547 permits since 2000: 384 completed, 82 never finaled, 81 expired or cancelled. Typically 7 days from filing to permit and 142 days from permit to final inspection. Of the 82 never-finaled permits, 4 are 3 to 5 years old, 26 are 5 to 10 years old, 52 are over 10 years old. 1 was filed but never issued.

- Based in: Point Richmond
- On San Francisco permits: Jan 2000 to Mar 2024
- Last 24 months: 0 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2000 | 24 | 0 | 0 | 7 |
| 2001 | 19 | 0 | 1 | 11 |
| 2002 | 7 | 0 | 0 | 13 |
| 2003 | 2 | 0 | 3 | 5 |
| 2004 | 35 | 0 | 6 | 22 |
| 2005 | 23 | 0 | 4 | 9 |
| 2006 | 16 | 0 | 1 | 8 |
| 2007 | 17 | 0 | 4 | 4 |
| 2008 | 19 | 0 | 4 | 0 |
| 2009 | 14 | 0 | 0 | 0 |
| 2010 | 12 | 0 | 1 | 1 |
| 2011 | 8 | 0 | 4 | 0 |
| 2012 | 18 | 0 | 3 | 0 |
| 2013 | 19 | 0 | 12 | 1 |
| 2014 | 12 | 0 | 7 | 0 |
| 2015 | 19 | 0 | 2 | 0 |
| 2016 | 17 | 0 | 1 | 0 |
| 2017 | 19 | 0 | 5 | 0 |
| 2018 | 18 | 0 | 11 | 0 |
| 2019 | 18 | 0 | 1 | 0 |
| 2020 | 7 | 0 | 0 | 0 |
| 2021 | 22 | 0 | 8 | 0 |
| 2022 | 10 | 0 | 4 | 0 |
| 2023 | 7 | 0 | 0 | 0 |
| 2024 | 2 | 0 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Bathroom remodel | 6 | 5 | 0 | 1 | 0 | 2 | 124 |
| Kitchen remodel | 5 | 4 | 0 | 1 | 0 | 29 | 202 |
| Stairs | 5 | 5 | 0 | 0 | 0 | 5 | 273 |
| Deck | 1 | 1 | 0 | 0 | 0 | 0 | 124 |

## Most recent permits

The 100 most recent of 547.

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202403228399](https://www.permitgraph.org/p/202403228399) | Mar 22, 2024 | Completed: final sign-off Apr 2024 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | revision pa# 202206247101 existing hvac system and all associated support to remain and in operation |  |
| [202401123916](https://www.permitgraph.org/p/202401123916) | Jan 12, 2024 | Completed: final sign-off Jan 2024 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | revision to pa 202206247101. change in direction of the new concrete ramp inside the suite. |  |
| [202306291137](https://www.permitgraph.org/p/202306291137) | Jun 29, 2023 | Completed: final sign-off Oct 2023 | [150 California St](https://www.permitgraph.org/a/0236/019) | 11/f: t.i. lighting fixtures, power & signal devices, ref pa# 202212228926. | $226,000 |
| [202306291139](https://www.permitgraph.org/p/202306291139) | Jun 29, 2023 | Completed: final sign-off Oct 2023 | [150 California St](https://www.permitgraph.org/a/0236/019) | 11/f: add 2-vav box & 3-transfer fans, modify & add new duct work, relocate thermostats, ref pa# 202212228926. | $175,000 |
| [202306220583](https://www.permitgraph.org/p/202306220583) | Jun 22, 2023 | Completed: final sign-off Dec 2023 | [100 Pine St](https://www.permitgraph.org/a/0262/020) | 10/f:interior t.i. non structiural demolition of interior partitions, relocate in suite, new non structural partitions & doors, proposed associated electrical, no exterior work proposed. | $171,566 |
| [202304266479](https://www.permitgraph.org/p/202304266479) | Apr 26, 2023 | Completed: final sign-off Jun 2023 | [100 Pine St](https://www.permitgraph.org/a/0262/020) | 7th f/ ste 700: add 1 new hvac & 1 transfer fan, add ceiling diffusers add/ relocate thermostals. ref 2022 1129 7292 | $44,318 |
| [202304266466](https://www.permitgraph.org/p/202304266466) | Apr 26, 2023 | Completed: final sign-off May 2023 | [100 Pine St](https://www.permitgraph.org/a/0262/020) | 7th f/ ste 700: lighting fixture and associated circuiting / controls. power and signal devices and associated wiring, ref 2022 1129 7292 | $63,432 |
| [202303073138](https://www.permitgraph.org/p/202303073138) | Mar 7, 2023 | Completed: final sign-off May 2023 | [100 Pine St](https://www.permitgraph.org/a/0262/020) | 17th fl (east) - add 1 vav & heat pump. add/relocate diffusers and r/h grills ref pa 2022-1102-5762 | $73,545 |
| [202303073135](https://www.permitgraph.org/p/202303073135) | Mar 7, 2023 | Completed: final sign-off May 2023 | [100 Pine St](https://www.permitgraph.org/a/0262/020) | 17th fl (east) - lighting fixtures and associate circuiting/controls, power and signal devices and associated wiring. ref pa 2022-1102-5762 | $84,265 |
| [202212228926](https://www.permitgraph.org/p/202212228926) | Dec 22, 2022 | Completed: final sign-off Oct 2023 | [150 California St](https://www.permitgraph.org/a/0236/019) | 11/flr (suites 1100, 1125 & 1150): ti including demo & construction of partitions, doors, ceilings, lighting, millwork, retrooms and finishes. | $657,716 |
| [202211297292](https://www.permitgraph.org/p/202211297292) | Nov 29, 2022 | Completed: final sign-off May 2023 | [100 Pine St](https://www.permitgraph.org/a/0262/020) | 7/f: interior tenant improvement including demo and construction of non structural partitions, ceilings, lighting, elec, millwork, finishes | $313,389 |
| [202211045901](https://www.permitgraph.org/p/202211045901) | Nov 4, 2022 | Never finaled: issued Dec 2022, no final | [100 Pine St](https://www.permitgraph.org/a/0262/020) | 1700: office tenant retrofit-light fixtures and associated circuiting/controls in spec suite tenant space. ref bpa#202205063673 | $127,470 |
| [202211045904](https://www.permitgraph.org/p/202211045904) | Nov 4, 2022 | Never finaled: issued Dec 2022, no final | [100 Pine St](https://www.permitgraph.org/a/0262/020) | 1700: add diffuser, registers, return grilles and new ductwork. relocate thermostats. ref 202205063673. | $35,302 |
| [202211025762](https://www.permitgraph.org/p/202211025762) | Nov 2, 2022 | Completed: final sign-off May 2023 | [100 Pine St](https://www.permitgraph.org/a/0262/020) | 17/f (east side): interior tenant improvement. demolition and construction of non-structural partitions, ceilings, lighting, electrical, millwork and finishes. mep deferred. | $616,329 |
| [202208231096](https://www.permitgraph.org/p/202208231096) | Aug 23, 2022 | Never finaled: issued Oct 2022, no final | [150 California St](https://www.permitgraph.org/a/0236/019) | 10/f: relocate 1 vav box and add 3 transfer fans. add idffusers, registeres & transfer grilles. modifty and add a new dutwork, relocate (e) thermostats, add fsd. ref ti 202106243169, 202204071782, 20… | $57,401 |
| [202208231091](https://www.permitgraph.org/p/202208231091) | Aug 23, 2022 | Completed: final sign-off Nov 2026 | [150 California St](https://www.permitgraph.org/a/0236/019) | provide lighting ti to 8035 sq feet office area. ref 202106243169/202204071782/202205204677/202201145998 | $63,420 |
| [202206247101](https://www.permitgraph.org/p/202206247101) | Jun 24, 2022 | Completed: final sign-off Apr 2024 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | complete suite vacation of an (e) telecommunication equipment faciliting in basement, removel of switch and transmission equipment, support equipment, fuel tank, emergency generator, transfer switche… | $550,000 |
| [202205204677](https://www.permitgraph.org/p/202205204677) | May 20, 2022 | Completed: final sign-off Dec 2022 | [150 California St](https://www.permitgraph.org/a/0236/019) | 10/f: rev to pa202106243169: interior t.i. to include demo and construction of partitions, dloors, ceilings, lighting, millwork and finishes. mep deferred. maher n/a. | $4,000 |
| [202205063673](https://www.permitgraph.org/p/202205063673) | May 6, 2022 | Never finaled: issued May 2022, no final | [100 Pine St](https://www.permitgraph.org/a/0262/020) | 17/f: interior tenant improvement. demolition and construction of non-structural partitions, ceilings, lighting, electrical, millwork and finishes, including restroom upgrades. | $297,062 |
| [202204071782](https://www.permitgraph.org/p/202204071782) | Apr 7, 2022 | Completed: final sign-off Dec 2022 | [150 California St](https://www.permitgraph.org/a/0236/019) | ste 1025: revision to pa# 202106243169. interior t.i. adding 1 new private office and extending conference room. fire alarm and sprinkler under sep permit, if applic. | $7,000 |
| [202201186163](https://www.permitgraph.org/p/202201186163) | Jan 18, 2022 | Completed: final sign-off May 2022 | [140 New Montgomery St](https://www.permitgraph.org/a/3722/080) | 15th flr - mech only -demo (e) ductwork per plans. relocate 3 (e) vav boxes. install 2 vav boxes. install new hws+r piping. install new distribution. ref pa# 202107234999. elec/fire/life safety defer… | $70,840 |
| [202201186119](https://www.permitgraph.org/p/202201186119) | Jan 18, 2022 | Completed: final sign-off May 2022 | [140 New Montgomery St](https://www.permitgraph.org/a/3722/080) | 15th fl - provide lighting tenant improvements to 4150 square feet of office area. ref pa 2021-0723-4999 | $31,274 |
| [202201145998](https://www.permitgraph.org/p/202201145998) | Jan 14, 2022 | Completed: final sign-off Dec 2022 | [150 California St](https://www.permitgraph.org/a/0236/019) | revision to pa# 202106243169. interior t.i. including construction of partitions, lighting & finishes for 4 additional offices. mep deferred. | $10,500 |
| [202112134252](https://www.permitgraph.org/p/202112134252) | Dec 13, 2021 | Completed: final sign-off Jan 2023 | [100 Pine St](https://www.permitgraph.org/a/0262/020) | project scope is to renovate the 27th fl of e 33 story building. renovated space will serve as an expansion suite for an existing business occupancy tenant. select demo of e interior fit ou to facili… | $1,634,222 |
| [202112073839](https://www.permitgraph.org/p/202112073839) | Dec 7, 2021 | Completed: final sign-off Mar 2022 | [150 California St](https://www.permitgraph.org/a/0236/019) | 3/f: title 24: provide lighting tenant improvements to 5,883 sq ft of office area. pa 202106172696. | $172,420 |
| [202112073884](https://www.permitgraph.org/p/202112073884) | Dec 7, 2021 | Completed: final sign-off Mar 2022 | [150 California St](https://www.permitgraph.org/a/0236/019) | 3rd floor: add (1) vav box, relocate (1) vav box and relocate 1 transfer fan. add diffuser, register, return grilles, add new ductwork, relocate existing thermostats and add (1) thermostat ref pa# 20… | $63,801 |
| [202110271245](https://www.permitgraph.org/p/202110271245) | Oct 27, 2021 | Never finaled: issued Nov 2021, no final | [100 Pine St](https://www.permitgraph.org/a/0262/020) | suite 1400: add one transfer fan/add ceiling diffusers/relocate ceiling diffusers/relocate extg thermostats and induction unit thermostats/air balancing. ref app#202107275138 | $41,220 |
| [202110271262](https://www.permitgraph.org/p/202110271262) | Oct 27, 2021 | Never finaled: issued Nov 2021, no final | [100 Pine St](https://www.permitgraph.org/a/0262/020) | suite 1400: provide lighting t.i. to 4,770 sq ft offfice space. ref bpa#202107275138 | $37,918 |
| [202110130340](https://www.permitgraph.org/p/202110130340) | Oct 13, 2021 | Never finaled: issued Oct 2021, no final | [100 Pine St](https://www.permitgraph.org/a/0262/020) | suite 3050: provide power and lighting t.i. to 3,521 sq ft of office space. ref. pa 202108096056 | $4,820 |
| [202110120253](https://www.permitgraph.org/p/202110120253) | Oct 12, 2021 | Never finaled: issued Oct 2021, no final | [100 Pine St](https://www.permitgraph.org/a/0262/020) | ste 3050, 30th fl - add 1 diffuser fan; add 5 ceiling diffusers & relocate ceiling diffusers. relocate (e) thermostats induction unit thermostats. air balance. ref pa 2021-0809-6056 | $9,020 |
| [202108096056](https://www.permitgraph.org/p/202108096056) | Aug 9, 2021 | Completed: final sign-off Jun 2022 | [100 Pine St](https://www.permitgraph.org/a/0262/020) | 3oth/f, ste 3050- t.i. selective demo and construction of non-structural, non-rated partitions, ceilings, lighting, and finishes. no structural, no increasing area or change of use. mep deferred | $234,465 |
| [202107275138](https://www.permitgraph.org/p/202107275138) | Jul 27, 2021 | Never finaled: issued Aug 2021, no final | [100 Pine St](https://www.permitgraph.org/a/0262/020) | 14th fl: interior tenant improvement including selective demo and construction of non structural, non rated partitions, ceilings, lighting and finsihes including restrooms, no structural, no increase… | $812,775 |
| [202107234999](https://www.permitgraph.org/p/202107234999) | Jul 23, 2021 | Never finaled: issued Aug 2021, no final | [140 New Montgomery St](https://www.permitgraph.org/a/3722/080) | interior ti of 15th fl demo of non bearing walls, finishes, ceilings. construction to include new partition finsihes, lighting, and 1 unisex restroom. mep deferred | $700,000 |
| [202106243169](https://www.permitgraph.org/p/202106243169) | Jun 24, 2021 | Completed: final sign-off Dec 2022 | [150 California St](https://www.permitgraph.org/a/0236/019) | 10/f: interior t.i. including demo and construction of partitions, doors, ceilings, lighting millwork and finishes. no changes in occupancy, use, or area. mep is deffered. | $657,716 |
| [202106233064](https://www.permitgraph.org/p/202106233064) | Jun 23, 2021 | Completed: final sign-off May 2022 | [100 Pine St](https://www.permitgraph.org/a/0262/020) | suite 250: add 1 vav box, relocate 1 vav box/ add difusser, register, side wall registers and new ductwork/add 1 vav thermostat, relcate vav thermostats/relocate induction unit thermostats/air balanc… | $10,233 |
| [202106172696](https://www.permitgraph.org/p/202106172696) | Jun 17, 2021 | Completed: final sign-off Mar 2022 | [150 California St](https://www.permitgraph.org/a/0236/019) | 3rd fl: interior tenant improvement including demo and construction of partitions, doors, ceilings, lighting, millwork and finishes, no structural, no change in area or occupancy, mep and fire, life… | $955,510 |
| [202106041710](https://www.permitgraph.org/p/202106041710) | Jun 4, 2021 | Completed: final sign-off Oct 2021 | [100 Pine St](https://www.permitgraph.org/a/0262/020) | suite 250: provide power & lighting tenant improvements to 9.890 sq. ft. of office area. ref pa# 202101298672 | $28,620 |
| [202106021491](https://www.permitgraph.org/p/202106021491) | Jun 2, 2021 | Completed: final sign-off May 2022 | [100 Pine St](https://www.permitgraph.org/a/0262/020) | 23/f: provide power & lighting t.i to 9890sf of office area. ref t.i. pa202101192912. maher n/a. | $41,735 |
| [202106011385](https://www.permitgraph.org/p/202106011385) | Jun 1, 2021 | Completed: final sign-off Sep 2021 | [100 Pine St](https://www.permitgraph.org/a/0262/020) | suite 2250 & common areas: add ceiling diffusers & sidewall diffusers. relocate (e) vav thermostats & relocate in thermostats air balancing. | $10,223 |
| [202105271209](https://www.permitgraph.org/p/202105271209) | May 27, 2021 | Completed: final sign-off Sep 2021 | [100 Pine St](https://www.permitgraph.org/a/0262/020) | provide power and lighting t.i. to 9890 sq ft of office area. ref app#202101152841 | $17,495 |
| [202105069930](https://www.permitgraph.org/p/202105069930) | May 6, 2021 | Never finaled: issued May 2021, no final | [100 Pine St](https://www.permitgraph.org/a/0262/020) | ste 500: electrical - provide power + lighting tenant improvements to 5,670 sqft of office areas. ref pa# 202101293673. | $8,011 |
| [202104299517](https://www.permitgraph.org/p/202104299517) | Apr 29, 2021 | Completed: final sign-off Sep 2021 | [100 Pine St](https://www.permitgraph.org/a/0262/020) | ste #2250: revision to pa# 202101152841. scope of work includes 3 new offices, new non-structural partitions, ceilings and lighting, electrical. no structural, no increase in area, no change of occup… | $7,500 |
| [202103055952](https://www.permitgraph.org/p/202103055952) | Mar 5, 2021 | Completed: final sign-off Jun 2021 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | decommission of rally's offices, includes infilling openings in the original tenant demising partitions thus returning the 3rd fl to 3 independent suites. removal & slab infill of interconnecting com… | $80,000 |
| [202101293672](https://www.permitgraph.org/p/202101293672) | Jan 29, 2021 | Completed: final sign-off Sep 2021 | [100 Pine St](https://www.permitgraph.org/a/0262/020) | 2/f suite 250: interior t.i.: demo and construction of non-structural partitions, celings, lighhting, millwork and finishes. no structural, no increase in area, no change of occupancy or use. mep, l/… | $577,246 |
| [202101293673](https://www.permitgraph.org/p/202101293673) | Jan 29, 2021 | Never finaled: issued Mar 2021, no final | [100 Pine St](https://www.permitgraph.org/a/0262/020) | 5/f suite 500 interior t.i.: demo and construction of non-structural partitions, celings, lighting, millwork and finishes. no structural, no increase in area, no change of occupancy or use. mep, l/s… | $232,306 |
| [202101213052](https://www.permitgraph.org/p/202101213052) | Jan 21, 2021 | Completed: final sign-off Aug 2021 | [150 California St](https://www.permitgraph.org/a/0236/019) | tenant improvements: provide lighting to 400 sq. ft. of office breakroom/kitchen area. ref pa 202010015683. | $20,742 |
| [202101213050](https://www.permitgraph.org/p/202101213050) | Jan 21, 2021 | Completed: final sign-off Aug 2021 | [150 California St](https://www.permitgraph.org/a/0236/019) | install split system heat pump. install new ductwork and fan coil unit, new fire smoke damper, new cpi control panel, new duct smoke detector for fsd. ref pa 202010015683. | $28,404 |
| [202101192912](https://www.permitgraph.org/p/202101192912) | Jan 19, 2021 | Completed: final sign-off May 2022 | [100 Pine St](https://www.permitgraph.org/a/0262/020) | 23rd fl - interior ti including demo and construction of non-structural partitions, ceilings, lighting & finishes. includes restroom and corridor work, no structural, no increase in area, no change o… | $991,052 |
| [202101152841](https://www.permitgraph.org/p/202101152841) | Jan 15, 2021 | Completed: final sign-off Sep 2021 | [100 Pine St](https://www.permitgraph.org/a/0262/020) | 22/f: interior tenant improvement: demo & construct non-structural partitions, ceilings, lighting & finishes. includes restroom & cooridor work. no structural, no increase of area, no change of use.… | $217,628 |
| [202101142709](https://www.permitgraph.org/p/202101142709) | Jan 14, 2021 | Completed: final sign-off May 2021 | [150 California St](https://www.permitgraph.org/a/0236/019) | 18/f: provide lighting tenant improvements to 5,222 sqft of office area. ref pa# 202010025731. | $46,782 |
| [202101142708](https://www.permitgraph.org/p/202101142708) | Jan 14, 2021 | Completed: final sign-off May 2021 | [150 California St](https://www.permitgraph.org/a/0236/019) | 18/f:relocate 2 vav's. add 1 transfer fan. add diffuser, registers, transfer grills. modify & add new ductwork. relocate (e) thermostats. air balancing. add 1 new fire smoke damper. ref pa# 202010025… | $36,440 |
| [202101142705](https://www.permitgraph.org/p/202101142705) | Jan 14, 2021 | Completed: final sign-off May 2021 | [150 California St](https://www.permitgraph.org/a/0236/019) | provide lighting tenant improvements to 8,553 sqft of office area. ref pa# 202010015636. | $53,901 |
| [202101142707](https://www.permitgraph.org/p/202101142707) | Jan 14, 2021 | Completed: final sign-off May 2021 | [150 California St](https://www.permitgraph.org/a/0236/019) | 7/f: add 1 vav box & 1 transfer fan. add diffusers, registers, return grills, & add new ductwork. connect new vav to (e) ddc controls & relocate (e) thermostats/air balancing. ref pa# 202010015636. | $43,622 |
| [202010025731](https://www.permitgraph.org/p/202010025731) | Oct 2, 2020 | Completed: final sign-off May 2021 | [150 California St](https://www.permitgraph.org/a/0236/019) | interior t.i. including non-structural demo and construction of (n) non-structural partitons, glazing, ceilings, lighting, millwork,and finishes. no change in occupancy, area or use, mep & life safet… | $680,467 |
| [202010015683](https://www.permitgraph.org/p/202010015683) | Oct 1, 2020 | Completed: final sign-off Aug 2021 | [150 California St](https://www.permitgraph.org/a/0236/019) | ground floor - new non struct partitions, ceiling & lighting, millwork and finishes, no change in occuancy area or use, mep, life safety, sprinklers under sep permit | $30,750 |
| [202010015636](https://www.permitgraph.org/p/202010015636) | Oct 1, 2020 | Completed: final sign-off May 2021 | [150 California St](https://www.permitgraph.org/a/0236/019) | 7th flr. interior tenant improvement. demo fo restroom & elevator lobby. constructin of non-structural partitions, ceilings, casework & finishes. no change in occupancy use or area. mep, life safety… | $672,516 |
| [202007019486](https://www.permitgraph.org/p/202007019486) | Jul 1, 2020 | Completed: final sign-off Sep 2020 | [150 California St](https://www.permitgraph.org/a/0236/019) | revision to pa #2019-0508-0066: addition of 1 office, electrical, lighting. addition of av monitos, card readers, cameras and power for furniture. | $41,000 |
| [202006088236](https://www.permitgraph.org/p/202006088236) | Jun 8, 2020 | Completed: final sign-off May 2021 | [100 Pine St](https://www.permitgraph.org/a/0262/020) | suite #3050: provide power and lighting tenant improvements to 4,521 sq. ft. office area. | $29,204 |
| [202002053576](https://www.permitgraph.org/p/202002053576) | Feb 5, 2020 | Completed: final sign-off Nov 2020 | [425 Market St](https://www.permitgraph.org/a/3709/014) | 15th floor. update to breakroom area and adjacent lounge, largely millwork, finish related items. removal of 3 glass doors. card readers at 3 locations throughout floor thereby opening up access to e… | $131,065 |
| [202001162019](https://www.permitgraph.org/p/202001162019) | Jan 16, 2020 | Completed: final sign-off Sep 2020 | [100 Pine St](https://www.permitgraph.org/a/0262/020) | provide power and lighting tenant improvement to 1836 sq ft of office area ref 201911278310 | $11,842 |
| [201912048597](https://www.permitgraph.org/p/201912048597) | Dec 4, 2019 | Completed: final sign-off May 2020 | [100 Pine St](https://www.permitgraph.org/a/0262/020) | 22/f: deferred mep from pa #2019-1203-8488 |  |
| [201912038488](https://www.permitgraph.org/p/201912038488) | Dec 3, 2019 | Completed: final sign-off May 2020 | [100 Pine St](https://www.permitgraph.org/a/0262/020) | ti for partial e office, includes new conf rm relocate break rm, relaxation room, new partitions deferred mep and fire protection, maher not req | $646,014 |
| [201911127053](https://www.permitgraph.org/p/201911127053) | Nov 12, 2019 | Completed: final sign-off May 2021 | [100 Pine St](https://www.permitgraph.org/a/0262/020) | ste. 3035: tenant improvement to existing office space. new non structural partitions celing tile, lighting, finishes. demo 201910174768 | $296,330 |
| [201910174768](https://www.permitgraph.org/p/201910174768) | Oct 17, 2019 | Completed: final sign-off May 2021 | [100 Pine St](https://www.permitgraph.org/a/0262/020) | suite 3035: demo of (e) non-structural partitions, lights, millwork and finishes in (e) tenant space n/a maher per ab-017. restroom demo excluded from this permit. | $23,103 |
| [201910033411](https://www.permitgraph.org/p/201910033411) | Oct 3, 2019 | Completed: final sign-off Oct 2020 | [150 California St](https://www.permitgraph.org/a/0236/019) | 8th floor: provide lighting tenant improvements to 3,625 sq ft of office space. add 1 transfer fan, 1 supply and linear diffusers. modify and add new ductwork. relocate (e) thermostats, air balance. | $62,250 |
| [201910033410](https://www.permitgraph.org/p/201910033410) | Oct 3, 2019 | Completed: final sign-off Sep 2020 | [150 California St](https://www.permitgraph.org/a/0236/019) | 8th flr. provide lighting improvements to 1,153 sq ft of office space | $11,940 |
| [201908068002](https://www.permitgraph.org/p/201908068002) | Aug 6, 2019 | Completed: final sign-off Oct 2019 | [100 Pine St](https://www.permitgraph.org/a/0262/020) | ref pa# 201906072810; provide lighting & power, t.i. to 2,007 sq fl of office space/ remove & cap unused ductwork/install 12 new vav terminal new exhuast fan for idf room | $91,225 |
| [201907256907](https://www.permitgraph.org/p/201907256907) | Jul 25, 2019 | Completed: final sign-off Jul 2020 | [100 Pine St](https://www.permitgraph.org/a/0262/020) | suite 1000: the proposed pnc layout is app. 13,500 sq ft.for a full floor tenant interior alteration including new lighting to meet t-24 requirement, nw furniture, and nw wall to accommodate | $1,300,500 |
| [201907014790](https://www.permitgraph.org/p/201907014790) | Jul 1, 2019 | Completed: final sign-off Sep 2020 | [150 California St](https://www.permitgraph.org/a/0236/019) | demo. of non structural walls, and finishes, construction of non-structural walls,plumbing, and finishes, mechanical, electrical plumbing, life safety and sprinklers to be design build under sep perm… | $181,548 |
| [201906254327](https://www.permitgraph.org/p/201906254327) | Jun 25, 2019 | Completed: final sign-off Aug 2019 | [150 California St](https://www.permitgraph.org/a/0236/019) | 2/f: provide lighting tenant improvement to 1600 sq feet of common area. ref 201810314577 | $15,200 |
| [201906133304](https://www.permitgraph.org/p/201906133304) | Jun 13, 2019 | Never finaled: issued Sep 2019, no final | [180 Howard St](https://www.permitgraph.org/a/3717/020) | voluntary seismic improvement of the floor diaphram to core wall connections at level 1. voluntary seismic improvement of the wall stability of the north and south core walls at level 1. | $82,350 |
| [201906072810](https://www.permitgraph.org/p/201906072810) | Jun 7, 2019 | Completed: final sign-off Oct 2019 | [100 Pine St](https://www.permitgraph.org/a/0262/020) | 20th fl - demo of (e) light fixtures. construction of (n) non-struc'l walls, doors and frames, light fixtures, millwork & finishes. no struc'l work to be included in scope. no increase in area. no ch… | $847,842 |
| [201906042386](https://www.permitgraph.org/p/201906042386) | Jun 4, 2019 | Completed: final sign-off Sep 2019 | [100 Pine St](https://www.permitgraph.org/a/0262/020) | provide lighting t.i. to 7450 sq ft of office space. demolish extg ductwork, diffusers, and provide new. relocate extg thermostats. provide new transfer fan for copy room. ref app#201903286512. n/a f… | $114,622 |
| [201905080066](https://www.permitgraph.org/p/201905080066) | May 8, 2019 | Completed: final sign-off Sep 2020 | [150 California St](https://www.permitgraph.org/a/0236/019) | 8th flr. demo of non-structural walls, plumb and ceiling systems. construct (n) tenant partitions incl non-structural walls, plumb & lighting. mech, electr, plumb, life safety & sprinkler to be desig… | $304,876 |
| [201904127816](https://www.permitgraph.org/p/201904127816) | Apr 12, 2019 | Completed: final sign-off Nov 2026 | [150 California St](https://www.permitgraph.org/a/0236/019) | revision to 201810304577. submittal of technical infeasibility to leave accessible toilet in place. maher n/a. |  |
| [201903286512](https://www.permitgraph.org/p/201903286512) | Mar 28, 2019 | Completed: final sign-off Sep 2019 | [100 Pine St](https://www.permitgraph.org/a/0262/020) | interior t.i. of office and related spaces, interior non-rated partitions, finishes, millwork. n/a maher mep deferred. | $560,000 |
| [201903276356](https://www.permitgraph.org/p/201903276356) | Mar 27, 2019 | Completed: final sign-off Sep 2019 | [180 Howard St](https://www.permitgraph.org/a/3717/020) | 1st fl: t.i. improvement; new non-structural partitions, light fixtures, ceiling system, power/data and finishes, mep will be provided, life safety, sprinklers under sep permit n/a maher | $1,350,000 |
| [201901110128](https://www.permitgraph.org/p/201901110128) | Jan 11, 2019 | Completed: final sign-off Jul 2019 | [150 California St](https://www.permitgraph.org/a/0236/019) | 2nd fl - provide lighting ti to 6066 sq ft of office space. add 2 vav boxes and relocate 1 transfer fan/add supply and return diffusers and add new ductwork; add 2 thermostats and relocate existing t… | $57,373 |
| [201901039524](https://www.permitgraph.org/p/201901039524) | Jan 3, 2019 | Completed: final sign-off Apr 2019 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | 2nd fl - interior tenanat improvement of partial floor. | $83,650 |
| [201811024829](https://www.permitgraph.org/p/201811024829) | Nov 2, 2018 | Completed: final sign-off Jul 2019 | [150 California St](https://www.permitgraph.org/a/0236/019) | ti on 2nd floor-non struct demo. new non struc partitions, doors, glazing, ceiling, lights, millwork, finishes. no change in area, occup or use. mep/fire/life safety under sep permit maher na | $481,140 |
| [201810314577](https://www.permitgraph.org/p/201810314577) | Oct 31, 2018 | Completed: final sign-off Aug 2019 | [150 California St](https://www.permitgraph.org/a/0236/019) | non struct demo (n) struct partitions, doors, finishes, toilet fixtures & accessories. no change in occupancy or use or area. mep, life safety, sprinklers under sep permit | $131,836 |
| [201810243967](https://www.permitgraph.org/p/201810243967) | Oct 24, 2018 | Never finaled: issued Oct 2018, no final | [100 Pine St](https://www.permitgraph.org/a/0262/020) | 21st floor: provide lighting improvements to 2,846 sq ft of office space. n/a for maher. ref app#201808137128, lighting only for this permit | $17,640 |
| [201810223782](https://www.permitgraph.org/p/201810223782) | Oct 22, 2018 | Completed: final sign-off Apr 2019 | [665 03rd St](https://www.permitgraph.org/a/3788/041) | inter ti improvement of partial (e) 3rd floor | $83,650 |
| [201810032167](https://www.permitgraph.org/p/201810032167) | Oct 3, 2018 | Completed: final sign-off Jan 2019 | [100 Pine St](https://www.permitgraph.org/a/0262/020) | 21st flr. demo duct work, relcate grilles and thermostats, install new exhaust fan, install new vav balance, rebalance vavs to values maher not req | $13,213 |
| [201809170412](https://www.permitgraph.org/p/201809170412) | Sep 17, 2018 | Never finaled: issued Sep 2018, no final | [150 California St](https://www.permitgraph.org/a/0236/019) | 9/f: relocate vav box to locatoin shown on plans. connect to supply air main/install vav box in location shown on plans. connect to supply air main. install exhaust fan, connect to (e) supply air mai… | $22,405 |
| [201809140156](https://www.permitgraph.org/p/201809140156) | Sep 14, 2018 | Never finaled: issued Sep 2018, no final | [100 Pine St](https://www.permitgraph.org/a/0262/020) | 15th fl - provide lighting ti to 1,112 sf of office space. ref pa 2018-0511-8852 | $18,105 |
| [201809140155](https://www.permitgraph.org/p/201809140155) | Sep 14, 2018 | Never finaled: issued Sep 2018, no final | [100 Pine St](https://www.permitgraph.org/a/0262/020) | non-struct partitions, doors & finishes, no change in occupancy use or area. replace 1 set of new elevator lobby doors (20 min). mep, life safety & sprinkler under sep permit | $150,555 |
| [201809140159](https://www.permitgraph.org/p/201809140159) | Sep 14, 2018 | Never finaled: issued Oct 2018, no final | [100 Pine St](https://www.permitgraph.org/a/0262/020) | 21st fl - provide lighting ti to 1,877 sf of office space. ref pa 2018-0326-4553 | $20,860 |
| [201809139942](https://www.permitgraph.org/p/201809139942) | Sep 13, 2018 | Completed: final sign-off Jan 2019 | [100 Pine St](https://www.permitgraph.org/a/0262/020) | 25th floor: provide lighting t.i. to 9,888 square feet of office space. | $67,250 |
| [201809119641](https://www.permitgraph.org/p/201809119641) | Sep 11, 2018 | Never finaled: issued Sep 2018, no final | [150 California St](https://www.permitgraph.org/a/0236/019) | #900: parcial scope office tenant retrofit. lighting, lighting controls. ref app#201803012543. new exit signage for egress path | $84,800 |
| [201808137128](https://www.permitgraph.org/p/201808137128) | Aug 13, 2018 | Completed: final sign-off Jan 2019 | [100 Pine St](https://www.permitgraph.org/a/0262/020) | 21st fl: demolition of non-structural partitions, doors, frames, floor finishes, millwork, electrical & lights. new construction non-structural partitions, doors, frames, millwork & finishes. no stru… | $237,210 |
| [201806202360](https://www.permitgraph.org/p/201806202360) | Jun 20, 2018 | Completed: final sign-off Jan 2019 | [100 Pine St](https://www.permitgraph.org/a/0262/020) | 25th fl - demo of non structural partitions, doors, frames, floor finishes, millwork, electrical, lighting & finishes. no increase in area. no change in occupancy or use. mechanical, electrical & plu… | $857,547 |
| [201806071223](https://www.permitgraph.org/p/201806071223) | Jun 7, 2018 | Completed: final sign-off Dec 2018 | [100 Pine St](https://www.permitgraph.org/a/0262/020) | 26th flr - mechanicall: demo ductwork-relocate stats & grilles. install new vavs - ductwork & grilles. install new heat pump in it room. install new 2 fire smoke dampers ref 201802232069 | $114,000 |
| [201806071227](https://www.permitgraph.org/p/201806071227) | Jun 7, 2018 | Completed: final sign-off Dec 2018 | [100 Pine St](https://www.permitgraph.org/a/0262/020) | 26th flr ref pa# 201802232069, partial- scope office tenant retrofit: wiring lighting and controls, elec t-24 | $61,000 |
| [201805179357](https://www.permitgraph.org/p/201805179357) | May 17, 2018 | Completed: final sign-off Feb 2019 | [180 Howard St](https://www.permitgraph.org/a/3717/020) | 11/f -interior ti - new partitions, ceilings, mep, existing life safety to remain | $1,300,000 |
| [201805118852](https://www.permitgraph.org/p/201805118852) | May 11, 2018 | Completed: final sign-off Feb 2019 | [100 Pine St](https://www.permitgraph.org/a/0262/020) | demolition of non structural partitions, doors, frames, floor finishes, millwork, elec, light fix. new construction non structural partitions, doors, frames, millwork and finishes. no structural incl… | $88,128 |
| [201804045526](https://www.permitgraph.org/p/201804045526) | Apr 4, 2018 | Never finaled: issued Apr 2018, no final | [180 Sansome St](https://www.permitgraph.org/a/0267/016) | demo existing partitions at front of ground floor, remove kitchen and bathroom finishes. no exterior work. comply with ab-017. | $11,720 |
| [201803264553](https://www.permitgraph.org/p/201803264553) | Mar 26, 2018 | Never finaled: issued Mar 2018, no final | [100 Pine St](https://www.permitgraph.org/a/0262/020) | suite #2150 demo of non structural partitions, doors, frames, finishes millwork, light fixs & electrical. construct non structural partitions, glazing, doors, frames, millwork & finishes. non structu… | $152,950 |
| [201803012543](https://www.permitgraph.org/p/201803012543) | Mar 1, 2018 | Completed: final sign-off Nov 2018 | [150 California St](https://www.permitgraph.org/a/0236/019) | partial remodel interior load bearing ptns, finishes, doors, reconstruct interior non bearing partitions, doors, finishes. relocated lighting, restroom upgrades, no ext work. no struct work. no hazar… | $511,400 |
| [201802232069](https://www.permitgraph.org/p/201802232069) | Feb 23, 2018 | Completed: final sign-off Dec 2018 | [100 Pine St](https://www.permitgraph.org/a/0262/020) | demo of non-struc'l partitions, doors, frames, floor finishes, millwork, electrical and light fixtures. new construction consists of non-struct'l partitions, doors, frames, millwork and finishes. no… | $857,547 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.