Back to bathroom remodel contractors
Upscale Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to Jul 2026
- Last 24 months
- 16 permits filed
442 permits since 2000: 358 completed, 9 in progress, 39 never finaled, 36 expired or cancelled.
Of the 39 never-finaled permits, 6 are 3 to 5 years old, 13 are 5 to 10 years old, 20 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
121 bathroom remodel permits: 106 completed, 1 in progress, 6 never finaled, 8 expired or cancelled. Typically 0 days from filing to permit and 256 days from permit to final inspection.
Showing the 100 most recent of 121.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 22, 2026 | In progress issued Aug 2026 | 2780 Vallejo St | interior remodel levels 1-3, including new elevator and shaft. remove (e) elevator/shaft and infill . level 1: guest bathroom and laundry remodel. level 2: kitchen, powder room and vestibule remodel. level 3: new gas firplace, 2 bathroom remodel, 2 bedroom remodel. replace front stairs in kind.Details
interior remodel levels 1-3, including new elevator and shaft. remove (e) elevator/shaft and infill . level 1: guest bathroom and laundry remodel. level 2: kitchen, powder room and vestibule remodel. level 3: new gas firplace, 2 bathroom remodel, 2 bedroom remodel. replace front stairs in kind. | $1,375,000 |
| Jan 29, 2025 | Completed final sign-off Oct 2025 | 3876 Clay St | kitchen and bath remodel. all new finishes are replaced in kind. no structural work. no moving walls. all fixtures to remain in the same location. bathroom remodel located on the second floor.Details
kitchen and bath remodel. all new finishes are replaced in kind. no structural work. no moving walls. all fixtures to remain in the same location. bathroom remodel located on the second floor. | $250,000 |
| Dec 5, 2024 | Completed final sign-off Sep 2025 | 75 West Clay St | repair and replace finishes in the media room, lower bath, pantry, kitchen & primary bath in kind. install (n) heat pump hvac heat system for media room and office. no structural work is needed.Details
repair and replace finishes in the media room, lower bath, pantry, kitchen & primary bath in kind. install (n) heat pump hvac heat system for media room and office. no structural work is needed. | $50,000 |
| Sep 19, 2024 | Expired or cancelled cancelled Nov 2025 | 2821 Steiner St | repair and replace all interior finishes due to water damage. work includes refurbishing 3 existing bathrooms and kitchen- new drywall throughout, paint, and flooring throughout. remediation report to be at site for review by field inspector.Details
repair and replace all interior finishes due to water damage. work includes refurbishing 3 existing bathrooms and kitchen- new drywall throughout, paint, and flooring throughout. remediation report to be at site for review by field inspector. | $250,000 |
| Apr 4, 2024 | Completed final sign-off Oct 2025 | 3075 Pacific Av | interior remodel of primary bathroom: primary closet, guest bath, guest bed closet, powder room, partial kitchen cabinet replacement and replacing rear windows and doors in existing locations.all work is replace in kind in existing locations.Details
interior remodel of primary bathroom: primary closet, guest bath, guest bed closet, powder room, partial kitchen cabinet replacement and replacing rear windows and doors in existing locations.all work is replace in kind in existing locations. | $400,000 |
| Nov 13, 2023 | Completed final sign-off May 2025 | 2266 Vallejo St | remodel unit 4 kitchen on level 3. new appliances, cabinets, counters, lighting, and electrical. new direct vent fireplaces at level 3 and 4 in exising fireplace locations. change tub to shower in unit 4 hall bath. existing plumbing fixtures to remain. remodel primary bath, new tile and vanities.Details
remodel unit 4 kitchen on level 3. new appliances, cabinets, counters, lighting, and electrical. new direct vent fireplaces at level 3 and 4 in exising fireplace locations. change tub to shower in unit 4 hall bath. existing plumbing fixtures to remain. remodel primary bath, new tile and vanities. | $45,000 |
| Sep 5, 2023 | Completed final sign-off Oct 2024 | 3410 Jackson St | 2nd/f: (n) cabinetry & fixtures at kitchem, pantry & bar. 3rd/f: primary bath, primary bedroom & (n) minisplits @ 4th/f. new gate at 1st entry to replace (e), repaint exterior facade, replace window at primary bath. no work affect public rowDetails
2nd/f: (n) cabinetry & fixtures at kitchem, pantry & bar. 3rd/f: primary bath, primary bedroom & (n) minisplits @ 4th/f. new gate at 1st entry to replace (e), repaint exterior facade, replace window at primary bath. no work affect public row | $200,000 |
| Jul 19, 2023 | Completed final sign-off Mar 2024 | 1960 Broadway | unit 10: interior remodel-includes 10th fl bathroom, 11th fl bathroom, unit-only elevator removal and interior refinishing.Details
unit 10: interior remodel-includes 10th fl bathroom, 11th fl bathroom, unit-only elevator removal and interior refinishing. | $300,000 |
| Dec 6, 2022 | Completed final sign-off Dec 2023 | 3664 22nd St | remodel penthouse bathroom. removal of e fireplace and expansion closet. penthouse flrs updated to n hardwood flrs. e penthouse window,door & front siding at balcony to be replaced due to water damage. addition of n sauna at 1st flr patio. e slider & e window at 1st flr replaced. deck & stair updateDetails
remodel penthouse bathroom. removal of e fireplace and expansion closet. penthouse flrs updated to n hardwood flrs. e penthouse window,door & front siding at balcony to be replaced due to water damage. addition of n sauna at 1st flr patio. e slider & e window at 1st flr replaced. deck & stair update | $150,000 |
| Oct 27, 2022 | Completed final sign-off Oct 2023 | 470 Beacon St | partial remodel, 3/f & 4/f, remodel of kitchen, guest bedroom, bathroom, replace windows/doors, new flooring throughout, improvements to fire place & living room terraceDetails
partial remodel, 3/f & 4/f, remodel of kitchen, guest bedroom, bathroom, replace windows/doors, new flooring throughout, improvements to fire place & living room terrace | $150,000 |
| Jan 10, 2022 | Completed final sign-off Mar 2025 | 1230 Kearny St | bathroom and kitchen remodel. replace plumbing fixtures. new kitchen appliances; new flooring; new led in kind. no structural changes. (3) bathrooms & (1) kitchen.Details
bathroom and kitchen remodel. replace plumbing fixtures. new kitchen appliances; new flooring; new led in kind. no structural changes. (3) bathrooms & (1) kitchen. | $100,000 |
| Nov 4, 2020 | Completed final sign-off Jul 2022 | 2661 Broadway | replace plumbing fixtures in 6 bathrooms, new appliances at offices millwork, refinish (e) wood floors, new lighting at bathroom mirrors.Details
replace plumbing fixtures in 6 bathrooms, new appliances at offices millwork, refinish (e) wood floors, new lighting at bathroom mirrors. | $100,000 |
| Oct 7, 2020 | Completed final sign-off Aug 2021 | 2200 Pacific Av | revision to pa #201910235398 - no revisions to previously approved windows. new toilet fixtures and finishes in four bathrooms, replacement kitchen cabinets and new appliances, replacement exterior windows title 24 compliant, replacement convenience stair, and new title 24 compliant lightingDetails
revision to pa #201910235398 - no revisions to previously approved windows. new toilet fixtures and finishes in four bathrooms, replacement kitchen cabinets and new appliances, replacement exterior windows title 24 compliant, replacement convenience stair, and new title 24 compliant lighting | $250,000 |
| Mar 10, 2020 | Completed final sign-off Jan 2021 | 3664 22nd St | scope of work includes an interior remodel of kitchen and kid's bathrooms (302 & 307) and putting new finished floor throughout the second floor.Details
scope of work includes an interior remodel of kitchen and kid's bathrooms (302 & 307) and putting new finished floor throughout the second floor. | $1,050,000 |
| Oct 23, 2019 | Completed final sign-off Aug 2021 | 2200 Pacific Av | unit #11a: demo/mold & abatement, upgrade electrical panel, remodel kitchen and (3) bathrooms in kind. refurbish stairs in unit, window replacement w/ title 24 compliant, new floor coverings throughout. test for hazardous material and removal "mold" will be done by licensed moldDetails
unit #11a: demo/mold & abatement, upgrade electrical panel, remodel kitchen and (3) bathrooms in kind. refurbish stairs in unit, window replacement w/ title 24 compliant, new floor coverings throughout. test for hazardous material and removal "mold" will be done by licensed mold | $250,000 |
| Oct 10, 2019 | Completed final sign-off Nov 2021 | 3035 Pacific Av | interior remodel at basement, 1st, and 2nd floors. work includes interior excavation to expand storage room, relocate a bath and laundry room, new stairs to basement, new fire place on 1st floor. new skylight, nw fixtures & nw finishes throughout.Details
interior remodel at basement, 1st, and 2nd floors. work includes interior excavation to expand storage room, relocate a bath and laundry room, new stairs to basement, new fire place on 1st floor. new skylight, nw fixtures & nw finishes throughout. | $350,000 |
| Jul 16, 2019 | Completed final sign-off Oct 2023 | 3500 Jackson St | remodel garage. 1st thru 4th floors of existing single family residence. work includes relocation of bathrooms, laundry rooms. addition of bathrooms and bedrooms.**maher n/a**Details
remodel garage. 1st thru 4th floors of existing single family residence. work includes relocation of bathrooms, laundry rooms. addition of bathrooms and bedrooms.**maher n/a** | $1,000,000 |
| Jul 9, 2019 | Completed final sign-off Sep 2020 | 1722 Great Hy | kitchen & bath remodel in each unit, add 2 bathroom, full window replacement, new doors at rear ground level, new level 2 rear deck, stair to grade, 3 new skylightsDetails
kitchen & bath remodel in each unit, add 2 bathroom, full window replacement, new doors at rear ground level, new level 2 rear deck, stair to grade, 3 new skylights | $50,000 |
| Feb 12, 2019 | Completed final sign-off Mar 2022 | 2260 Washington St | remove and replace all floors (hardwood), remodel (e) powder rm 18sq. ft, remove finisher, replace in kind. remodel 2nd floor-bathroom (60 sq ft) replace in kind. remodel (e) pantry , remodel (e) master closet, remove and replace cabinetry in kind. no structural work. plumbing and replace fixturesDetails
remove and replace all floors (hardwood), remodel (e) powder rm 18sq. ft, remove finisher, replace in kind. remodel 2nd floor-bathroom (60 sq ft) replace in kind. remodel (e) pantry , remodel (e) master closet, remove and replace cabinetry in kind. no structural work. plumbing and replace fixtures | $42,000 |
| Oct 12, 2018 | Completed final sign-off Jan 2022 | 34 Maple St | remodel kitchen, 2 powder rooms, 7 bathrooms, 1 laundry, no structural work or removal of walls. -replace hardword flooring throughtout the house, . not structural wood, . replace all smoke/co detectors.Details
remodel kitchen, 2 powder rooms, 7 bathrooms, 1 laundry, no structural work or removal of walls. -replace hardword flooring throughtout the house, . not structural wood, . replace all smoke/co detectors. | $150,000 |
| Oct 11, 2018 | Completed final sign-off Jan 2019 | 2725 Jackson St | eliminate shower and sink and replace with built-in cabinetry in existing bathroom for more closet space. no wall removal on 3rd floor.Details
eliminate shower and sink and replace with built-in cabinetry in existing bathroom for more closet space. no wall removal on 3rd floor. | $5,000 |
| Sep 12, 2018 | Completed final sign-off Jan 2019 | 3455 Pierce St | unit #204: kitchen and bathroom remodel. demo & replace in kind. w/o structural workDetails
unit #204: kitchen and bathroom remodel. demo & replace in kind. w/o structural work | $30,000 |
| Feb 15, 2018 | Completed final sign-off Sep 2018 | 2673 Clay St | revision to 2015.1015.9861 relocate lower bath, laundry & mech room. expand gym & master bedroom. reconfigure mastr. bed windows 7 closets @ bedrooms 1,2,3. revise foundation & shoring details.Details
revision to 2015.1015.9861 relocate lower bath, laundry & mech room. expand gym & master bedroom. reconfigure mastr. bed windows 7 closets @ bedrooms 1,2,3. revise foundation & shoring details. | |
| Feb 2, 2018 | Never finaled issued Feb 2018, no final | 2649 Green St | remodel 1 bathroom to comply with all current codes ; no structural .Details
remodel 1 bathroom to comply with all current codes ; no structural . | $15,000 |
| Dec 27, 2017 | Completed final sign-off Apr 2018 | 3445 Pierce St | apt 305: kitchen & bathroom remodel - no structural - redo finishes.Details
apt 305: kitchen & bathroom remodel - no structural - redo finishes. | $40,000 |
| Dec 27, 2017 | Completed final sign-off May 2018 | 290 Alhambra St | apt 9: kitchen & bathroom remodel; no structural work. redo finishes.Details
apt 9: kitchen & bathroom remodel; no structural work. redo finishes. | $40,000 |
| Nov 7, 2017 | Completed final sign-off Apr 2018 | 3455 Pierce St | apt 202: kitchen & bathroom remodel, no structural work. redo finishes. no layout changes.Details
apt 202: kitchen & bathroom remodel, no structural work. redo finishes. no layout changes. | $40,000 |
| Nov 7, 2017 | Completed final sign-off May 2018 | 2290 Francisco St | apt 101: kitchen & bathroom remodel, no structural work. redo finishes. no layout changes.Details
apt 101: kitchen & bathroom remodel, no structural work. redo finishes. no layout changes. | $40,000 |
| Sep 21, 2017 | Completed final sign-off Jan 2018 | 3455 Pierce St | unit #003: kitchen and bathroom remodel. remove and replace finishes in kind. no structural workDetails
unit #003: kitchen and bathroom remodel. remove and replace finishes in kind. no structural work | $40,000 |
| Aug 11, 2017 | Completed final sign-off Jan 2019 | 201 Locust St | demo & remodel kitchen & 3 baths . no interior walls to be removed.Details
demo & remodel kitchen & 3 baths . no interior walls to be removed. | $20,000 |
| Jul 6, 2017 | Completed final sign-off Oct 2023 | 2500 Broadway | 2/f: bathroom remodel replace in-kind, new shower pan, toilet, & fixtures.Details
2/f: bathroom remodel replace in-kind, new shower pan, toilet, & fixtures. | $50,000 |
| Jun 9, 2017 | Never finaled issued Jun 2017, no final | 2700 Broadway | kitchen and bathroom remodel - total of 6 baths, no structural work or changes to the exterior of building. minor remodel of laundry-utility. add work: verify smoke detectors inside and out of bedrooms. replace any as needed. n/a maherDetails
kitchen and bathroom remodel - total of 6 baths, no structural work or changes to the exterior of building. minor remodel of laundry-utility. add work: verify smoke detectors inside and out of bedrooms. replace any as needed. n/a maher | $175,000 |
| Apr 6, 2017 | Completed final sign-off Dec 2017 | 2205 Scott St | interior remodel, remodel kitchen & powder room @ 2nd floor. remodel bathrooms @ 3rd floor. replace in-kind. no structural alterations.Details
interior remodel, remodel kitchen & powder room @ 2nd floor. remodel bathrooms @ 3rd floor. replace in-kind. no structural alterations. | $300,000 |
| Mar 20, 2017 | Completed final sign-off Nov 2017 | 3330 Pierce St | unit#107 kitchen & bathroom remodel & replace finishes down to studs. no structural work. no walls moved, removed, added or infilled. all (e) layouts to remain unchanged. n/a for maher.Details
unit#107 kitchen & bathroom remodel & replace finishes down to studs. no structural work. no walls moved, removed, added or infilled. all (e) layouts to remain unchanged. n/a for maher. | $30,000 |
| Mar 20, 2017 | Completed final sign-off Sep 2017 | 3455 Pierce St | unit#102 kitchen & bathroom remodel. no structural work. no walls moved, removed, added or infilled. all (e) layouts to remain unchanged. n/a for maher.Details
unit#102 kitchen & bathroom remodel. no structural work. no walls moved, removed, added or infilled. all (e) layouts to remain unchanged. n/a for maher. | $30,000 |
| Dec 2, 2016 | Completed final sign-off Aug 2017 | 3445 Pierce St | #204: kitchen + 1 bath - remove and replace in kind. no structural work.n/a maherDetails
#204: kitchen + 1 bath - remove and replace in kind. no structural work.n/a maher | $30,000 |
| Dec 2, 2016 | Completed final sign-off Aug 2017 | 3455 Pierce St | #302: kitchen + 1 bath - remove and replace in kind. no structural work.n/a maherDetails
#302: kitchen + 1 bath - remove and replace in kind. no structural work.n/a maher | $30,000 |
| Oct 19, 2016 | Completed final sign-off Aug 2017 | 3455 Pierce St | unit #104: kitchen and bath - remove and replace finishes in kind. no structural work. n/a maher ord. 155-13Details
unit #104: kitchen and bath - remove and replace finishes in kind. no structural work. n/a maher ord. 155-13 | $30,000 |
| Oct 19, 2016 | Completed final sign-off Aug 2017 | 3455 Pierce St | unit # 105: kitchen and bath - remove and replace finishes in kind. no structural work. n/a maher ord. 155-13Details
unit # 105: kitchen and bath - remove and replace finishes in kind. no structural work. n/a maher ord. 155-13 | $30,000 |
| Aug 25, 2016 | Completed final sign-off Dec 2016 | 2290 Francisco St | unit #105: kitchen and bath - remove and replace finishes, in kind. no structural work. no wall modification.Details
unit #105: kitchen and bath - remove and replace finishes, in kind. no structural work. no wall modification. | $30,000 |
| Jun 16, 2016 | Completed final sign-off May 2017 | 3370 Washington St | bathroom remodel - no alterations/moving of walls. dry rot repair.Details
bathroom remodel - no alterations/moving of walls. dry rot repair. | $20,000 |
| Mar 15, 2016 | Completed final sign-off Jun 2016 | 2260 Washington St | second floor guest bathroom. replace finishes. n/a for maher.Details
second floor guest bathroom. replace finishes. n/a for maher. | $15,000 |
| Feb 19, 2016 | Completed final sign-off May 2016 | 3455 Pierce St | unit #304: kitchen and bath: remove and replace finishes in kind. no structural work.Details
unit #304: kitchen and bath: remove and replace finishes in kind. no structural work. | $40,000 |
| Oct 30, 2015 | Completed final sign-off Mar 2017 | 200 Brannan St | #436 - interior - kitchen & bath remodel of existing condominium. n/a maher ordinanceDetails
#436 - interior - kitchen & bath remodel of existing condominium. n/a maher ordinance | $185,000 |
| Aug 25, 2015 | Completed final sign-off Sep 2018 | 385 Santa Clara Av | horizontal addition to residence, remodel of (e) residence w/ kitchen & baths. excavate full extent of basement. lot merger under separate permit. removal of detached garage.Details
horizontal addition to residence, remodel of (e) residence w/ kitchen & baths. excavate full extent of basement. lot merger under separate permit. removal of detached garage. | $1,502,350 |
| Jun 4, 2015 | Completed final sign-off Nov 2016 | 2744 Steiner St | 2 bathroom remodel in kind ; to comply with cec150.0(k)5Details
2 bathroom remodel in kind ; to comply with cec150.0(k)5 | $20,000 |
| May 28, 2015 | Completed final sign-off May 2016 | 1320 Taylor St | convert storage to new meditation room. add laundry and 1/2 bath to exiting ground fl room. new electrical and plumbinb. sprinklers under separate permit lights low efficacyDetails
convert storage to new meditation room. add laundry and 1/2 bath to exiting ground fl room. new electrical and plumbinb. sprinklers under separate permit lights low efficacy | $83,000 |
| May 22, 2015 | Completed final sign-off Oct 2021 | 3725 Washington St | vertical & horizontal addition @ 2nd & 3rd floor in front. add 3 new dormers. structural work. interior remodel within (e) building. 4 bedroom, 6 bathrooms, 2 powder rooms.Details
vertical & horizontal addition @ 2nd & 3rd floor in front. add 3 new dormers. structural work. interior remodel within (e) building. 4 bedroom, 6 bathrooms, 2 powder rooms. | $850,000 |
| May 19, 2015 | Completed final sign-off Sep 2015 | 1961 Green St | 3rd flr and roof light well infill, 3rd flr interior remodel, including bedrooms, bathrooms & closets, 3rd flr bay window addition @ bathroom; maher n/aDetails
3rd flr and roof light well infill, 3rd flr interior remodel, including bedrooms, bathrooms & closets, 3rd flr bay window addition @ bathroom; maher n/a | $40,000 |
| Feb 5, 2015 | Completed final sign-off May 2015 | 470 Lombard St | kitchen remodel, replace existing finishes, new kitchen cabinets, move plumbing fixutre and add new light and plugs to be title 24 compliant. complete bathroom, remodel, remove all finishes and install new shower and vanity, new fixtures and upgrade electrical.Details
kitchen remodel, replace existing finishes, new kitchen cabinets, move plumbing fixutre and add new light and plugs to be title 24 compliant. complete bathroom, remodel, remove all finishes and install new shower and vanity, new fixtures and upgrade electrical. | $25,000 |
| Dec 8, 2014 | Completed final sign-off Jul 2015 | 3456 Baker St | interior drywall in master bath & master bedroom, removal & removal of master bath finishes. no work to interior partition walls/no work to structural elements.Details
interior drywall in master bath & master bedroom, removal & removal of master bath finishes. no work to interior partition walls/no work to structural elements. | $10,000 |
| Sep 5, 2014 | Completed final sign-off May 2017 | 185 Belgrave Av | kitchen & bathroom remodel. no exterior work. no structural work under this permit. all other work under appln #201309197260.Details
kitchen & bathroom remodel. no exterior work. no structural work under this permit. all other work under appln #201309197260. | $25,000 |
| Sep 4, 2014 | Never finaled issued Sep 2014, no final | 2310 Buchanan St | bathroom remodel - no new loads, taking out existing tub/shower. install new shower, countertops, sink & vanity. no change on walls. n/a maher ordinanceDetails
bathroom remodel - no new loads, taking out existing tub/shower. install new shower, countertops, sink & vanity. no change on walls. n/a maher ordinance | $3,000 |
| Jul 29, 2014 | Completed final sign-off Dec 2014 | 2229 Divisadero St | rev. to pa#201211134043- remodel 1 bathroom which is not included in the previous permit.Details
rev. to pa#201211134043- remodel 1 bathroom which is not included in the previous permit. | $2,000 |
| Jul 15, 2014 | Completed final sign-off Dec 2015 | 3712 Jackson St | interior remodel of existing bathrooms, closets, & new stair. add new bathroom on 2nd floor, miscellaneous replacement of existing windows & door. n/a maher ordinance. no expansion of building envelope. no work at front facade. exterior work at rear. provide automatic sprinkler systems at 2nd floor.Details
interior remodel of existing bathrooms, closets, & new stair. add new bathroom on 2nd floor, miscellaneous replacement of existing windows & door. n/a maher ordinance. no expansion of building envelope. no work at front facade. exterior work at rear. provide automatic sprinkler systems at 2nd floor. | $120,000 |
| Jun 30, 2014 | Completed final sign-off Oct 2016 | 36 Jordan Av | horizontal addition at basement,1st & 2nd fl rear southeast corner partial excavation of (e) basement to create legal head height, new rear deck 3' max above grade, partial interior remodel of kitchen, powder rm & basement bath, replace (e) windows in kind.Details
horizontal addition at basement,1st & 2nd fl rear southeast corner partial excavation of (e) basement to create legal head height, new rear deck 3' max above grade, partial interior remodel of kitchen, powder rm & basement bath, replace (e) windows in kind. | $350,000 |
| Mar 20, 2014 | Completed final sign-off Nov 2014 | 2257 Green St | interior kitchen and bath remodel. replace kitchen windows at rear of bldg in same location.Details
interior kitchen and bath remodel. replace kitchen windows at rear of bldg in same location. | $100,000 |
| Dec 4, 2013 | Completed final sign-off Mar 2015 | 2505 Pacific Av | install four (n) 45 min fire rated windows on east side, & one (n) operable skylight in master bathroom. no other workDetails
install four (n) 45 min fire rated windows on east side, & one (n) operable skylight in master bathroom. no other work | $20,000 |
| Nov 13, 2013 | Completed final sign-off Oct 2015 | 326 Spruce St | remodel e attic at 3/f include(n)stair to attic @bed level, remodel hall bath, new linen closet @ hall remove(e) fire box @bedrm @ entry, living rm widening of openings@ living rm & dining rms remove (e) fireplace chimney@kitchen add island, new dormersDetails
remodel e attic at 3/f include(n)stair to attic @bed level, remodel hall bath, new linen closet @ hall remove(e) fire box @bedrm @ entry, living rm widening of openings@ living rm & dining rms remove (e) fireplace chimney@kitchen add island, new dormers | $325,000 |
| Oct 1, 2013 | Completed final sign-off Sep 2014 | 85 Jordan Av | rear carriage house: replace stairs to code, new windows to rear and partition a storage space.bathroom remodel.Details
rear carriage house: replace stairs to code, new windows to rear and partition a storage space.bathroom remodel. | $30,000 |
| Jun 4, 2013 | Completed final sign-off Mar 2015 | 2505 Pacific Av | exterior renovation(paint+repair of existing). voluntary foundation strengthening. remodel of existing kitchen and bathrooms. installation of new elevator. modification of rear bay+removeal of basement+3rd floor kitchen.Details
exterior renovation(paint+repair of existing). voluntary foundation strengthening. remodel of existing kitchen and bathrooms. installation of new elevator. modification of rear bay+removeal of basement+3rd floor kitchen. | $965,000 |
| Jul 18, 2012 | Completed final sign-off Apr 2013 | 2332 Washington St | minimal structural upgrades, main level & 2nd floor renovations. kitchen and bathroom remodel.Details
minimal structural upgrades, main level & 2nd floor renovations. kitchen and bathroom remodel. | $180,000 |
| Jul 11, 2012 | Completed final sign-off May 2016 | 3636 Washington St | interior remodel of a guest suite & bathroom, additon of one bathroom, one sleeping room & mud room on the ground floor (lower level).Details
interior remodel of a guest suite & bathroom, additon of one bathroom, one sleeping room & mud room on the ground floor (lower level). | $40,000 |
| Jul 10, 2012 | Completed final sign-off Jun 2016 | 3636 Washington St | interior remodel of two bathrooms, laundry, addition of one bathroom at the third floor.Details
interior remodel of two bathrooms, laundry, addition of one bathroom at the third floor. | $700,000 |
| Apr 17, 2012 | Completed final sign-off May 2013 | 3636 Washington St | lighting to comply with cec150(k), exterior paint, kitchen & 3 bathrooms replace in kind.Details
lighting to comply with cec150(k), exterior paint, kitchen & 3 bathrooms replace in kind. | $125,000 |
| Feb 24, 2012 | Completed final sign-off Apr 2014 | 2732 Vallejo St | interior remodel: basement laundry room, basement bathroom and lowering of basement slab on grade. remodel 1st fl bath, demo stair and au pair room. remodel 2nd floor kitchen, family room, entry gallery. remodel 3rd fl master suite bath. remodel 4th fl bath. replace windows/ext doors,removeDetails
interior remodel: basement laundry room, basement bathroom and lowering of basement slab on grade. remodel 1st fl bath, demo stair and au pair room. remodel 2nd floor kitchen, family room, entry gallery. remodel 3rd fl master suite bath. remodel 4th fl bath. replace windows/ext doors,remove | $648,400 |
| Jan 4, 2012 | Completed final sign-off Apr 2012 | 2625 Lyon St | remodel of 1 kitchen and bath, remove all finishes in kitchen to the studs, repl in kind with new cabinets/counters/re-use appliances/refinish hardwood floros, 1 bathrm remove shower tile, floor tile, vanity and toilet, re-tile and reinstall toilet and vanity, new paint, no structural work, lightingDetails
remodel of 1 kitchen and bath, remove all finishes in kitchen to the studs, repl in kind with new cabinets/counters/re-use appliances/refinish hardwood floros, 1 bathrm remove shower tile, floor tile, vanity and toilet, re-tile and reinstall toilet and vanity, new paint, no structural work, lighting | $38,000 |
| Jan 3, 2012 | Completed final sign-off Nov 2012 | 1291 05th Av | interior remodel within extg bldg envelope. 1st floor: renovate extg storage laundry and mch space. add bathroom. 2nd floor:relocate extg power room in place. kitchen remodel. 3rd floor: in place master bathroom and closet remodel.Details
interior remodel within extg bldg envelope. 1st floor: renovate extg storage laundry and mch space. add bathroom. 2nd floor:relocate extg power room in place. kitchen remodel. 3rd floor: in place master bathroom and closet remodel. | $275,000 |
| Dec 21, 2011 | Completed final sign-off Nov 2013 | 2848 Union St | revision to appl #201108081940 & 201107150355: new shed at rear, modification of basement bath & laundry plans, install heaters @ deck & patio, lighting & fans in basement. modification to stair support at rear exterior stairDetails
revision to appl #201108081940 & 201107150355: new shed at rear, modification of basement bath & laundry plans, install heaters @ deck & patio, lighting & fans in basement. modification to stair support at rear exterior stair | $5,000 |
| Dec 12, 2011 | Completed final sign-off Nov 2015 | 535 El Camino Del Mar | remodel (e) 2nd story bedroom / bath over garage as accessory to new bedroom over (e) study. new interior stair to replace (e) exterior stair. replace kitchen roof, remodel (e) kitchen, bath, finishes, replace (e) windows, and exterior fin.Details
remodel (e) 2nd story bedroom / bath over garage as accessory to new bedroom over (e) study. new interior stair to replace (e) exterior stair. replace kitchen roof, remodel (e) kitchen, bath, finishes, replace (e) windows, and exterior fin. | $100,000 |
| Dec 6, 2011 | Never finaled issued Dec 2011, no final | 1291 05th Av | kitchen & master bath remodel, strip finished to studs in most areas keep (e) cabinets on north wall & most of west wall. patch in a few new cabinets, new electrical & plumbing, lighting to be flourescent to meet title 24. no change on walls and openings.Details
kitchen & master bath remodel, strip finished to studs in most areas keep (e) cabinets on north wall & most of west wall. patch in a few new cabinets, new electrical & plumbing, lighting to be flourescent to meet title 24. no change on walls and openings. | $30,000 |
| Oct 11, 2011 | Completed final sign-off Jan 2012 | 2848 Union St | replace vanity, water closet and new electrical fixtures. replace 5/8" drywall, (8'x8' type x). after voluntary seismic shearwall & hold downs. install new door and paint/plaster under powder bathroom, only-main floor. under pa#201107150371.Details
replace vanity, water closet and new electrical fixtures. replace 5/8" drywall, (8'x8' type x). after voluntary seismic shearwall & hold downs. install new door and paint/plaster under powder bathroom, only-main floor. under pa#201107150371. | $15,000 |
| Sep 21, 2011 | Completed final sign-off Jan 2013 | 2416 Gough St | convert portion of (e) garage level under kitchen & brkfst rm to habitable space. partially infill under (e) deck to allign w/ (e) rear wall above. 1st fl: extend (e) brkfst rm north to side property line to enclose portion of deck. total depth of bldg does not change. 2nd fl: raise (e) bath ceilingDetails
convert portion of (e) garage level under kitchen & brkfst rm to habitable space. partially infill under (e) deck to allign w/ (e) rear wall above. 1st fl: extend (e) brkfst rm north to side property line to enclose portion of deck. total depth of bldg does not change. 2nd fl: raise (e) bath ceiling | $143,000 |
| Sep 2, 2011 | Completed final sign-off Mar 2012 | 1100 Union St | addendum to permit #201107119849 for submission of plans to show walls moved and electrical per dbi request.renovation of kitchen, baths, relocate laundry & new finishes throughout.Details
addendum to permit #201107119849 for submission of plans to show walls moved and electrical per dbi request.renovation of kitchen, baths, relocate laundry & new finishes throughout. | |
| Aug 12, 2011 | Completed final sign-off Jun 2012 | 29 Saint Germain Av | interior remodel-all flrs including laundry, master bedroom, master bath, kitchen, 2 baths, 1 powder rm, new cabinets, appliances & fixtures. new exterior entry stairs- replacement in kind, voluntary seismic upgrade, expand lower level stairhall into (e) crawl space. change 4 windows not in kindDetails
interior remodel-all flrs including laundry, master bedroom, master bath, kitchen, 2 baths, 1 powder rm, new cabinets, appliances & fixtures. new exterior entry stairs- replacement in kind, voluntary seismic upgrade, expand lower level stairhall into (e) crawl space. change 4 windows not in kind | $200,000 |
| Aug 8, 2011 | Completed final sign-off Nov 2013 | 2848 Union St | revision to bpa#2011-0715-0355. add dog washing utility sink and full bath in basement.Details
revision to bpa#2011-0715-0355. add dog washing utility sink and full bath in basement. | $3,000 |
| Aug 3, 2011 | Completed final sign-off Feb 2012 | 2649 Green St | revision to 200809182024. reduction in scope. omit guest bath on basement floor, relable as closetDetails
revision to 200809182024. reduction in scope. omit guest bath on basement floor, relable as closet | |
| Jul 15, 2011 | Never finaled issued Jul 2011, no final | 2848 Union St | replace guestroom windows at rear, remodel guest bathroom, add ejector pump in lowest level for furture bathroom. install environmetal control unit for unconditioned storage area. replace hot water heater,install (n) deck at main level, no cfc for this work without installation of work under pa 2011Details
replace guestroom windows at rear, remodel guest bathroom, add ejector pump in lowest level for furture bathroom. install environmetal control unit for unconditioned storage area. replace hot water heater,install (n) deck at main level, no cfc for this work without installation of work under pa 2011 | $50,000 |
| Jul 11, 2011 | Completed final sign-off Mar 2012 | 1100 Union St | interior renovation of unit #201 only to include:floor finishes, new plumbing, light fixtures through out. new countertops and cabinets in kitchen. no structural work. entire unit includes 2 bedroom, 3 bathrooms kitchen, dinning room, living room (approx 2400 sq ft) provide high efficacy lighting.Details
interior renovation of unit #201 only to include:floor finishes, new plumbing, light fixtures through out. new countertops and cabinets in kitchen. no structural work. entire unit includes 2 bedroom, 3 bathrooms kitchen, dinning room, living room (approx 2400 sq ft) provide high efficacy lighting. | $335,650 |
| May 2, 2011 | Completed final sign-off Feb 2012 | 3527 Washington St | 1)remove extg door and add new door at west elevation. 2)add new windows and door to master bedroom at 3rd floor.3)replace extg windows at master bathroom at 3rd floor.Details
1)remove extg door and add new door at west elevation. 2)add new windows and door to master bedroom at 3rd floor.3)replace extg windows at master bathroom at 3rd floor. | $1,500 |
| Mar 29, 2011 | Completed final sign-off May 2012 | 2781 Union St | infill (2) lightwells at existing 2nd floor, kitchen & 1 1/2 bath remodel & misc interior improvements. new windows and door at rear 1st flr, change garage doorDetails
infill (2) lightwells at existing 2nd floor, kitchen & 1 1/2 bath remodel & misc interior improvements. new windows and door at rear 1st flr, change garage door | $128,000 |
| Jan 10, 2011 | Completed final sign-off May 2012 | 2781 Union St | open walls for structural engineer. remove and replace kitchen, master bath, bath#2, powder room. exploritory wholes approx 1000 sf repaired in kind, refinished. no change to windows or doors. lighting to comply with cfc 150 kDetails
open walls for structural engineer. remove and replace kitchen, master bath, bath#2, powder room. exploritory wholes approx 1000 sf repaired in kind, refinished. no change to windows or doors. lighting to comply with cfc 150 k | $120,000 |
| Dec 23, 2010 | Completed final sign-off Apr 2011 | 2632 Fillmore St | to comply with his nov# 200455353, dated jan 4, 2005. bathrm remodel on 3rd fl, strip to studs. relocate plbg fixtures in same bath. refinish (e) hardwood floors. elec switching to conform w/ title 24.Details
to comply with his nov# 200455353, dated jan 4, 2005. bathrm remodel on 3rd fl, strip to studs. relocate plbg fixtures in same bath. refinish (e) hardwood floors. elec switching to conform w/ title 24. | $42,000 |
| Nov 24, 2010 | Completed final sign-off May 2012 | 2535 Lyon St | remodel of (e) 2 unit bldg: work includes seismic upgrade. legalization of (e) unit @ ground fl. new elevator, new ext. windows & doors. 2 (n) gas fireboxes replacing (e) fireplaces. new radiant heating, ,new plumbing system. new electrical system. remodel kitchens & bathrooms.Details
remodel of (e) 2 unit bldg: work includes seismic upgrade. legalization of (e) unit @ ground fl. new elevator, new ext. windows & doors. 2 (n) gas fireboxes replacing (e) fireplaces. new radiant heating, ,new plumbing system. new electrical system. remodel kitchens & bathrooms. | $600,000 |
| Oct 8, 2010 | Expired or cancelled expired Dec 2018 | 2825 Lake St | partial renovation of interior incl kitchen & bathrooms. vertical addition of a new 3rd story to the main house & 2nd story over the garage. horizontal addition to north face of garage & to the southeast (rear) corner of the main house.Details
partial renovation of interior incl kitchen & bathrooms. vertical addition of a new 3rd story to the main house & 2nd story over the garage. horizontal addition to north face of garage & to the southeast (rear) corner of the main house. | $250,000 |
| Oct 8, 2010 | Completed final sign-off Apr 2011 | 2765 Union St | kitchen/master bath/guest bagth remodel, patching in baths, relocation of plumbing, no structural work, new lighting will conform to todays title 24, new tile and cabinets, re-using appliances and fixturesDetails
kitchen/master bath/guest bagth remodel, patching in baths, relocation of plumbing, no structural work, new lighting will conform to todays title 24, new tile and cabinets, re-using appliances and fixtures | $55,000 |
| Aug 18, 2010 | Completed final sign-off Jul 2012 | 2334 Lake St | interior remodel including reloacting kitchen, new elevator, new stair to first level and 2 new full bathrooms at level 3. new workshop at level 1.Details
interior remodel including reloacting kitchen, new elevator, new stair to first level and 2 new full bathrooms at level 3. new workshop at level 1. | $79,500 |
| Jul 7, 2010 | Completed final sign-off May 2011 | 2765 Union St | 759 sq ft addition at basement/garage level within footprint of existing building to provide 1 new bath, mudroom & storage spaces. new interior stairs from first floor to basement level. new exterior stairs from basement level to backyard. widen existing driveway and garage doorDetails
759 sq ft addition at basement/garage level within footprint of existing building to provide 1 new bath, mudroom & storage spaces. new interior stairs from first floor to basement level. new exterior stairs from basement level to backyard. widen existing driveway and garage door | $175,000 |
| Mar 11, 2010 | Completed final sign-off Jan 2011 | 3712 Jackson St | kitchen & bathroom remodel. no structural work. remove & replace interior finishes. comform to title 24 regulations. work on 2nd. flr. for kitchen & 3rd. flr. for bath.Details
kitchen & bathroom remodel. no structural work. remove & replace interior finishes. comform to title 24 regulations. work on 2nd. flr. for kitchen & 3rd. flr. for bath. | $80,000 |
| Feb 22, 2010 | Completed final sign-off Jun 2010 | 2310 Washington St | remodel extg top floor rear bathroom. new shower, tub, vanity and fixture. replace bathroom and bedroom windows at rear with insulated wndw in kind.Details
remodel extg top floor rear bathroom. new shower, tub, vanity and fixture. replace bathroom and bedroom windows at rear with insulated wndw in kind. | $100,000 |
| Dec 1, 2009 | Completed final sign-off May 2011 | 2421 Pierce St | kitchen & bath interior renovation @ 1st & 2nd floor, reconfiguration of space @ basement, convert storage to habitable space @ attic w/in (e) roofline, replace slab on grade & expand parking to 3 cars @ garage. relocate stairs @ 1st & 2nd floor, no exterior modifications. structural modification.Details
kitchen & bath interior renovation @ 1st & 2nd floor, reconfiguration of space @ basement, convert storage to habitable space @ attic w/in (e) roofline, replace slab on grade & expand parking to 3 cars @ garage. relocate stairs @ 1st & 2nd floor, no exterior modifications. structural modification. | $320,000 |
| Oct 13, 2009 | Completed final sign-off Sep 2010 | 107 Spruce St | kitchen and bathroom remodel on 2nd and 3rd floors. no structural work, no changes to bldg envelope. revising non structural wall in master bathroom. new interior paint, refinish floorsDetails
kitchen and bathroom remodel on 2nd and 3rd floors. no structural work, no changes to bldg envelope. revising non structural wall in master bathroom. new interior paint, refinish floors | $300,000 |
| Sep 15, 2009 | Completed final sign-off Dec 2009 | 209 Sussex St | renovate and retile existing shower, retile bath, new vanity cabinet, exhaust fan, new lights and replace window and new tub replacment , 1 bath only. ufactor 0.67 maxDetails
renovate and retile existing shower, retile bath, new vanity cabinet, exhaust fan, new lights and replace window and new tub replacment , 1 bath only. ufactor 0.67 max | $45,000 |
| Mar 3, 2009 | Completed final sign-off Jul 2009 | 290 Union St | remodel of existing bathroom, relocate toilet, install new finishes no structural work. partial kitchen remodel remove & replace existing island. replace hardwood floor, remove fireplace.Details
remodel of existing bathroom, relocate toilet, install new finishes no structural work. partial kitchen remodel remove & replace existing island. replace hardwood floor, remove fireplace. | $30,000 |
| Oct 29, 2008 | Completed final sign-off Apr 2009 | 2257 Green St | remodel bathroom and install new staircase between 2nd and 3rd floor. wine cellar, & garden room @ 2nd floor.Details
remodel bathroom and install new staircase between 2nd and 3rd floor. wine cellar, & garden room @ 2nd floor. | $50,000 |
| May 14, 2008 | Completed final sign-off Sep 2008 | 66 Santa Ysabel Av | kitchen & bath remodel - gut kitchen to studs, replace appliances. replace fixtures, title in bathroom. redo elect & plumbing to code. no structural work.Details
kitchen & bath remodel - gut kitchen to studs, replace appliances. replace fixtures, title in bathroom. redo elect & plumbing to code. no structural work. | $45,000 |
| Mar 18, 2008 | Completed final sign-off Sep 2008 | 2539 Turk Bl | 1 kitchen and 1 bath remodel. no structural. gut kitchen to studs. re-do elect & plumbing to code. install rock / cabinets & new appliances in same locations. bath remove & replace fixtures in same locations. new tile. min elect. all elect meet new title 24 requirements.Details
1 kitchen and 1 bath remodel. no structural. gut kitchen to studs. re-do elect & plumbing to code. install rock / cabinets & new appliances in same locations. bath remove & replace fixtures in same locations. new tile. min elect. all elect meet new title 24 requirements. | $38,000 |
| Jan 7, 2008 | Completed final sign-off May 2008 | 1145 Vallejo St | bathroom remodel out to studs, no structural. new toilet, shower, vanity, new plumbing and electrical. new shower pan. lighting to be fluorescant or on sensor. lighting to meet electrical requirements.Details
bathroom remodel out to studs, no structural. new toilet, shower, vanity, new plumbing and electrical. new shower pan. lighting to be fluorescant or on sensor. lighting to meet electrical requirements. | $27,000 |
| Nov 14, 2007 | Completed final sign-off Jan 2008 | 1562 Stockton St | change cabinets of 1 kitchen, remodel 1 bathroom. change tub sink toilet tile wall. florecent lighting at 1566a unitDetails
change cabinets of 1 kitchen, remodel 1 bathroom. change tub sink toilet tile wall. florecent lighting at 1566a unit | $14,000 |
| Aug 10, 2007 | Expired or cancelled expired Jun 2008 | 1568 Stockton St | change cabinets of kitchen, remodel bathroom, change tub,sink toilet tile wall, 50% of wattage of kitchen lighting to be fluoresceant, bathroom lighting to be fluorescant ok on occupant sensorDetails
change cabinets of kitchen, remodel bathroom, change tub,sink toilet tile wall, 50% of wattage of kitchen lighting to be fluoresceant, bathroom lighting to be fluorescant ok on occupant sensor | $14,000 |