Traube Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Nov 2005 to Jun 2026
- Last 24 months
- 2 permits filed
94 permits since 2000: 81 completed, 3 in progress, 8 never finaled, 2 expired or cancelled.
Of the 8 never-finaled permits, 3 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
12 deck permits: 12 completed. Typically 12 days from filing to permit and 239 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 1, 2024 | Completed final sign-off Oct 2024 | 1951 29th Av | repair dryrot on (e) deck in back of house(less than 50% replace). repair dryrot on (e) rear wall next to the patio door (approx 4'x8' area). replace one (e) leaky rusty window in kind in back of house.Details
repair dryrot on (e) deck in back of house(less than 50% replace). repair dryrot on (e) rear wall next to the patio door (approx 4'x8' area). replace one (e) leaky rusty window in kind in back of house. | $9,000 |
| Sep 3, 2019 | Completed final sign-off May 2024 | 638 11th Av | demo of (e) rear yard stairs; fill in (e) door to rear yard. remove existing window @ rear of house. new deck off dining room; new window opening.new stairs to backyard; new pantry. new windows at eixsting openings; new shears walls for seismic, new exterior lights, gas line house bib.Details
demo of (e) rear yard stairs; fill in (e) door to rear yard. remove existing window @ rear of house. new deck off dining room; new window opening.new stairs to backyard; new pantry. new windows at eixsting openings; new shears walls for seismic, new exterior lights, gas line house bib. | $35,000 |
| Jun 1, 2018 | Completed final sign-off Nov 2020 | 455 Vernon St | convert 1st flr area behind garage to habitable living space relocate interior stair add 3 new bedrm, 3 baths, laundry, family rm. 2nd flr - relocate kitchen living dining & 2 bedrooms add ensuite bath@ master bedrm, new ext stair to yard@ (e) deckDetails
convert 1st flr area behind garage to habitable living space relocate interior stair add 3 new bedrm, 3 baths, laundry, family rm. 2nd flr - relocate kitchen living dining & 2 bedrooms add ensuite bath@ master bedrm, new ext stair to yard@ (e) deck | $325,000 |
| Nov 18, 2016 | Completed final sign-off Oct 2017 | 242 San Jose Av | legalize (e) deck, (n) roof deck on 3/f roof.Details
legalize (e) deck, (n) roof deck on 3/f roof. | $50,000 |
| Apr 28, 2016 | Completed final sign-off Jun 2020 | 1235 05th Av | interior: new living space to (e) area behind garage: new family room, bed room, bath, stairs, removel (e) kitchen, powder room. exterior: rear addition infill @ nw corner on ground + second floors, replace (e) ext rear deck + stairs, new windows on rear facade.Details
interior: new living space to (e) area behind garage: new family room, bed room, bath, stairs, removel (e) kitchen, powder room. exterior: rear addition infill @ nw corner on ground + second floors, replace (e) ext rear deck + stairs, new windows on rear facade. | $150,000 |
| Aug 17, 2015 | Completed final sign-off Jul 2016 | 1674 26th Av | horizontial addition, lightwell partial in fill along south property line at 1/f & 2/f. 1/f: convert storage space to habitable, 2 bedrooms, bath, family room. replace interior stairs, new deck with stairs at rear yard, relocate & remodel kitchen, remodel bath & new bath at 2/fDetails
horizontial addition, lightwell partial in fill along south property line at 1/f & 2/f. 1/f: convert storage space to habitable, 2 bedrooms, bath, family room. replace interior stairs, new deck with stairs at rear yard, relocate & remodel kitchen, remodel bath & new bath at 2/f | $85,000 |
| Mar 6, 2015 | Completed final sign-off Jun 2018 | 611 39th Av | ground fl partial garage area conversion to livable space attic roof portion (15'-0") setback. add dormers (2) & stairwells+ rear yard deck. + exterior stairs.Details
ground fl partial garage area conversion to livable space attic roof portion (15'-0") setback. add dormers (2) & stairwells+ rear yard deck. + exterior stairs. | $200,000 |
| Dec 17, 2013 | Completed final sign-off Mar 2014 | 700 Congo St | gr fl improvement to include family room and bedroom, full bath. fire proof garage on 1st fl. wall and ceiling to comply with code. 2nd fl: upgrade deck rail to comply with code. repair kitchen counter. legalize 1st floor bathroom.Details
gr fl improvement to include family room and bedroom, full bath. fire proof garage on 1st fl. wall and ceiling to comply with code. 2nd fl: upgrade deck rail to comply with code. repair kitchen counter. legalize 1st floor bathroom. | $30,000 |
| Aug 7, 2013 | Completed final sign-off Mar 2014 | 679 39th Av | 1st fl: improve garage arear with 2 bederoom, 1 bath, 1 study room and 1 family room with 1 remaining parking. 2nd fl: remodel kitchen and bath. adjust room sizes to include 1 extra bath and bedroom and add 79 sq ft towards left sid of building as infill. new deck at rearDetails
1st fl: improve garage arear with 2 bederoom, 1 bath, 1 study room and 1 family room with 1 remaining parking. 2nd fl: remodel kitchen and bath. adjust room sizes to include 1 extra bath and bedroom and add 79 sq ft towards left sid of building as infill. new deck at rear | $125,000 |
| Mar 21, 2013 | Completed final sign-off May 2013 | 700 Congo St | on first floor rear of residence: repair (e) delapidated wood deck in-kind within (e) property line. less than 50%.Details
on first floor rear of residence: repair (e) delapidated wood deck in-kind within (e) property line. less than 50%. | $5,000 |
| Sep 16, 2011 | Completed final sign-off Oct 2011 | 621 Santiago St | revision to pa# 2010-1130-5804-new rear stairs & re-labeled room at ground floor. rear deck to be, max 30" above grade.Details
revision to pa# 2010-1130-5804-new rear stairs & re-labeled room at ground floor. rear deck to be, max 30" above grade. | |
| Mar 10, 2008 | Completed final sign-off Mar 2008 | 646 41st Av | remove & repair less than 50% of deck structure, replace 1x decking material w/ 2x6 pressure treated material. remove and replace with one-15 ft. long joist. remove & replace one middle post at center of stair. reinforce deck joist next to kitchen door with additional joist to stiffen the structure.Details
remove & repair less than 50% of deck structure, replace 1x decking material w/ 2x6 pressure treated material. remove and replace with one-15 ft. long joist. remove & replace one middle post at center of stair. reinforce deck joist next to kitchen door with additional joist to stiffen the structure. | $3,200 |