Back to kitchen remodel contractors
Tao's Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jan 2019 to Jun 2026
- Last 24 months
- 8 permits filed
47 permits since 2000: 35 completed, 5 in progress, 4 never finaled, 3 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
27 kitchen remodel permits: 18 completed, 3 in progress, 3 never finaled, 3 expired or cancelled. Typically 7 days from filing to permit and 278 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 25, 2026 | In progress issued Aug 2026 | 2628 Lawton St | 1st flr: add two bedroom, mudrooom, media room, family room, two bathrooms, laundry and kitchenette. 2nd flr: enclosed lightwell, recongifure interior layout with 3 bedroom, two bathroom, kitchen, living room and dining room.Details
1st flr: add two bedroom, mudrooom, media room, family room, two bathrooms, laundry and kitchenette. 2nd flr: enclosed lightwell, recongifure interior layout with 3 bedroom, two bathroom, kitchen, living room and dining room. | $60,000 |
| Sep 5, 2025 | In progress issued Sep 2025 | 1566 23rd Av | add two bedrooms and two bathroom, a kitchenette, a media room on 1st flr. relocate the laundry unit, install a new furnance and water heater, remove walls at the living, dining, and kitchen areas on the 2nd floor to create an open layout, convert the existing bathroom into two full bathrooms,Details
add two bedrooms and two bathroom, a kitchenette, a media room on 1st flr. relocate the laundry unit, install a new furnance and water heater, remove walls at the living, dining, and kitchen areas on the 2nd floor to create an open layout, convert the existing bathroom into two full bathrooms, | $160,000 |
| Aug 26, 2025 | Completed final sign-off Apr 2026 | 1441 Cayuga Av | construct 2 bedrooms, 2 full baths, wet bar, family room, and kitchenette on 1st fl. install new furnace, water heater. relocate laundry unit. remove non bearing wall on the 2nd fl to accomodate 2 full baths and 2 skylights.remodel kitchen, convert dining room into bedroom, relocate front entrance.Details
construct 2 bedrooms, 2 full baths, wet bar, family room, and kitchenette on 1st fl. install new furnace, water heater. relocate laundry unit. remove non bearing wall on the 2nd fl to accomodate 2 full baths and 2 skylights.remodel kitchen, convert dining room into bedroom, relocate front entrance. | $60,000 |
| Jul 14, 2025 | Completed final sign-off Apr 2026 | 1441 Cayuga Av | kitchen remodel in-kind on 2nd floor. no moving walls. fixtures to remain in the same location. approx. 120 sq ft.Details
kitchen remodel in-kind on 2nd floor. no moving walls. fixtures to remain in the same location. approx. 120 sq ft. | $15,000 |
| Nov 26, 2024 | Completed final sign-off Sep 2025 | 329 Grafton Av | revision to: 202403147782. 1st flr: relocate laundry units, hall bath, and kitchenette. add a window in each bedroom. 2nd flr: new deck at the rear at the rear of the bldging. enclose dining room to locate additional wall space in the living room. remove pocket door in the kitchen.Details
revision to: 202403147782. 1st flr: relocate laundry units, hall bath, and kitchenette. add a window in each bedroom. 2nd flr: new deck at the rear at the rear of the bldging. enclose dining room to locate additional wall space in the living room. remove pocket door in the kitchen. | $30,000 |
| Nov 25, 2024 | In progress issued Nov 2024 | 538 Brunswick St | kitchen remodel in-kind on upper level.Details
kitchen remodel in-kind on upper level. | $40,000 |
| Oct 7, 2024 | Completed final sign-off Dec 2025 | 1047 Plymouth Av | 1st fl convert 1st fl access door to window, relocate door, add 2 bedrooms, 2 bath, entertainment area, kitchenette, replace garage door. upgrade elec service to 125 ampe, new front stair and replace stone veneer w stucco. 2nd fl reconfigure layout w 2 bedrooms,2 bath, kitchen, dining living area.Details
1st fl convert 1st fl access door to window, relocate door, add 2 bedrooms, 2 bath, entertainment area, kitchenette, replace garage door. upgrade elec service to 125 ampe, new front stair and replace stone veneer w stucco. 2nd fl reconfigure layout w 2 bedrooms,2 bath, kitchen, dining living area. | $180,000 |
| May 9, 2024 | Completed final sign-off Aug 2024 | 624 Randolph St | unit 624 and 626: kitchen and 3-fixture bath. remodel in kind at both units. no structural alteration. tot of 2 kitchen and 2 bath remodels.Details
unit 624 and 626: kitchen and 3-fixture bath. remodel in kind at both units. no structural alteration. tot of 2 kitchen and 2 bath remodels. | $50,000 |
| Apr 23, 2024 | Completed final sign-off Apr 2024 | 1043 Plymouth Av | revision to pa# 202305117543: 1/f- rearrange the interior stairs, relocate the entry door of bedroom #2 and change the size/style of the window in bedroom #2 and #3. 2/f- rearrange kitchen appliances, redesign the bathroom layout, and adjust the placement of the bedroom entry doors. close off 3 sideDetails
revision to pa# 202305117543: 1/f- rearrange the interior stairs, relocate the entry door of bedroom #2 and change the size/style of the window in bedroom #2 and #3. 2/f- rearrange kitchen appliances, redesign the bathroom layout, and adjust the placement of the bedroom entry doors. close off 3 side | |
| Mar 14, 2024 | Completed final sign-off Sep 2025 | 329 Grafton Av | upgrading the first floor's electrical service to 125 amps, adding two bedrooms, an entertainment area, a two burner kitchenette, and a full bath. on the 2/f, (n) full bath with a skylight, remodel two (e) bath. and relocation of the master bedroom entry. add (n) skylight and two windows replacementDetails
upgrading the first floor's electrical service to 125 amps, adding two bedrooms, an entertainment area, a two burner kitchenette, and a full bath. on the 2/f, (n) full bath with a skylight, remodel two (e) bath. and relocation of the master bedroom entry. add (n) skylight and two windows replacement | $105,000 |
| Jul 11, 2023 | Completed final sign-off Apr 2025 | 5624 Fulton St | 1f)garage door replace in-kind, upgrade electrical service to 125amps, add 2-bedrm, 2-full baths & 1-media rm, 2f)replace front facade windows in-kind, enclose west & east side lightwell, reconfigure interior layout w/2bedrms, 2-baths, a kitchen, dining & living area. 3f reconfiguire master suite,Details
1f)garage door replace in-kind, upgrade electrical service to 125amps, add 2-bedrm, 2-full baths & 1-media rm, 2f)replace front facade windows in-kind, enclose west & east side lightwell, reconfigure interior layout w/2bedrms, 2-baths, a kitchen, dining & living area. 3f reconfiguire master suite, | $180,000 |
| Dec 6, 2022 | Never finaled issued Dec 2022, no final | 8 Knott Ct | kitchen remodel- in kind: no structural work, no framing modification.Details
kitchen remodel- in kind: no structural work, no framing modification. | $15,000 |
| Oct 24, 2022 | Completed final sign-off Sep 2025 | 346 Byxbee St | 1st fl. 1) add gym and offi, (2) 3-fixture baths & a media rm. 2) replace ext. stair in-kind due to dryrot. 3) replace garage door. 2nd fl. 4) reconfigure int. layout with (3) bedrooms, (2) 3-fixture baths, (1) kitchen, dining & living rm. 5) enclose two story lightwell on soutDetails
1st fl. 1) add gym and offi, (2) 3-fixture baths & a media rm. 2) replace ext. stair in-kind due to dryrot. 3) replace garage door. 2nd fl. 4) reconfigure int. layout with (3) bedrooms, (2) 3-fixture baths, (1) kitchen, dining & living rm. 5) enclose two story lightwell on sout | $95,000 |
| Sep 26, 2022 | Expired or cancelled cancelled Oct 2022 | 346 Byxbee St | bathroom (3-fixture) & kitchen remodel in kind on 2nd floor. no structural work. no framing modification.Details
bathroom (3-fixture) & kitchen remodel in kind on 2nd floor. no structural work. no framing modification. | $25,000 |
| Sep 23, 2022 | Completed final sign-off Mar 2023 | 450 Amherst St | 2/f relocate kitchen, remodel 1 bath, and add 1 bathroom and bedroom.Details
2/f relocate kitchen, remodel 1 bath, and add 1 bathroom and bedroom. | $40,000 |
| Jul 27, 2022 | Completed final sign-off Apr 2023 | 115 Clearfield Dr | revision to pa# 202202047392. 1st fl bathroom change from shower to bath tub. 2nd fl kitchen remodel & 3 new skylights, flat roof.Details
revision to pa# 202202047392. 1st fl bathroom change from shower to bath tub. 2nd fl kitchen remodel & 3 new skylights, flat roof. | $1,000 |
| Feb 4, 2022 | Completed final sign-off Apr 2023 | 115 Clearfield Dr | 1st fl: add 2 bedrooms, family room & 2 full bath. 2nd fl: remove kitchen, bathroom, & bedrooms, add 1 full bath.Details
1st fl: add 2 bedrooms, family room & 2 full bath. 2nd fl: remove kitchen, bathroom, & bedrooms, add 1 full bath. | $110,000 |
| Jul 15, 2021 | Completed final sign-off May 2022 | 204 Russia Av | revision to bpa# 201306240285. 1st fl: add media, mudroom & 1 full bath. 2nd fl: reconfigure kitchen layout. 3rd fl: remodel bedroom and bathrs & add 1 bedroom. address complaint #2021179115Details
revision to bpa# 201306240285. 1st fl: add media, mudroom & 1 full bath. 2nd fl: reconfigure kitchen layout. 3rd fl: remodel bedroom and bathrs & add 1 bedroom. address complaint #2021179115 | $50,000 |
| May 10, 2021 | Expired or cancelled cancelled Dec 2021 | 355 Ney St | remode bathrom and kitchen in kind - 40 sf and 100 sf respectively. no structural work, no framing modification.Details
remode bathrom and kitchen in kind - 40 sf and 100 sf respectively. no structural work, no framing modification. | $28,000 |
| Dec 10, 2020 | Completed final sign-off Nov 2021 | 800 Madrid St | 1st flr: add 2 bedrooms, 2 bath & media room. 2nd flr: remodel kitchen, dining, bedroom, & bath. add deck at rear. relocate interior stairs. replace all windows in-kind.Details
1st flr: add 2 bedrooms, 2 bath & media room. 2nd flr: remodel kitchen, dining, bedroom, & bath. add deck at rear. relocate interior stairs. replace all windows in-kind. | $90,000 |
| Dec 4, 2020 | Never finaled issued Dec 2020, no final | 800 Madrid St | remodel (1) bathroom (52 sq. ft.) & kitchen (149 sq.ft.), no change in layout of walls/openingsDetails
remodel (1) bathroom (52 sq. ft.) & kitchen (149 sq.ft.), no change in layout of walls/openings | $30,000 |
| Oct 26, 2020 | Completed final sign-off Jul 2023 | 47 Miramar Av | remodel kitchen (123 sf) and 1 bath (43 sf)Details
remodel kitchen (123 sf) and 1 bath (43 sf) | $25,000 |
| Feb 18, 2020 | Completed final sign-off Apr 2021 | 985 Capitol Av | upgrade all rooms, remodel extg kitchen, bath room, and add one bath room. all work at 2nd floor.Details
upgrade all rooms, remodel extg kitchen, bath room, and add one bath room. all work at 2nd floor. | $45,000 |
| Aug 20, 2019 | Never finaled issued Sep 2019, no final | 637 London St | 1st flr - infill at rear add 1 bedroom, 1 full bath, family rm and office, new patio. 2nd flr - remodel kitchen and 1 full bath, reconfigure interior stairs. 3rdf lr - remodel bath add 1 full bathDetails
1st flr - infill at rear add 1 bedroom, 1 full bath, family rm and office, new patio. 2nd flr - remodel kitchen and 1 full bath, reconfigure interior stairs. 3rdf lr - remodel bath add 1 full bath | $85,000 |
| Aug 12, 2019 | Expired or cancelled cancelled Feb 2020 | 1419 22nd Av | remodel kitchen (150sf) and 2 baths (85sf). no alteration of wall, windows and doors.Details
remodel kitchen (150sf) and 2 baths (85sf). no alteration of wall, windows and doors. | $45,000 |
| Jun 3, 2019 | Completed final sign-off Mar 2020 | 1026 Plymouth Av | 1st floor: add 2 bedrooms, 2 baths, 1 office, 1 media and laundry. 2nd floor: relocate kitchen and bath. new deck at rear and infill. replace front window in kind with aluminum clad wood wndws & repair front stairs.Details
1st floor: add 2 bedrooms, 2 baths, 1 office, 1 media and laundry. 2nd floor: relocate kitchen and bath. new deck at rear and infill. replace front window in kind with aluminum clad wood wndws & repair front stairs. | $85,000 |
| Jan 25, 2019 | Completed final sign-off Sep 2019 | 2227 34th Av | infill center light well. reconfigure 2nd fl kitchen and stair, remodel e bath and add 1 new bath. add 2 bedrooms, 2 baths, 1 media room at garage, new deck at rearDetails
infill center light well. reconfigure 2nd fl kitchen and stair, remodel e bath and add 1 new bath. add 2 bedrooms, 2 baths, 1 media room at garage, new deck at rear | $88,888 |