Permit GraphShortlistSan Francisco building permits since 2000

Urbnbuild Inc

Contractor license
1047320
State license record
Based in
San Francisco
On San Francisco permits
Oct 2014 to May 2026
Last 24 months
6 permits filed

26 permits since 2000: 19 completed, 3 in progress, 4 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Deck permits

AllRoof deck 4Deck 3Stairs 4Kitchen remodel 5Bathroom remodel 7

3 deck permits: 2 completed, 1 in progress. Typically 534 days from filing to permit and 672 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Mar 18, 2025In progress
issued Jul 2025
206 Andover Stremodel (e) sfh.foundation replacement & ground floor main bedroom, bath, & closet remodel, reclaiming (e) garage space. (n) interior stair locatin & kitchen remodel. (n) millwork and interior finishes and fixtures throuhgout (n) fiber cement siding, (n) windows and doors, reduce rear deck size
Details
Permit
202503182437
Status
issued
Filed
Mar 18, 2025
Permit issued
Jul 24, 2025
Declared cost
$1,000,000
Address
206 Andover St

remodel (e) sfh.foundation replacement & ground floor main bedroom, bath, & closet remodel, reclaiming (e) garage space. (n) interior stair locatin & kitchen remodel. (n) millwork and interior finishes and fixtures throuhgout (n) fiber cement siding, (n) windows and doors, reduce rear deck size

Open the permit page

$1,000,000
Oct 12, 2021Completed
final sign-off Sep 2025
226 Palo Alto Avadd a horizontal addition to the rear yard which will be within the current foot print of the existing deck. the proposal will be 15" from the rear property line-same distance as teh existing deck
Details
Permit
202110120268
Status
complete
Filed
Oct 12, 2021
Permit issued
Mar 30, 2023
Final sign-off
Sep 24, 2025
Declared cost
$450,000
Address
226 Palo Alto Av

add a horizontal addition to the rear yard which will be within the current foot print of the existing deck. the proposal will be 15" from the rear property line-same distance as teh existing deck

Open the permit page

$450,000
Aug 20, 2020Completed
final sign-off Sep 2023
4315 21st Stremodel and addition to an (e) single family home. remodel 1st floor interior. replace (e) rear lower sloped roof with (n) flat roof. replace(e) rear at grade deck with(n) deck. remodel 2nd floor bathrooms. replace (e) windows and doors in kind. replace select (e) windows and doors with (n) windows.
Details
Permit
202008202259
Status
complete
Filed
Aug 20, 2020
Permit issued
Jul 11, 2022
Final sign-off
Sep 18, 2023
Declared cost
$255,000
Address
4315 21st St

remodel and addition to an (e) single family home. remodel 1st floor interior. replace (e) rear lower sloped roof with (n) flat roof. replace(e) rear at grade deck with(n) deck. remodel 2nd floor bathrooms. replace (e) windows and doors in kind. replace select (e) windows and doors with (n) windows.

Open the permit page

$255,000