144 permits since 2000: 76 completed, 52 never finaled, 16 expired or cancelled. Typically 1 days from filing to permit and 94 days from permit to final inspection. Of the 52 never-finaled permits, 1 is 3 to 5 years old, 11 are 5 to 10 years old, 40 are over 10 years old.

- Based in: San Francisco
- On San Francisco permits: Dec 2001 to Feb 2023
- Last 24 months: 0 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2001 | 1 | 0 | 0 | 0 |
| 2004 | 1 | 0 | 0 | 0 |
| 2006 | 1 | 0 | 0 | 0 |
| 2007 | 2 | 0 | 0 | 0 |
| 2009 | 3 | 0 | 1 | 1 |
| 2010 | 5 | 0 | 0 | 3 |
| 2011 | 7 | 0 | 3 | 2 |
| 2012 | 8 | 0 | 11 | 7 |
| 2013 | 12 | 0 | 11 | 1 |
| 2014 | 5 | 0 | 11 | 0 |
| 2015 | 8 | 0 | 2 | 1 |
| 2016 | 2 | 0 | 1 | 0 |
| 2017 | 4 | 0 | 1 | 0 |
| 2018 | 10 | 0 | 6 | 0 |
| 2019 | 7 | 0 | 1 | 1 |
| 2020 | 0 | 0 | 2 | 0 |
| 2021 | 0 | 0 | 1 | 0 |
| 2023 | 0 | 0 | 1 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Kitchen remodel | 11 | 6 | 0 | 4 | 1 | 0 | 204 |
| Bathroom remodel | 18 | 11 | 0 | 5 | 2 | 4 | 210 |
| Roof deck | 1 | 1 | 0 | 0 | 0 | 6 | 239 |
| Deck | 4 | 2 | 0 | 2 | 0 | 24 | 179 |
| Stairs | 3 | 1 | 0 | 1 | 1 | 28 | 243 |

## Most recent permits

The 100 most recent of 144.

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202302141955](https://www.permitgraph.org/p/202302141955) | Feb 14, 2023 | Never finaled: issued Feb 2023, no final | [4 Embarcadero Center](https://www.permitgraph.org/a/0233/044) | add one entrance door to lobby of plaza area, fill (e) niche at walk way for part of cold storage within restaurant kitchen. fire sprinkler and life safety under seperate permit. | $50,000 |
| [202104219054](https://www.permitgraph.org/p/202104219054) | Apr 21, 2021 | Never finaled: issued Jun 2021, no final | [4 Embarcadero Center](https://www.permitgraph.org/a/0233/045) | install hydronic radiant pane (heat) and circulation pump for heating of outdoor patio area. | $3,000 |
| [202002194881](https://www.permitgraph.org/p/202002194881) | Feb 19, 2020 | Never finaled: issued Feb 2020, no final | [67 Twin Peaks Bl](https://www.permitgraph.org/a/2661/003) | remodel master bathroom, replace floor tile, bathroom fixtures, repair and replace dryrot flooring plywood as needed. | $5,000 |
| [202002194884](https://www.permitgraph.org/p/202002194884) | Feb 19, 2020 | Never finaled: issued Feb 2020, no final | [67 Twin Peaks Bl](https://www.permitgraph.org/a/2661/003) | replace roofing with "cold apply" mtacrylics roofing repair/patch and replace dryrot plywood as needed. work not visible from street. | $2,000 |
| [201911258064](https://www.permitgraph.org/p/201911258064) | Nov 25, 2019 | Completed: final sign-off Dec 2019 | [1601 Quesada Av](https://www.permitgraph.org/a/5339/001) | administrative permit to revise pa#201906193909, remove all scope of work in basement level and 2/f, maintenance noly, all plumbing fixtures are replaced in-kind, update da checklist. |  |
| [201911137211](https://www.permitgraph.org/p/201911137211) | Nov 13, 2019 | Completed: final sign-off Feb 2020 | [3906 Sacramento St](https://www.permitgraph.org/a/1014/007) | replace roof sheathing caused by dry rot, remove (e) roofing material and apply new cold apply metacrylico roofing. not visible from street. maher n/a. | $9,000 |
| [201910174764](https://www.permitgraph.org/p/201910174764) | Oct 17, 2019 | Expired or cancelled: expired Oct 2023 | [2050 Jackson St](https://www.permitgraph.org/a/0591/004B) | interior remodel of ground floor to consist of adding 1 bedroom to family room and increasing bathroom size by reducing laundry room n/a maher | $5,000 |
| [201909131592](https://www.permitgraph.org/p/201909131592) | Sep 13, 2019 | Completed: final sign-off Sep 2021 | [557 03rd Av](https://www.permitgraph.org/a/1546/012) | remove partition wall at 1st floor and relocate bathroom fixtures. install 2 new tankless water heater. add 1 new master bathroom and bedroom at 2nd floor. add 1 new bedrooms, bathroom, and storage a… | $150,000 |
| [201909040601](https://www.permitgraph.org/p/201909040601) | Sep 4, 2019 | Completed: final sign-off Jun 2021 | [32 Clement St](https://www.permitgraph.org/a/1432/020) | commercial ti interior renovation on gr fl for medical office | $12,000 |
| [201906254332](https://www.permitgraph.org/p/201906254332) | Jun 25, 2019 | Never finaled: issued Jun 2019, no final | [557 03rd Av](https://www.permitgraph.org/a/1546/012) | clean up trash and no structural fire damage debris repair works under sep permit. electrical service will be turn back on for repair and clean up. | $1,000 |
| [201906193909](https://www.permitgraph.org/p/201906193909) | Jun 19, 2019 | Completed: final sign-off Dec 2019 | [1601 Quesada Av](https://www.permitgraph.org/a/5339/001) | renovation. ada barrier removal and deferred maintenance repair. prop-up wooden fence. repair and replace bathroom fixtures in-kind on basement level. (e) heating system to remain. | $400,000 |
| [201903135081](https://www.permitgraph.org/p/201903135081) | Mar 13, 2019 | Completed: final sign-off Apr 2019 | [205 13th St](https://www.permitgraph.org/a/3531/028) | revision to approved bpa #201902011859. update for usage of training rooms and reflected lighting plan. |  |
| [201902011859](https://www.permitgraph.org/p/201902011859) | Feb 1, 2019 | Completed: final sign-off Apr 2019 | [205 13th St](https://www.permitgraph.org/a/3531/028) | 2nd floor #2050: t.i. to remove non structural partition walls and doors. install new non-structural partition walls and doors, including new paint and carpet, no change of use. n/a for maher | $75,000 |
| [201811206380](https://www.permitgraph.org/p/201811206380) | Nov 20, 2018 | Completed: final sign-off Nov 2018 | [4 Embarcadero Center](https://www.permitgraph.org/a/0233/045) | replace (e) gate with new gate new panic hardware and fire know box at restaurant on lobby level | $1,000 |
| [201809139950](https://www.permitgraph.org/p/201809139950) | Sep 13, 2018 | Completed: final sign-off Dec 2019 | [1601 Quesada Av](https://www.permitgraph.org/a/5339/001) | replace existing exterior wood windows, 21 total. replace in-kind. same size. same location. m= 0.32 max | $6,000 |
| [201808248259](https://www.permitgraph.org/p/201808248259) | Aug 24, 2018 | Completed: final sign-off Sep 2018 | [145 Jefferson St](https://www.permitgraph.org/a/0013/016) | provide lighting plan with title 24, refer ti permit #201806141864. maher na | $3,000 |
| [201807205089](https://www.permitgraph.org/p/201807205089) | Jul 20, 2018 | Never finaled: issued Jul 2018, no final | [145 Jefferson St](https://www.permitgraph.org/a/0013/016) | provide structural detail to exterior signs and facade decoration. ref 201805149067. maher n/a | $5,000 |
| [201807184888](https://www.permitgraph.org/p/201807184888) | Jul 18, 2018 | Completed: final sign-off Sep 2018 | [145 Jefferson St](https://www.permitgraph.org/a/0013/016) | install one illuminated single-faced wall sign for lefty ballpark baseball buffet & cafe. maher n/a. | $3,000 |
| [201807184889](https://www.permitgraph.org/p/201807184889) | Jul 18, 2018 | Completed: final sign-off Sep 2018 | [145 Jefferson St](https://www.permitgraph.org/a/0013/016) | install one illuminated single-faced wall sign for giants dugout store. | $2,000 |
| [201806141864](https://www.permitgraph.org/p/201806141864) | Jun 14, 2018 | Completed: final sign-off Sep 2018 | [145 Jefferson St](https://www.permitgraph.org/a/0013/016) | ti for change ownership of (e) restaurant - mep, fire sprinkler & fire alarm under separate permit. maher na | $180,000 |
| [201805149067](https://www.permitgraph.org/p/201805149067) | May 14, 2018 | Never finaled: issued Jun 2018, no final | [145 Jefferson St](https://www.permitgraph.org/a/0013/016) | facade improvements to include new metal truss, metal faux truss, sconces, led digital panels, signs sep permit | $8,000 |
| [201805048277](https://www.permitgraph.org/p/201805048277) | May 4, 2018 | Completed: final sign-off May 2018 | [531 28th Av](https://www.permitgraph.org/a/1516/005) | voluntary strengthening existing concrete wall and footing in the garage. | $6,000 |
| [201805017885](https://www.permitgraph.org/p/201805017885) | May 1, 2018 | Completed: final sign-off Sep 2018 | [145 Jefferson St](https://www.permitgraph.org/a/0013/016) | in existing vacant restaurant space, replace damaged non-structural walls, install non-bearing partition for out walls and infill extg floor opening at 2nd floor in preparation for future t.i. no ext… | $30,000 |
| [201804176555](https://www.permitgraph.org/p/201804176555) | Apr 17, 2018 | Never finaled: issued Apr 2018, no final | [2231 Leavenworth St](https://www.permitgraph.org/a/0071/004) | to obtain final inspection for work approved under pa#09502550, 8413306. all work is complete. |  |
| [201802151364](https://www.permitgraph.org/p/201802151364) | Feb 15, 2018 | Never finaled: issued Feb 2018, no final | [1317 20th Av](https://www.permitgraph.org/a/1775/052) | administrative permit to clarify proposed occupancy class on 201707212606(change from retail use), should be from e b occupancy to (massage, personal use) to new b occupancy after school tutorial, pe… |  |
| [201802141249](https://www.permitgraph.org/p/201802141249) | Feb 14, 2018 | Completed: final sign-off Sep 2018 | [145 Jefferson St](https://www.permitgraph.org/a/0013/016) | exploratory soft demolition, not structure, remove artificial folies and decorative panels. prepare for future tenant improvement. interior only. maher not req | $1,000 |
| [201802060571](https://www.permitgraph.org/p/201802060571) | Feb 6, 2018 | Completed: final sign-off Mar 2018 | [1345 Taylor St](https://www.permitgraph.org/a/0189/002) | administrative permit to clarify the design system, method and scope of work of soft story permit #201708023707 and supersede permit #201609076934 | $70,000 |
| [201801199092](https://www.permitgraph.org/p/201801199092) | Jan 19, 2018 | Never finaled: issued May 2018, no final | [26 Clement St](https://www.permitgraph.org/a/1432/019) | voluntary soft story upgrade per ab-094 using cebc 2016 appx a4 maher na 201801199094 demo work to be done first. maher n/a | $50,000 |
| [201801199094](https://www.permitgraph.org/p/201801199094) | Jan 19, 2018 | Never finaled: issued May 2018, no final | [26 Clement St](https://www.permitgraph.org/a/1432/019) | safe demo at ground floor level, remain vacancy under ab-017 maher na- to be done before soft story under 201801109092. maher n/a | $1,500 |
| [201711133832](https://www.permitgraph.org/p/201711133832) | Nov 13, 2017 | Completed: final sign-off May 2018 | [165 Jefferson St](https://www.permitgraph.org/a/0013/006A) | install new sink & prep tables, install new low wall 6' h, (e) mep to be remain. fire sprinkler & life safety system under separate permit.nochange of occupancy. | $4,500 |
| [201710181538](https://www.permitgraph.org/p/201710181538) | Oct 18, 2017 | Completed: final sign-off Jun 2019 | [1010 Market St](https://www.permitgraph.org/a/0350/001) | change of use from retail to office, g/f- interior t.i. to convert retail space into public facility business office at ground floor. work includes non-structural work, new non-load bearing partition… | $27,000 |
| [201710161341](https://www.permitgraph.org/p/201710161341) | Oct 16, 2017 | Completed: final sign-off Oct 2017 | [634 45th Av](https://www.permitgraph.org/a/1587/032) | to abate nov #201762863 by removing window and infill opening as previously approved under pa# 201404294518. revert back to approved plans. |  |
| [201709269602](https://www.permitgraph.org/p/201709269602) | Sep 26, 2017 | Never finaled: issued Sep 2017, no final | [1149 Potrero Av](https://www.permitgraph.org/a/4212/018) | replace extg side windows in kind with double pane. n/a for maher | $2,000 |
| [201708023707](https://www.permitgraph.org/p/201708023707) | Aug 2, 2017 | Completed: final sign-off Mar 2018 | [1345 Taylor St](https://www.permitgraph.org/a/0189/002) | revision to pa#201609076934 and to reconfigurate structural detail for soft story retrofit. |  |
| [201610261216](https://www.permitgraph.org/p/201610261216) | Oct 26, 2016 | Completed: final sign-off Nov 2017 | [2233 Vicente St](https://www.permitgraph.org/a/2463A/014) | painted wall, non-structural sign | $1,000 |
| [201609016597](https://www.permitgraph.org/p/201609016597) | Sep 1, 2016 | Never finaled: issued Sep 2016, no final | [1224 Grant Av](https://www.permitgraph.org/a/0145/014) | install 2 hours fire rated concrete block wall approx 3'x8'to close up opening to adjacent building which was openned under pa #9502053 | $600 |
| [201606039058](https://www.permitgraph.org/p/201606039058) | Jun 3, 2016 | Completed: final sign-off Jun 2016 | [316 Columbus Av](https://www.permitgraph.org/a/0145/013) | to renew pa# 9921736 for final inspection, all works were completed. |  |
| [201512114854](https://www.permitgraph.org/p/201512114854) | Dec 11, 2015 | Never finaled: issued Dec 2015, no final | [950 Geneva Av](https://www.permitgraph.org/a/6411/029) | to comply n.o.v. #201519031 and #20152232, get plumbing and electrical permits for inspection | $1,000 |
| [201509187387](https://www.permitgraph.org/p/201509187387) | Sep 18, 2015 | Completed: final sign-off Apr 2018 | [632 45th Av](https://www.permitgraph.org/a/1587/033) | provide underpinning to allow excavation at 634 45th ave. | $20,000 |
| [201509187383](https://www.permitgraph.org/p/201509187383) | Sep 18, 2015 | Expired or cancelled: expired Dec 2018 | [634 45th Av](https://www.permitgraph.org/a/1587/032) | revision to pa#201504083139 temperory shoring | $40,000 |
| [201507020608](https://www.permitgraph.org/p/201507020608) | Jul 2, 2015 | Completed: final sign-off Oct 2015 | [5238 Diamond Heights Bl](https://www.permitgraph.org/a/7521/002) | comply with nov #201552665 - change of ownership for restaurant. add rice cooker & type 11 hood installation. | $6,000 |
| [201505186533](https://www.permitgraph.org/p/201505186533) | May 18, 2015 | Completed: final sign-off Dec 2015 | [730 Sacramento St](https://www.permitgraph.org/a/0226/011) | tenant improvement per plan, no structural work. n/a maher ord. # 155-13 | $70,000 |
| [201504073029](https://www.permitgraph.org/p/201504073029) | Apr 7, 2015 | Completed: final sign-off Nov 2015 | [2550 Van Ness Av](https://www.permitgraph.org/a/0526/021) | to obtain final inspection for work approved under pa# 201012176961. all work is complete. |  |
| [201504073026](https://www.permitgraph.org/p/201504073026) | Apr 7, 2015 | Completed: final sign-off Jun 2015 | [2550 Van Ness Av](https://www.permitgraph.org/a/0526/021) | to obtain final inspection for work approved under pa#201012227196. all work is complete. |  |
| [201504073027](https://www.permitgraph.org/p/201504073027) | Apr 7, 2015 | Completed: final sign-off Nov 2015 | [2550 Van Ness Av](https://www.permitgraph.org/a/0526/021) | to obtain final inspection for work approved under pa# 201105035236. all work is complete. |  |
| [201502027195](https://www.permitgraph.org/p/201502027195) | Feb 2, 2015 | Completed: final sign-off Feb 2015 | [2550 Van Ness Av](https://www.permitgraph.org/a/0526/021) | revise foundation detail to approved pa#201012317682 for final inspection and comply nov# 2014110022, #201163688. n/a ordinance #155-13 |  |
| [201502027180](https://www.permitgraph.org/p/201502027180) | Feb 2, 2015 | Completed: final sign-off Feb 2015 | [2550 Van Ness Av](https://www.permitgraph.org/a/0526/021) | renew pa# 201012317682 for final inspection. all work were done. |  |
| [201501145738](https://www.permitgraph.org/p/201501145738) | Jan 14, 2015 | Never finaled: issued Jan 2015, no final | [1950 Mission St](https://www.permitgraph.org/a/3554/005) | replace (e) bathroom, shower and laundry room fixtures. | $30,000 |
| [201412173902](https://www.permitgraph.org/p/201412173902) | Dec 17, 2014 | Completed: final sign-off Oct 2015 | [182 Jordan Av](https://www.permitgraph.org/a/1063/029) | recomencement and completion of work approved under pa# 9511194. |  |
| [201412173903](https://www.permitgraph.org/p/201412173903) | Dec 17, 2014 | Completed: final sign-off Oct 2015 | [182 Jordan Av](https://www.permitgraph.org/a/1063/029) | recomencement and completion of work approved under pa# 9307312. | $100,000 |
| [201410310390](https://www.permitgraph.org/p/201410310390) | Oct 31, 2014 | Never finaled: issued Oct 2014, no final | [1401 Polk St](https://www.permitgraph.org/a/0646/004) | submit title 24 for p.a.# 2012.1101.3355. |  |
| [201409105939](https://www.permitgraph.org/p/201409105939) | Sep 10, 2014 | Completed: final sign-off Oct 2014 | [4489 17th St](https://www.permitgraph.org/a/2654/036) | work @ unit# 3 only. remodel kitchen, replace cabinet, countertop, and floor tile. remodel bathroom, replace plumbing fixtures. | $8,000 |
| [201408224540](https://www.permitgraph.org/p/201408224540) | Aug 22, 2014 | Never finaled: issued Aug 2014, no final | [750 Kearny St](https://www.permitgraph.org/a/0208/024) | 5th flr: remodel (e) fitness center, remodel (e) sales office become spa treatment center, works include demolition, new walls, and ceiling, new cabinet, new ada bathroom, mepp and fire sprinkler, fi… | $100,000 |
| [201407292380](https://www.permitgraph.org/p/201407292380) | Jul 29, 2014 | Never finaled: issued Aug 2014, no final | [1401 Polk St](https://www.permitgraph.org/a/0646/004) | propose hvac system and kitchen hood and duct system to tenant improvement work under pa#201211013355 | $20,000 |
| [201407151354](https://www.permitgraph.org/p/201407151354) | Jul 15, 2014 | Never finaled: issued Aug 2014, no final | [5400 Geary Bl](https://www.permitgraph.org/a/1450/008) | install 8'-0" tall iron fence (temporary) and gate at main entrance to comply with planning dept. nov. #12744. | $2,000 |
| [201406108041](https://www.permitgraph.org/p/201406108041) | Jun 10, 2014 | Never finaled: issued Jul 2014, no final | [750 Kearny St](https://www.permitgraph.org/a/0208/024) | provide, mechanical, electrical layout for remodelling of (e) spa to change to new meeting rooms and office; ref pa 201312164313. | $10,000 |
| [201406067756](https://www.permitgraph.org/p/201406067756) | Jun 6, 2014 | Never finaled: issued Jun 2014, no final | [1143 Potrero Av](https://www.permitgraph.org/a/4212/017) | replace exterior stucco to repair leakage. the new stucco will be in kind, visible from street. | $4,000 |
| [201406067769](https://www.permitgraph.org/p/201406067769) | Jun 6, 2014 | Never finaled: issued Jun 2014, no final | [1149 Potrero Av](https://www.permitgraph.org/a/4212/018) | repalce exterior stucco in kind to repair leakage, visible from street. n/a maher ordinance 155-13 | $4,000 |
| [201403049786](https://www.permitgraph.org/p/201403049786) | Mar 4, 2014 | Never finaled: issued Mar 2014, no final | [112 07th St](https://www.permitgraph.org/a/3727/001) | provide details of structure for accomodate site condition. revision to pa# 201307010920. na compliance #155-13. | $4,000 |
| [201402057856](https://www.permitgraph.org/p/201402057856) | Feb 5, 2014 | Never finaled: issued Feb 2014, no final | [1253 Exposition Dr](https://www.permitgraph.org/a/1939/001) | unit c: remodel kitchen, replace cabinet, replace electrical outlets to gfi, replace kitchen sink, no layout change, patch 2/f gypsum wall board, painting; compliance with ord 155-13 not required | $7,500 |
| [201401287280](https://www.permitgraph.org/p/201401287280) | Jan 28, 2014 | Completed: final sign-off Feb 2015 | [1355 Market St](https://www.permitgraph.org/a/3508/001) | ground floor interior remodel to include select areas of demolition, general retail tenant improvement, new handicap accessible toilet room. exterior & mep work under separate permits. ** maher: comp… | $1,200,000 |
| [201401247069](https://www.permitgraph.org/p/201401247069) | Jan 24, 2014 | Never finaled: issued Jan 2014, no final | [884 North Point St](https://www.permitgraph.org/a/0025/024) | revision to app#201312194665. revise layout of bathroom and bedroom to reflect building condition. n/a for maher ordinance no. 155-13 |  |
| [201401236931](https://www.permitgraph.org/p/201401236931) | Jan 23, 2014 | Completed: final sign-off Mar 2015 | [1 Shrader St](https://www.permitgraph.org/a/1191/036) | #578, #510- correct code violation #nov# 200726836 dated 4/25/12 remodel office. | $10,000 |
| [201401065678](https://www.permitgraph.org/p/201401065678) | Jan 6, 2014 | Never finaled: issued Jan 2014, no final | [2550 Van Ness Av](https://www.permitgraph.org/a/0526/021) | work is done. to obtain final inspection for work approved under pa# 201110217343. |  |
| [201312164313](https://www.permitgraph.org/p/201312164313) | Dec 16, 2013 | Never finaled: issued Apr 2014, no final | [750 Kearny St](https://www.permitgraph.org/a/0208/024) | ground floor - demolish (e) spa area on ground floor. install (n) walls, ceilings, lighting and cabinetry. electrical, plumbing and sprinkler modifications will be performed under separate permits. *… | $290,000 |
| [201312124073](https://www.permitgraph.org/p/201312124073) | Dec 12, 2013 | Expired or cancelled: cancelled Nov 2016 | [101 Duboce Av](https://www.permitgraph.org/a/3533/001) | to comply planning complaint# 12745. revision to pa# 2012/08/28/8439. exterior revision for planning enforcement notification. |  |
| [201312124025](https://www.permitgraph.org/p/201312124025) | Dec 12, 2013 | Never finaled: issued May 2014, no final | [101 Duboce Av](https://www.permitgraph.org/a/3533/001) | to comply with planning complaint# 12745. to erect electric, projecting, double faced sign. | $5,000 |
| [201312124070](https://www.permitgraph.org/p/201312124070) | Dec 12, 2013 | Never finaled: issued May 2014, no final | [101 Duboce Av](https://www.permitgraph.org/a/3533/001) | to comply with planning complaint# 12745. 2 identical sign. to erect electric, wall, single faced sign. | $4,000 |
| [201312023093](https://www.permitgraph.org/p/201312023093) | Dec 2, 2013 | Completed: final sign-off Apr 2014 | [1806 38th Av](https://www.permitgraph.org/a/2074/049) | install 4 windows (aluminium wood clad double glazed as in kind to the original windows to abate notice of violations # 201331331. see reverse side for bedroom window requirements. | $3,000 |
| [201311262886](https://www.permitgraph.org/p/201311262886) | Nov 26, 2013 | Never finaled: issued Nov 2013, no final | [851 11th Ti St](https://www.permitgraph.org/a/1939/001) | emergency order to demo a one story warehouse property. | $10,000 |
| [201311222691](https://www.permitgraph.org/p/201311222691) | Nov 22, 2013 | Completed: final sign-off Feb 2014 | [1409 Sutter St](https://www.permitgraph.org/a/0689/016) | to establish a 10 room tourist hotel and full service restaurant as set forth in motion 19016 approved by the city planning commission on 11-7-2013 (case 2013.0361c). plans include reconfiguration of… | $200,000 |
| [201311071352](https://www.permitgraph.org/p/201311071352) | Nov 7, 2013 | Never finaled: issued Dec 2013, no final | [1115 Keppler Ct](https://www.permitgraph.org/a/1939/001) | restore facade siding, window and roof after fire damage. this permit is for weather protection of the building only and no interior work to be performed. | $25,000 |
| [201310290493](https://www.permitgraph.org/p/201310290493) | Oct 29, 2013 | Completed: final sign-off Mar 2014 | [2809 San Bruno Av](https://www.permitgraph.org/a/5457/030) | to convert extg retail space to state licensed medical massage therapy establishment. remove non load bearing wall, install, h c bathroom, shower room, therapy rooms. | $60,000 |
| [201310179504](https://www.permitgraph.org/p/201310179504) | Oct 17, 2013 | Never finaled: issued Oct 2013, no final | [1223 Mariner Dr](https://www.permitgraph.org/a/1939/001) | to provide additional roof truss detail to revised building pa#201309106434 - structural only. |  |
| [201309247566](https://www.permitgraph.org/p/201309247566) | Sep 24, 2013 | Never finaled: issued Sep 2013, no final | [2550 Van Ness Av](https://www.permitgraph.org/a/0526/021) | to obatin final inspection for work approved under pa#201110257543. all work is complete |  |
| [201309106434](https://www.permitgraph.org/p/201309106434) | Sep 10, 2013 | Completed: final sign-off Feb 2014 | [1223 Mariner Dr](https://www.permitgraph.org/a/1939/001) | reconstruct fire damaged unit c in-kind. repair fire damage for units b & d. remodel for units a, e & f. | $350,000 |
| [201309056072](https://www.permitgraph.org/p/201309056072) | Sep 5, 2013 | Completed: final sign-off Jun 2014 | [2620 Jones St](https://www.permitgraph.org/a/0029/003) | fitness center addition.2nd level guest room conversion to a club lounge at 3rd floor. sprinkler separate permit | $184,000 |
| [201306200059](https://www.permitgraph.org/p/201306200059) | Jun 20, 2013 | Never finaled: issued Jun 2013, no final | [1149 Potrero Av](https://www.permitgraph.org/a/4212/018) | replace dry rot siding in kind in rear | $2,000 |
| [201305308248](https://www.permitgraph.org/p/201305308248) | May 30, 2013 | Never finaled: issued May 2013, no final | [750 Kearny St](https://www.permitgraph.org/a/0208/024) | install partition wall & door for storage room on 3rd floor mezzanine plan. | $1,500 |
| [201305298038](https://www.permitgraph.org/p/201305298038) | May 29, 2013 | Completed: final sign-off Jun 2013 | [7 Lake Forest Ct](https://www.permitgraph.org/a/2675/028) | to comply with nov #201198667. remove porch enclosure at the rear of the bldg. | $1,000 |
| [201304305769](https://www.permitgraph.org/p/201304305769) | Apr 30, 2013 | Never finaled: issued Apr 2013, no final | [1327 Noriega St](https://www.permitgraph.org/a/2057/047) | modify and correction of plumbing fixtures to comply with nov. #201385578. install grease interceptor. | $4,000 |
| [201304265545](https://www.permitgraph.org/p/201304265545) | Apr 26, 2013 | Completed: final sign-off Apr 2014 | [2817 San Bruno Av](https://www.permitgraph.org/a/5457/029) | abate nov# 201238223-repair fire damage building | $70,000 |
| [201304053915](https://www.permitgraph.org/p/201304053915) | Apr 5, 2013 | Never finaled: issued Apr 2013, no final | [1409 Sutter St](https://www.permitgraph.org/a/0689/016) | replace steel beam in kitchen. replace a section of wall between dining room in basement with new steel beam. lower slab at front portion of existing basement within the dining room with raised curb… | $30,000 |
| [201304023564](https://www.permitgraph.org/p/201304023564) | Apr 2, 2013 | Completed: final sign-off Jun 2013 | [882 North Point St](https://www.permitgraph.org/a/0025/024) | revision to appl #2013.02.22.0777 - install type 1 hood at ground floor cafe. | $3,000 |
| [201304023584](https://www.permitgraph.org/p/201304023584) | Apr 2, 2013 | Completed: final sign-off Apr 2013 | [1810 Union St](https://www.permitgraph.org/a/0530/008) | to obtain final inspection for work approved under pa 201101218761, all work is completed. |  |
| [201303142245](https://www.permitgraph.org/p/201303142245) | Mar 14, 2013 | Completed: final sign-off Oct 2013 | [750 Kearny St](https://www.permitgraph.org/a/0208/024) | to comply with nov 201259521. convert 3rd fl bath to storage room. enlarge electrical closet at 5th fl | $5,000 |
| [201302220777](https://www.permitgraph.org/p/201302220777) | Feb 22, 2013 | Completed: final sign-off Jun 2013 | [882 North Point St](https://www.permitgraph.org/a/0025/024) | install range at ground floor cafe,install interior deck (45 sf). mep & hood under separate permit per plan. | $10,000 |
| [201301299034](https://www.permitgraph.org/p/201301299034) | Jan 29, 2013 | Completed: final sign-off Feb 2014 | [1409 Sutter St](https://www.permitgraph.org/a/0689/016) | renovate (e) kitchen & dining rooms. provide lodging for (e) private club change of use to r-1 occupancy. upgrade exist ground level bathrms to accessible. provide upgraded rescue windows to comply w… | $350,000 |
| [201212136133](https://www.permitgraph.org/p/201212136133) | Dec 13, 2012 | Never finaled: issued Jan 2013, no final | [101 Duboce Av](https://www.permitgraph.org/a/3533/001) | revision to pa#2012-0724-5570. foundation walls to be shotcrete. special inspection on item#12 |  |
| [201212065648](https://www.permitgraph.org/p/201212065648) | Dec 6, 2012 | Never finaled: issued Dec 2012, no final | [165 Jefferson St](https://www.permitgraph.org/a/0013/006A) | install new marquee at front of building. install new storefront at front of building. refer to ti pa# 2012-1102-3470 | $20,000 |
| [201212065645](https://www.permitgraph.org/p/201212065645) | Dec 6, 2012 | Never finaled: issued Dec 2012, no final | [165 Jefferson St](https://www.permitgraph.org/a/0013/006A) | erect a non electric single faced marquee new sign | $1,000 |
| [201211214735](https://www.permitgraph.org/p/201211214735) | Nov 21, 2012 | Never finaled: issued Nov 2012, no final | [634 45th Av](https://www.permitgraph.org/a/1587/032) | secure doors and windows with plywood, alteration permit will be under peperate permit. | $2,000 |
| [201211023470](https://www.permitgraph.org/p/201211023470) | Nov 2, 2012 | Completed: final sign-off Feb 2013 | [165 Jefferson St](https://www.permitgraph.org/a/0013/006A) | change of use. convert existing retail (m) to bar (a-2). install new non load bearing partitons, accessible mens and womens bathrooms, storage area and counters. storefront on separate permit. sffd p… | $350,000 |
| [201211013357](https://www.permitgraph.org/p/201211013357) | Nov 1, 2012 | Never finaled: issued Nov 2012, no final | [165 Jefferson St](https://www.permitgraph.org/a/0013/006A) | remove interior finishes, shelving prepare for future tenant improvement. no demolition. | $2,000 |
| [201211013355](https://www.permitgraph.org/p/201211013355) | Nov 1, 2012 | Completed: final sign-off Nov 2014 | [1401 Polk St](https://www.permitgraph.org/a/0646/004) | change of use per planning #2000297. new kichen, handicap bathroom, counter, walkin cooler, equipment hookup. | $150,000 |
| [201208288377](https://www.permitgraph.org/p/201208288377) | Aug 28, 2012 | Never finaled: issued Sep 2012, no final | [101 Duboce Av](https://www.permitgraph.org/a/3533/001) | remodel (e) liquor store w/ground floor lightwell infill. remodel (e) 5 residential units, remove 2nd stair, upgrade to type 5a construction. partial voluntary seismic strengthening. bldg to be fully… | $1,000,000 |
| [201208288439](https://www.permitgraph.org/p/201208288439) | Aug 28, 2012 | Completed: final sign-off Aug 2014 | [101 Duboce Av](https://www.permitgraph.org/a/3533/001) | 4th floor vertical addition of 2 dwelling units. | $250,000 |
| [201207245570](https://www.permitgraph.org/p/201207245570) | Jul 24, 2012 | Never finaled: issued Aug 2012, no final | [101 Duboce Av](https://www.permitgraph.org/a/3533/001) | comply w/nov #201225163 - remove all debris, repair fiew damaged bldg. shore existing floors + walls as required by inspector. shore (e) foundation w/new concrete beams, walls + footings. | $150,000 |
| [201206011664](https://www.permitgraph.org/p/201206011664) | Jun 1, 2012 | Completed: final sign-off Jan 2014 | [100 Van Ness Av](https://www.permitgraph.org/a/0814/020) | abate complaint no. 201227241. exploratory demolition on levels 3,5,7,11,13,17,20,22,24,25, and 28. | $10,000 |
| [201205049824](https://www.permitgraph.org/p/201205049824) | May 4, 2012 | Never finaled: issued Jun 2012, no final | [491 Post St](https://www.permitgraph.org/a/0307/009) | no work to be done under this permit. establish occupancy load for assembly occupancy only |  |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.