Back to kitchen remodel contractors
Toni's Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Jan 2026
- Last 24 months
- 2 permits filed
180 permits since 2000: 152 completed, 7 never finaled, 21 expired or cancelled.
Of the 7 never-finaled permits, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
45 kitchen remodel permits: 44 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 135 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 16, 2026 | Completed final sign-off Jan 2026 | 134 Springfield Dr | reduction of scope to remove kitchen skylight from pa# 2025-0418-4767.Details
reduction of scope to remove kitchen skylight from pa# 2025-0418-4767. | |
| Apr 18, 2025 | Completed final sign-off Jan 2026 | 134 Springfield Dr | renovation to existing home. 1st level renovation: (e) bathroom and den addition, 2nd level renovation kitchen and bedroom and bathroom and 1/2 batnhroom,and addition (n) sklylight in kitchen and replace non-visible windows to vinyl. front windows alum clad wood casements.Details
renovation to existing home. 1st level renovation: (e) bathroom and den addition, 2nd level renovation kitchen and bedroom and bathroom and 1/2 batnhroom,and addition (n) sklylight in kitchen and replace non-visible windows to vinyl. front windows alum clad wood casements. | $280,000 |
| Sep 29, 2023 | Completed final sign-off Feb 2024 | 3640 18th St | apt c: 1 kitchen and 1 bathroom remodel: replace cabinets, tile, plumbing fixtures. remove bathtub change to shower, paintDetails
apt c: 1 kitchen and 1 bathroom remodel: replace cabinets, tile, plumbing fixtures. remove bathtub change to shower, paint | $35,000 |
| Jan 31, 2023 | Completed final sign-off Oct 2023 | 878 31st Av | replace (4) windows at front to clad over wood. one at dining room. (2) vinyl (at kitchen), (2) vinyl in bathroom. replace all cracked plaster to sheetrock install insulation at exterior walls. r3 at roof, r19 between floors.Details
replace (4) windows at front to clad over wood. one at dining room. (2) vinyl (at kitchen), (2) vinyl in bathroom. replace all cracked plaster to sheetrock install insulation at exterior walls. r3 at roof, r19 between floors. | $100,000 |
| Jan 31, 2023 | Completed final sign-off Oct 2023 | 880 31st Av | replace (6) windows at front to clad over wood. one at dining room. (2) vinyl (at kitchen), (2) vinyl in bathroom. replace all cracked plaster to sheetrock install insulation at exterior walls. r3 at roof, r19 between floors.Details
replace (6) windows at front to clad over wood. one at dining room. (2) vinyl (at kitchen), (2) vinyl in bathroom. replace all cracked plaster to sheetrock install insulation at exterior walls. r3 at roof, r19 between floors. | $100,000 |
| Jan 19, 2023 | Completed final sign-off Oct 2023 | 878 31st Av | unit 878: kitchen remodel. cabinet, sheetrock, plumbing, tile, paint.. 2.25 bathroom remodel. remodel shower, vanity, toilet, tile.Details
unit 878: kitchen remodel. cabinet, sheetrock, plumbing, tile, paint.. 2.25 bathroom remodel. remodel shower, vanity, toilet, tile. | $100,000 |
| Jan 19, 2023 | Completed final sign-off Oct 2023 | 880 31st Av | unit 880: kitchen remodel. cabinet, sheetrock, plumbing, tile, paint.. 2.25 bathroom remodel. remodel shower, vanity, toilet, tile.Details
unit 880: kitchen remodel. cabinet, sheetrock, plumbing, tile, paint.. 2.25 bathroom remodel. remodel shower, vanity, toilet, tile. | $100,000 |
| Aug 16, 2022 | Completed final sign-off Oct 2022 | 3620 Lawton St | one kitchen and one bathroom in kind remodel. no wall removed. (n) cabinet. faucets, tile, pant, drywallDetails
one kitchen and one bathroom in kind remodel. no wall removed. (n) cabinet. faucets, tile, pant, drywall | $30,000 |
| Jul 26, 2021 | Completed final sign-off Sep 2021 | 2787 Golden Gate Av | kitchen remodel, new wall & base cabinets. new tile, new toilet, new sink and faucet. painting new drywall.Details
kitchen remodel, new wall & base cabinets. new tile, new toilet, new sink and faucet. painting new drywall. | $20,000 |
| Jun 8, 2021 | Completed final sign-off Dec 2022 | 558 09th Av | kitchen renovation, infill lightwell 1 story only. replace windows and doors at rear of kitchen and dining roomDetails
kitchen renovation, infill lightwell 1 story only. replace windows and doors at rear of kitchen and dining room | $25,000 |
| Sep 10, 2018 | Completed final sign-off Jun 2019 | 2316 15th Av | kitchen remodel. new cabinet, counter, tile, paint. replace sliding door, 3 windows, behind kitchen ( all in back). replace rotted wood siding to hardie siding (at back). replace shower on 1st fl guest bath.Details
kitchen remodel. new cabinet, counter, tile, paint. replace sliding door, 3 windows, behind kitchen ( all in back). replace rotted wood siding to hardie siding (at back). replace shower on 1st fl guest bath. | $20,000 |
| Aug 2, 2017 | Completed final sign-off Nov 2017 | 2787 Golden Gate Av | replace (e) in-kind aluminum windows to vinyl due glase to back.(bedrooms), bathroom and kitchen). total: 12 windowsDetails
replace (e) in-kind aluminum windows to vinyl due glase to back.(bedrooms), bathroom and kitchen). total: 12 windows | $10,000 |
| Dec 15, 2016 | Completed final sign-off May 2017 | 1637 48th Av | remodel (e) kitchen. remove 2 walls, add new beam & 2 columns. develop ground floor accessory rooms, add bedroom, office & full bath. replace windows & doors not visible from st facing yard. add plywood shear walls, holdowns, new column footings, new slab as needed. bolt foundations, insulate, genDetails
remodel (e) kitchen. remove 2 walls, add new beam & 2 columns. develop ground floor accessory rooms, add bedroom, office & full bath. replace windows & doors not visible from st facing yard. add plywood shear walls, holdowns, new column footings, new slab as needed. bolt foundations, insulate, gen | $85,000 |
| Sep 8, 2016 | Completed final sign-off Mar 2017 | 3640 18th St | apt #a. replace cabinet, floor tile & counter for kitchen. replace new fixture and faucets for 2 bathrooms. remove one tub change to shower.Details
apt #a. replace cabinet, floor tile & counter for kitchen. replace new fixture and faucets for 2 bathrooms. remove one tub change to shower. | $5,000 |
| May 26, 2016 | Completed final sign-off Mar 2017 | 25 Ulloa St | develop new grd flr acc. rooms, bedrm, 1/2 bath, ofc & laundry/playrm. (e) bedrm and full bath remodel. replace (e) window w/n window & patio door. add 4 new windows. relocate int stair to center, new stairs, new stair footings. open wall at kitchen/dining to liv rm (e) furnance & w/h to be reloc..Details
develop new grd flr acc. rooms, bedrm, 1/2 bath, ofc & laundry/playrm. (e) bedrm and full bath remodel. replace (e) window w/n window & patio door. add 4 new windows. relocate int stair to center, new stairs, new stair footings. open wall at kitchen/dining to liv rm (e) furnance & w/h to be reloc.. | $74,700 |
| Dec 10, 2015 | Completed final sign-off Jul 2016 | 3430 Kirkham St | fill in center patio at 2nd floor not visible from street. remodel kitchen, add skylts. reframe roof. replace extg 4 wndws in kind not visible from st. add grnd fl accessory rms: family, bedroom, full bath, add new wndw new patio door. new conditionesd area aprx 598 sq ft. relocate extg frn & wh,Details
fill in center patio at 2nd floor not visible from street. remodel kitchen, add skylts. reframe roof. replace extg 4 wndws in kind not visible from st. add grnd fl accessory rms: family, bedroom, full bath, add new wndw new patio door. new conditionesd area aprx 598 sq ft. relocate extg frn & wh, | $84,800 |
| Jun 12, 2014 | Expired or cancelled cancelled Apr 2021 | 2317 28th Av | legalize ground floor kitchen.Details
legalize ground floor kitchen. | $5,000 |
| May 6, 2014 | Completed final sign-off Aug 2015 | 239 Chenery St | fitting out lower 2 floors with a master suite with bathroom, 2 bedrooms, and 2nd bathroom. remove unwarranted kitchen at garage level. new deck at grade at lower level less than 30" above gradeDetails
fitting out lower 2 floors with a master suite with bathroom, 2 bedrooms, and 2nd bathroom. remove unwarranted kitchen at garage level. new deck at grade at lower level less than 30" above grade | $185,000 |
| Oct 18, 2013 | Completed final sign-off Dec 2013 | 2431 Ortega St | kitchen remodel. change cabinet, faucet & fixtures. new flooring. no wall work.Details
kitchen remodel. change cabinet, faucet & fixtures. new flooring. no wall work. | $15,000 |
| Oct 18, 2013 | Completed final sign-off Jan 2014 | 2575 22nd Av | kitchen remodel. change new cabinets, countertop, plumbing fixtures & faucet, new floor, no wall work.Details
kitchen remodel. change new cabinets, countertop, plumbing fixtures & faucet, new floor, no wall work. | $15,000 |
| Aug 6, 2013 | Completed final sign-off Sep 2013 | 619 Clayton St | unit 1 - kitchen: new cabinet, sink faucet, tile, painting; bathroom - convert tub to shwoer. new vanity sink & faucet. tile & paintingDetails
unit 1 - kitchen: new cabinet, sink faucet, tile, painting; bathroom - convert tub to shwoer. new vanity sink & faucet. tile & painting | $15,000 |
| Jul 11, 2013 | Completed final sign-off Jan 2015 | 1368 Plymouth Av | remodel (e) bedrm & kitchen located in rear of house into a kitchen/family rm w/in the (e) footprint. (n) stair to access (n) living space @ lower level w/c is currently crawl space. lower level becomes 2 bedrms, bathrm, living rm & laundry rm. (e) interior parking garage area to remain.Details
remodel (e) bedrm & kitchen located in rear of house into a kitchen/family rm w/in the (e) footprint. (n) stair to access (n) living space @ lower level w/c is currently crawl space. lower level becomes 2 bedrms, bathrm, living rm & laundry rm. (e) interior parking garage area to remain. | $240,000 |
| Jun 6, 2013 | Completed final sign-off Aug 2014 | 3816 23rd St | kitchen remodel. remove closet, replace cabinet, counter. new plumbing fixtures & faucets, new tile, and painting.Details
kitchen remodel. remove closet, replace cabinet, counter. new plumbing fixtures & faucets, new tile, and painting. | $18,000 |
| Jul 27, 2012 | Completed final sign-off Dec 2012 | 830 Rockdale Dr | kitchen remodel, change countertop, new circuit for appliances. new sink and faucet. bathroom remodel, new tub and faucets. two vanity and faucets. drywall, painting, tile. no wall remove.Details
kitchen remodel, change countertop, new circuit for appliances. new sink and faucet. bathroom remodel, new tub and faucets. two vanity and faucets. drywall, painting, tile. no wall remove. | $18,000 |
| Jan 11, 2012 | Completed final sign-off Mar 2012 | 239 Chenery St | kitchen remodel - new cabinet, plumbing, fixture, light fixture, lighting to comply with cec 150(k).Details
kitchen remodel - new cabinet, plumbing, fixture, light fixture, lighting to comply with cec 150(k). | $20,000 |
| Oct 13, 2011 | Completed final sign-off Dec 2011 | 826 Peralta Av | bathroom remodel, change plumbing fixture & faucets, light fixture, tile, drywall, painting. replace kitchen sink and faucet only. lighting to comply with cec150(k)Details
bathroom remodel, change plumbing fixture & faucets, light fixture, tile, drywall, painting. replace kitchen sink and faucet only. lighting to comply with cec150(k) | $10,000 |
| Jul 21, 2011 | Completed final sign-off Dec 2011 | 1722 33rd Av | (e) kitchen and bathrm, remodel change fixture, tile, cabinet, drywall painting, repl rotted siding at backDetails
(e) kitchen and bathrm, remodel change fixture, tile, cabinet, drywall painting, repl rotted siding at back | $32,836 |
| Apr 3, 2009 | Completed final sign-off May 2009 | 407 Locust St | kitchen & bathroom remodel. re-wire bedroom outlets.Details
kitchen & bathroom remodel. re-wire bedroom outlets. | $20,000 |
| Feb 5, 2009 | Completed final sign-off Jun 2009 | 841 Rockdale Dr | new deck @ back yard less than 10'-0" height, approx 187 sf, add ramps, add retain wall 4' high, remodel kitchen, new patio door, new window @ back.Details
new deck @ back yard less than 10'-0" height, approx 187 sf, add ramps, add retain wall 4' high, remodel kitchen, new patio door, new window @ back. | $19,919 |
| Mar 27, 2008 | Completed final sign-off Jul 2008 | 751 Clayton St | interior remodel of kitchen and dining room. remove two walls. all work on the 3rd floor(arch.& structural alteration). (n) wall in living room to create two rooms for bedroom and office.Details
interior remodel of kitchen and dining room. remove two walls. all work on the 3rd floor(arch.& structural alteration). (n) wall in living room to create two rooms for bedroom and office. | $50,000 |
| Feb 22, 2008 | Completed final sign-off May 2008 | 2425 16th Av | kitchen and bath remodel. change cabinets and counter. new plumbing fixtures and faucets. steam shower, replace drywall and paint. not structural work.Details
kitchen and bath remodel. change cabinets and counter. new plumbing fixtures and faucets. steam shower, replace drywall and paint. not structural work. | $38,000 |
| Nov 21, 2006 | Completed final sign-off Nov 2007 | 875 Portola Dr | convert ground floor from storage to family room,office. 2 bedrooms, full bath/ add 1 bath, kitchen, bath remodel and convert to master bedroom @ 2nd flrDetails
convert ground floor from storage to family room,office. 2 bedrooms, full bath/ add 1 bath, kitchen, bath remodel and convert to master bedroom @ 2nd flr | $120,000 |
| Oct 19, 2005 | Completed final sign-off Dec 2005 | 751 Clayton St | kitchen remodel new appliance cabinets sheetrock painting light for no 753-new recess lights at hallway, stairway for 751- no structural workDetails
kitchen remodel new appliance cabinets sheetrock painting light for no 753-new recess lights at hallway, stairway for 751- no structural work | $30,000 |
| Jul 12, 2005 | Completed final sign-off Dec 2005 | 17 Westwood Dr | (e) kitchen and bathrm remodel, at 1st flr, change cabinet, faucet & fixture. sheetrock, painting, nDetails
(e) kitchen and bathrm remodel, at 1st flr, change cabinet, faucet & fixture. sheetrock, painting, n | $20,000 |
| Jan 13, 2005 | Completed final sign-off Apr 2005 | 1426 23rd Av | kitchen, bathroom, toilet rm, remodel change cabs plumbing fixture & faucets, sheetrock tile paintinDetails
kitchen, bathroom, toilet rm, remodel change cabs plumbing fixture & faucets, sheetrock tile paintin | $35,000 |
| Sep 15, 2004 | Completed final sign-off Dec 2004 | 1268 05th Av | kitchen remodel,new cabinet,sink,faucets,sheetrock,painting,tile.new toilet @(e)1/2 bath convert toDetails
kitchen remodel,new cabinet,sink,faucets,sheetrock,painting,tile.new toilet @(e)1/2 bath convert to | $58,000 |
| Jul 1, 2004 | Completed final sign-off Aug 2004 | 749 Panorama Dr | kitchen remodel change cabinet, sink, faucet tle, addition outlet, no structuralworkDetails
kitchen remodel change cabinet, sink, faucet tle, addition outlet, no structuralwork | $20,000 |
| Mar 23, 2004 | Completed final sign-off Jul 2004 | 116 Tara St | remodel (e) kitchen +bath. repalce crack plaster through the house. rewire/replace cabinet, fixtureDetails
remodel (e) kitchen +bath. repalce crack plaster through the house. rewire/replace cabinet, fixture | $28,000 |
| Jun 16, 2003 | Completed final sign-off Aug 2003 | 515 Kansas St | kitchen remodel. replace cabinet. plumbing fixtures if faucets.floor tiles. painting. replace crackeDetails
kitchen remodel. replace cabinet. plumbing fixtures if faucets.floor tiles. painting. replace cracke | $10,000 |
| May 20, 2003 | Completed final sign-off Mar 2004 | 274 Casitas Av | remodel two bathrooms. change fixture & faucets. tile, sheetrock, painting. kitchen remodel. changeDetails
remodel two bathrooms. change fixture & faucets. tile, sheetrock, painting. kitchen remodel. change | $23,000 |
| Mar 4, 2003 | Completed final sign-off Aug 2003 | 338 Staples Av | kitchen & bathroom remodel. change cabinet,floor tile,sheetrock,plumbing fixts & faucet.Details
kitchen & bathroom remodel. change cabinet,floor tile,sheetrock,plumbing fixts & faucet. | $9,800 |
| Jul 18, 2002 | Completed final sign-off Sep 2002 | 622 Geneva Av | kitchen remodel bathrm remodel 1/f & 2/f change 2 windows at kitchen one for bathroom (none visiblDetails
kitchen remodel bathrm remodel 1/f & 2/f change 2 windows at kitchen one for bathroom (none visibl | $15,000 |
| Feb 9, 2001 | Completed final sign-off Aug 2001 | 2435 17th Av | remodel kitchen and bathrm, no structural workDetails
remodel kitchen and bathrm, no structural work | $18,000 |
| Jun 23, 2000 | Completed final sign-off Jul 2000 | 364 Country Club Dr | kitchen remodeling, sheetrock and paintingDetails
kitchen remodeling, sheetrock and painting | $8,000 |
| Feb 18, 2000 | Completed final sign-off Apr 2000 | 2274 40th Av | kitchen remodelingDetails
kitchen remodeling |