Terence Mcmahon Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2005 to Jul 2026
- Last 24 months
- 56 permits filed
551 permits since 2000: 426 completed, 27 in progress, 74 never finaled, 24 expired or cancelled.
Of the 74 never-finaled permits, 14 are 3 to 5 years old, 36 are 5 to 10 years old, 24 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Roof deck permits
9 roof deck permits: 7 completed, 1 in progress, 1 never finaled. Typically 336 days from filing to permit and 175 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 1, 2026 | In progress filed May 2026, not yet issued | 2140 Great Hy | abatement of nov #201953441. legalize unpermitted unit as state adu (unit a, 686 sf) at g/f per gvnt sec, 65852.2. convert (e) 1-story sloping to be roof deck per (e) access to open space. no change to bldg. replace 2 windows w. 2 glazed slidingdoors on 2/f. no deferral.Details
abatement of nov #201953441. legalize unpermitted unit as state adu (unit a, 686 sf) at g/f per gvnt sec, 65852.2. convert (e) 1-story sloping to be roof deck per (e) access to open space. no change to bldg. replace 2 windows w. 2 glazed slidingdoors on 2/f. no deferral. | $85,000 |
| Oct 11, 2023 | Completed final sign-off Apr 2024 | 3990 Washington St | retile roof deck on 2nd fl, also re waterproof visible from streetDetails
retile roof deck on 2nd fl, also re waterproof visible from street | $6,000 |
| Jul 1, 2022 | Completed final sign-off Jul 2023 | 2300 Leavenworth St | restoration of permitted roof deck under bpa 7801260 to address nov202014261.Details
restoration of permitted roof deck under bpa 7801260 to address nov202014261. | $7,500 |
| Mar 23, 2021 | Completed final sign-off Jun 2024 | 614 Buchanan St | demo rear (e) wood exterior egress stair & non-compliant balcony (#616 kitchen) replace & relocate. demo (e) roof for (n) roof deck & glazed wind protection. (n) mech & photovoltaic system. replace (e) single glazed windows w/ double glazed. interior remodeling in both unitsDetails
demo rear (e) wood exterior egress stair & non-compliant balcony (#616 kitchen) replace & relocate. demo (e) roof for (n) roof deck & glazed wind protection. (n) mech & photovoltaic system. replace (e) single glazed windows w/ double glazed. interior remodeling in both units | $595,000 |
| Sep 22, 2020 | Never finaled issued Nov 2021, no final | 118 Collins St | 1 story horizontal addition @ ground floor. balcony @ 2nd floor on top of horizontal addition. pedestrian rear yard access bridge. spiral stair from balcony to roof, roof deck, new entry door / window @ front facade. excavation @ rear yard, new rear yard hardscape(concrete steps & retaining walls)Details
1 story horizontal addition @ ground floor. balcony @ 2nd floor on top of horizontal addition. pedestrian rear yard access bridge. spiral stair from balcony to roof, roof deck, new entry door / window @ front facade. excavation @ rear yard, new rear yard hardscape(concrete steps & retaining walls) | $245,000 |
| Jan 7, 2019 | Completed final sign-off Apr 2025 | 3537 23rd St | 2 story vertical addition & roof decks. horizontal rear yard addition. provide new 2nd unit at 1st floor and 2nd floor, and 2nd unit @ 3rd & 4th floor. remodel front facade.Details
2 story vertical addition & roof decks. horizontal rear yard addition. provide new 2nd unit at 1st floor and 2nd floor, and 2nd unit @ 3rd & 4th floor. remodel front facade. | $700,000 |
| Nov 17, 2016 | Completed final sign-off Jul 2024 | 735 Clementina St | legalize existing unpermitted single family dwelling convert from warehouse. upgrade bathroom, kitchen, new interior finishes. improvements to roof deck, add stair to penthouse on roof. n/a maher ordinanceDetails
legalize existing unpermitted single family dwelling convert from warehouse. upgrade bathroom, kitchen, new interior finishes. improvements to roof deck, add stair to penthouse on roof. n/a maher ordinance | $187,000 |
| Jul 18, 2014 | Completed final sign-off Sep 2014 | 508 Oak St | remove top roof deck & remove attic ladder in unit #510. to comply with physical inspection report #cc-7637Details
remove top roof deck & remove attic ladder in unit #510. to comply with physical inspection report #cc-7637 | $2,000 |
| May 17, 2006 | Completed final sign-off Jul 2006 | 66 Fountain St | add new framing of lapered joist and 2x6 trex deck boards to (e) roof deck.Details
add new framing of lapered joist and 2x6 trex deck boards to (e) roof deck. | $7,000 |