a/0262/021) | oti:3: 10th fl. sp | $8,500 |
| [200506134902](https://www.permitgraph.org/p/200506134902) | Jun 13, 2005 | Completed: final sign-off Jan 2006 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | oti-2 sp 15th floor | $6,800 |
| [200506134894](https://www.permitgraph.org/p/200506134894) | Jun 13, 2005 | Completed: final sign-off Sep 2005 | [1 Market St](https://www.permitgraph.org/a/3713/007) | oti-3 26/f el | $3,100 |
| [200506074407](https://www.permitgraph.org/p/200506074407) | Jun 7, 2005 | Completed: final sign-off Dec 2005 | [201 California St](https://www.permitgraph.org/a/0262/021) | oti-3 11th floor - sp | $35,000 |
| [200506064289](https://www.permitgraph.org/p/200506064289) | Jun 6, 2005 | Completed: final sign-off Oct 2005 | [301 Howard St](https://www.permitgraph.org/a/3738/011) | oti-3, 5th floor, ls. | $19,000 |
| [200505253449](https://www.permitgraph.org/p/200505253449) | May 25, 2005 | Completed: final sign-off Sep 2005 | [1 Market St](https://www.permitgraph.org/a/3713/007) | oti-1 26th fl elmme le,sp | $45,000 |
| [200505253474](https://www.permitgraph.org/p/200505253474) | May 25, 2005 | Completed: final sign-off Sep 2005 | [1 Market St](https://www.permitgraph.org/a/3713/007) | oti-2 26th fl sp | $5,000 |
| [200505172616](https://www.permitgraph.org/p/200505172616) | May 17, 2005 | Completed: final sign-off Aug 2005 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | oti-2, 2nd floor, el | $20,000 |
| [200505122227](https://www.permitgraph.org/p/200505122227) | May 12, 2005 | Completed: final sign-off Dec 2005 | [201 California St](https://www.permitgraph.org/a/0262/021) | oti-2, 11th floor, el, me, sp .oti-1 pa# 2005/03/14/7451 | $250,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/wcp-svcs-dba-venture-builders-477459.