Traube Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Nov 2005 to Jun 2026
- Last 24 months
- 2 permits filed
94 permits since 2000: 81 completed, 3 in progress, 8 never finaled, 2 expired or cancelled.
Of the 8 never-finaled permits, 3 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
21 stairs permits: 20 completed, 1 expired or cancelled. Typically 7 days from filing to permit and 182 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 21, 2023 | Completed final sign-off Dec 2023 | 831 Greenwich St | to comply with nov item#4: 202314084: repair back exterior stair less than 50%Details
to comply with nov item#4: 202314084: repair back exterior stair less than 50% | $2,000 |
| May 27, 2022 | Completed final sign-off Aug 2022 | 2269 17th Av | remove and replace about 250 sf of stucco in-kind in th front and stair way sideDetails
remove and replace about 250 sf of stucco in-kind in th front and stair way side | $18,000 |
| Mar 11, 2022 | Completed final sign-off Mar 2022 | 72 Elsie St | rev to pa 202202087592. replace (e) redwood enter stair in kind. all dimensions to remain the same. no change in location height or materials . all woord memebers shall be redwood or pressure treated.Details
rev to pa 202202087592. replace (e) redwood enter stair in kind. all dimensions to remain the same. no change in location height or materials . all woord memebers shall be redwood or pressure treated. | |
| Feb 8, 2022 | Completed final sign-off Mar 2022 | 72 Elsie St | repair (e) exterior stair & landing. less than 50%.Details
repair (e) exterior stair & landing. less than 50%. | $5,000 |
| Sep 3, 2019 | Completed final sign-off May 2024 | 638 11th Av | demo of (e) rear yard stairs; fill in (e) door to rear yard. remove existing window @ rear of house. new deck off dining room; new window opening.new stairs to backyard; new pantry. new windows at eixsting openings; new shears walls for seismic, new exterior lights, gas line house bib.Details
demo of (e) rear yard stairs; fill in (e) door to rear yard. remove existing window @ rear of house. new deck off dining room; new window opening.new stairs to backyard; new pantry. new windows at eixsting openings; new shears walls for seismic, new exterior lights, gas line house bib. | $35,000 |
| Jun 1, 2018 | Completed final sign-off Nov 2020 | 455 Vernon St | convert 1st flr area behind garage to habitable living space relocate interior stair add 3 new bedrm, 3 baths, laundry, family rm. 2nd flr - relocate kitchen living dining & 2 bedrooms add ensuite bath@ master bedrm, new ext stair to yard@ (e) deckDetails
convert 1st flr area behind garage to habitable living space relocate interior stair add 3 new bedrm, 3 baths, laundry, family rm. 2nd flr - relocate kitchen living dining & 2 bedrooms add ensuite bath@ master bedrm, new ext stair to yard@ (e) deck | $325,000 |
| Apr 10, 2017 | Completed final sign-off Aug 2017 | 111 Monticello St | replace interior stairs. new opening between living & dining. at 2nd flr remodel kitchen & bath, add new powder rm. at 1st flr remodel bath. add 2 skylightsDetails
replace interior stairs. new opening between living & dining. at 2nd flr remodel kitchen & bath, add new powder rm. at 1st flr remodel bath. add 2 skylights | $50,000 |
| Dec 28, 2016 | Completed final sign-off Jul 2017 | 1750 32nd Av | remodel (e)home-partial infill @ (e) tunnel entrance. reconstruction of primary stair, removal of non-conforming 2nd stair, minor excavation & leveling of ground flr. relocation of master suite, creation of family rm and foyer 2 1st flr. relocation of bath 1, creation of bath & home office @ 2nd fl.Details
remodel (e)home-partial infill @ (e) tunnel entrance. reconstruction of primary stair, removal of non-conforming 2nd stair, minor excavation & leveling of ground flr. relocation of master suite, creation of family rm and foyer 2 1st flr. relocation of bath 1, creation of bath & home office @ 2nd fl. | $80,000 |
| Aug 24, 2016 | Completed final sign-off Jul 2019 | 811 30th Av | 1)replace interior stairs between 1st and 2nd floor. 2)new bath at 1st fl. 3)kitchen & bathremodel at 2nd floor. 4)bath remodel at 3rd floor. 5)replace entry gate & decorative railing. 6)new sliding door at social room & new window at kitchen.Details
1)replace interior stairs between 1st and 2nd floor. 2)new bath at 1st fl. 3)kitchen & bathremodel at 2nd floor. 4)bath remodel at 3rd floor. 5)replace entry gate & decorative railing. 6)new sliding door at social room & new window at kitchen. | $70,000 |
| Apr 28, 2016 | Completed final sign-off Jun 2020 | 1235 05th Av | interior: new living space to (e) area behind garage: new family room, bed room, bath, stairs, removel (e) kitchen, powder room. exterior: rear addition infill @ nw corner on ground + second floors, replace (e) ext rear deck + stairs, new windows on rear facade.Details
interior: new living space to (e) area behind garage: new family room, bed room, bath, stairs, removel (e) kitchen, powder room. exterior: rear addition infill @ nw corner on ground + second floors, replace (e) ext rear deck + stairs, new windows on rear facade. | $150,000 |
| Nov 23, 2015 | Completed final sign-off Nov 2016 | 3984 20th St | new roof deck & new exterior spiral stairs.Details
new roof deck & new exterior spiral stairs. | $18,000 |
| Aug 17, 2015 | Completed final sign-off Jul 2016 | 1674 26th Av | horizontial addition, lightwell partial in fill along south property line at 1/f & 2/f. 1/f: convert storage space to habitable, 2 bedrooms, bath, family room. replace interior stairs, new deck with stairs at rear yard, relocate & remodel kitchen, remodel bath & new bath at 2/fDetails
horizontial addition, lightwell partial in fill along south property line at 1/f & 2/f. 1/f: convert storage space to habitable, 2 bedrooms, bath, family room. replace interior stairs, new deck with stairs at rear yard, relocate & remodel kitchen, remodel bath & new bath at 2/f | $85,000 |
| Mar 6, 2015 | Completed final sign-off Jun 2018 | 611 39th Av | ground fl partial garage area conversion to livable space attic roof portion (15'-0") setback. add dormers (2) & stairwells+ rear yard deck. + exterior stairs.Details
ground fl partial garage area conversion to livable space attic roof portion (15'-0") setback. add dormers (2) & stairwells+ rear yard deck. + exterior stairs. | $200,000 |
| Nov 30, 2012 | Completed final sign-off May 2017 | 95 Middlefield Dr | 1st floor: add wall in garage for storage. 2 car garage to stay. 2nd floor / main floor: add bay window to bedroom, remove (e) closet for location of stair s to upper floor/3rd floor. 3rd floor/upper floor: add 2 bedrooms, 1 study room & 1 bath over (e) 2nd floor/main floor.Details
1st floor: add wall in garage for storage. 2 car garage to stay. 2nd floor / main floor: add bay window to bedroom, remove (e) closet for location of stair s to upper floor/3rd floor. 3rd floor/upper floor: add 2 bedrooms, 1 study room & 1 bath over (e) 2nd floor/main floor. | $105,000 |
| Sep 16, 2011 | Completed final sign-off Oct 2011 | 621 Santiago St | revision to pa# 2010-1130-5804-new rear stairs & re-labeled room at ground floor. rear deck to be, max 30" above grade.Details
revision to pa# 2010-1130-5804-new rear stairs & re-labeled room at ground floor. rear deck to be, max 30" above grade. | |
| Jun 10, 2010 | Completed final sign-off Mar 2011 | 2426 32nd Av | replacement in-kind of existing front stair.Details
replacement in-kind of existing front stair. | $5,000 |
| Dec 26, 2008 | Completed final sign-off Feb 2009 | 1439 05th Av | repair backyard stair less than 50%. remove / replace 3 steps. repair stringer (one).Details
repair backyard stair less than 50%. remove / replace 3 steps. repair stringer (one). | $1,200 |
| Nov 12, 2008 | Completed final sign-off Mar 2009 | 295 Staples Av | remodel 1 kitchen & 1 bathroom. remove / replace roof. change electrical panel, install electrical outlets & lights through out house. remove & replace fron stair. less than 50% repair. replace heating unit. (f.a.u) interior / exterior painting.Details
remodel 1 kitchen & 1 bathroom. remove / replace roof. change electrical panel, install electrical outlets & lights through out house. remove & replace fron stair. less than 50% repair. replace heating unit. (f.a.u) interior / exterior painting. | $40,000 |
| Apr 16, 2008 | Expired or cancelled expired Jan 2009 | 630 La Grande Av | lower entry to increase floor to ceiling, rebuild (e) interior stairs-same configuration, rebuild walk to entry, improve structural frame at 3rd floor and foundation entryDetails
lower entry to increase floor to ceiling, rebuild (e) interior stairs-same configuration, rebuild walk to entry, improve structural frame at 3rd floor and foundation entry | $8,000 |
| Mar 10, 2008 | Completed final sign-off Mar 2008 | 646 41st Av | remove & repair less than 50% of deck structure, replace 1x decking material w/ 2x6 pressure treated material. remove and replace with one-15 ft. long joist. remove & replace one middle post at center of stair. reinforce deck joist next to kitchen door with additional joist to stiffen the structure.Details
remove & repair less than 50% of deck structure, replace 1x decking material w/ 2x6 pressure treated material. remove and replace with one-15 ft. long joist. remove & replace one middle post at center of stair. reinforce deck joist next to kitchen door with additional joist to stiffen the structure. | $3,200 |
| Nov 9, 2005 | Completed final sign-off Sep 2006 | 243 Bradford St | remove/replace front steps,repair rear of bldg.(bathroom),repair dry rot inr ear bldg. repair rear stair, less 50%. replace existing garage door.Details
remove/replace front steps,repair rear of bldg.(bathroom),repair dry rot inr ear bldg. repair rear stair, less 50%. replace existing garage door. | $74,000 |