# Walton Engineering Inc.

Contractor license 617238. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/walton-engineering-inc-617238
- JSON: https://www.permitgraph.org/api/contractor?license=617238
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=617238

13 permits since 2000: 10 completed, 3 never finaled. Typically 11 days from filing to permit and 34 days from permit to final inspection. Of the 3 never-finaled permits, 3 are over 10 years old.

- Based in: West Sacramento
- On San Francisco permits: Jul 2009 to Jan 2015
- Last 24 months: 0 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2009 | 5 | 0 | 0 | 0 |
| 2011 | 1 | 0 | 0 | 0 |
| 2012 | 2 | 0 | 3 | 0 |
| 2014 | 1 | 0 | 0 | 0 |
| 2015 | 1 | 0 | 0 | 0 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [201501276791](https://www.permitgraph.org/p/201501276791) | Jan 27, 2015 | Completed: final sign-off Mar 2015 | [2301 19th Av](https://www.permitgraph.org/a/2348/001) | remove & replace underground fuel piping, disconnect & reconnect electrical at tanks & dispensers; remove & reinstall existing fuel dispensers; maher n/a | $54,622 |
| [201403251630](https://www.permitgraph.org/p/201403251630) | Mar 25, 2014 | Completed: final sign-off Jun 2014 | [2690 03rd St](https://www.permitgraph.org/a/4172/022) | removal of two underground compartmented (2 compartments each) fuel tanks and associated fuel piping. backfill to grade. need compliance with ordinance# 155-13 | $58,622 |
| [201210172256](https://www.permitgraph.org/p/201210172256) | Oct 17, 2012 | Never finaled: issued Oct 2012, no final | [1800 Lombard St](https://www.permitgraph.org/a/0494/005) | shoring permit only: install sheet pile into a 27'-6 1/2" x 36'-2" x 16' deep excavation. | $15,000 |
| [201209109357](https://www.permitgraph.org/p/201209109357) | Sep 10, 2012 | Never finaled: issued Sep 2012, no final | [1800 Lombard St](https://www.permitgraph.org/a/0494/005) | replace 2 existing fuel canopy structures | $60,000 |
| [201201232710](https://www.permitgraph.org/p/201201232710) | Jan 23, 2012 | Completed: final sign-off Oct 2012 | [3550 Mission St](https://www.permitgraph.org/a/6660/058) | fuel system upgrade to (e) gas station, scope include remove underground storage tanks (ust). single wall piping, dispensers & tank trims & replace with new double wall (ust), piping & dispenser & ta… | $210,000 |
| [201201232709](https://www.permitgraph.org/p/201201232709) | Jan 23, 2012 | Completed: final sign-off Sep 2012 | [551 03rd St](https://www.permitgraph.org/a/3775/025) | fuel system upgrade to (e) gas station. scope include remove the underground storage tanks/ust. single wall piping, dispensers & tank trim & replace with new double wall ust & tank trims, double wall… | $210,000 |
| [201201232708](https://www.permitgraph.org/p/201201232708) | Jan 23, 2012 | Never finaled: issued Oct 2012, no final | [1800 Lombard St](https://www.permitgraph.org/a/0494/005) | remove (e) fuel system (underground tanks & piping & dispensers). replace with double wall ust & piping & new dispensers including tank trims. this project include fuel system upgrade to (e) gas stat… | $210,000 |
| [201103313212](https://www.permitgraph.org/p/201103313212) | Mar 31, 2011 | Completed: final sign-off Apr 2011 | [2301 19th Av](https://www.permitgraph.org/a/2348/001) | remove & replace 3 (e) fuel dispensers. remove (e) healy vapor tank & replace with vapor canister unit. note: fuel dispensers are all the same size & same location | $16,462 |
| [200907092333](https://www.permitgraph.org/p/200907092333) | Jul 9, 2009 | Completed: final sign-off Aug 2009 | [2690 03rd St](https://www.permitgraph.org/a/4172/022) | clear fire dept. violation #5279 by installing bollards to comply with sffd vapor recovery checklist dated 07/24/2008. | $33,000 |
| [200907092328](https://www.permitgraph.org/p/200907092328) | Jul 9, 2009 | Completed: final sign-off Aug 2009 | [2000 19th Av](https://www.permitgraph.org/a/2138/029) | existing cas/evr intalled to comply with sffd violation 5277 | $33,000 |
| [200907092325](https://www.permitgraph.org/p/200907092325) | Jul 9, 2009 | Completed: final sign-off Sep 2009 | [2301 19th Av](https://www.permitgraph.org/a/2348/001) | existing cas/evr installed. need to make complaint per sffd violation # 5278 by adding rated enclosure. | $33,000 |
| [200907092331](https://www.permitgraph.org/p/200907092331) | Jul 9, 2009 | Completed: final sign-off Aug 2009 | [200 Toland St](https://www.permitgraph.org/a/5230/016) | existing cas/evr installed to comply with sffd violation # 5348 | $33,000 |
| [200907092322](https://www.permitgraph.org/p/200907092322) | Jul 9, 2009 | Completed: final sign-off Aug 2009 | [3300 Cesar Chavez St](https://www.permitgraph.org/a/6571/011) | existing clean air separator ( cas) / enhanced vapor recovery ( epr) installed to comply with sffd violation # 5349 by adding rated enclosure and bollards per cfc 312.2 # 5 and cfc 312.2 #2. | $33,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.