# Talbco Development Corp Dba Supreme Buil

Contractor license 950611. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/talbco-development-corp-dba-supreme-buil-950611
- JSON: https://www.permitgraph.org/api/contractor?license=950611
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=950611

21 permits since 2000: 18 completed, 3 never finaled. Typically 128 days from filing to permit and 332 days from permit to final inspection. Of the 3 never-finaled permits, 3 are 5 to 10 years old. 1 was filed but never issued.

- Based in: San Francisco
- On San Francisco permits: Aug 2015 to Feb 2021
- Last 24 months: 0 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2015 | 1 | 0 | 0 | 0 |
| 2016 | 1 | 0 | 0 | 0 |
| 2017 | 1 | 0 | 1 | 0 |
| 2018 | 8 | 0 | 0 | 0 |
| 2019 | 2 | 0 | 0 | 0 |
| 2020 | 5 | 0 | 1 | 0 |
| 2021 | 0 | 0 | 1 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Stairs | 2 | 2 | 0 | 0 | 0 | 264 | 346 |
| Kitchen remodel | 1 | 1 | 0 | 0 | 0 | 224 | 287 |
| Roof deck | 1 | 1 | 0 | 0 | 0 | 512 | 533 |
| Bathroom remodel | 4 | 3 | 0 | 1 | 0 | 286 | 226 |
| Deck | 2 | 2 | 0 | 0 | 0 | 350 | 210 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202102174761](https://www.permitgraph.org/p/202102174761) | Feb 17, 2021 | Never finaled: issued Apr 2021, no final | [4630 19th St](https://www.permitgraph.org/a/2700/026) | interior remodel of 1/f including new half bathroom and closet. replace 3 (e) windows with new clad wood units by marvin (building front facade). same size. | $14,000 |
| [202011189204](https://www.permitgraph.org/p/202011189204) | Nov 18, 2020 | Completed: final sign-off Feb 2023 | [1725 Kearny St](https://www.permitgraph.org/a/0061/041) | perform voluntary seismic upgrade. | $90,000 |
| [202010277541](https://www.permitgraph.org/p/202010277541) | Oct 27, 2020 | Completed: final sign-off Jan 2023 | [1725 Kearny St](https://www.permitgraph.org/a/0061/041) | common area.front facade water damage repair including:remove(e)vinyl louvers and replace w/(n)painted alum.louvers.replace(e)damaged wood guardrail walls with wood.replace(e)rotted wood and glass sc… | $90,000 |
| [202009023257](https://www.permitgraph.org/p/202009023257) | Sep 2, 2020 | Completed: final sign-off Oct 2020 | [83 Farnsworth Ln](https://www.permitgraph.org/a/2641/035) | add new full bathroom on 2nd story. no structural work. | $15,000 |
| [202007069598](https://www.permitgraph.org/p/202007069598) | Jul 6, 2020 | Completed: final sign-off Jul 2020 | [2104 Hayes St](https://www.permitgraph.org/a/1193/009) | administrative permit to revise pa 2018-0223-2088 to remove 3 ada restrooms from scope of work (now under pa 2020-0218-4642) and removal of 3 formally proposed fire rated windows |  |
| [202002245220](https://www.permitgraph.org/p/202002245220) | Feb 24, 2020 | Never finaled: filed Feb 2020, never issued | [359 Hyde St](https://www.permitgraph.org/a/0335/001) | remove (e) accessibliity obstructions at store entrances (3) at 601/609/611 ellis street side. to comply with accessible business entrance program per oridnance 51-16. | $45,000 |
| [202002184642](https://www.permitgraph.org/p/202002184642) | Feb 18, 2020 | Completed: final sign-off Nov 2020 | [2112 Hayes St](https://www.permitgraph.org/a/1193/009) | connect & change of use b occupancy into e occupancy (ground floor only). interior ti for pre-school. new 45 min. fire rated window in (e) door opening. mechanical, electrical & plumbing under separa… | $200,000 |
| [201909030438](https://www.permitgraph.org/p/201909030438) | Sep 3, 2019 | Completed: final sign-off Feb 2020 | [359 Hyde St](https://www.permitgraph.org/a/0335/001) | repair and/or replace & repaint select stair treads and railings that have rusted. | $50,000 |
| [201903205818](https://www.permitgraph.org/p/201903205818) | Mar 20, 2019 | Completed: final sign-off Jan 2022 | [2731 California St](https://www.permitgraph.org/a/1027/041) | new room addtion of 206 sf @ nd fl level. install new bath. repair damaged roof deck & exterior stair & install (n) waterproofing. **maher n/a** | $100,000 |
| [201809079375](https://www.permitgraph.org/p/201809079375) | Sep 7, 2018 | Completed: final sign-off Jun 2020 | [2104 Hayes St](https://www.permitgraph.org/a/1193/009) | commercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential soft story under pa 201809059209 | $38,250 |
| [201809059209](https://www.permitgraph.org/p/201809059209) | Sep 5, 2018 | Completed: final sign-off Dec 2019 | [2104 Hayes St](https://www.permitgraph.org/a/1193/009) | residential - soft story retrofit to comply with 2016 sfebc chapter 4d gbased on 2016 cebc appendix a4 criteria. commercial soft story under pa 201809079375 | $83,000 |
| [201806040870](https://www.permitgraph.org/p/201806040870) | Jun 4, 2018 | Completed: final sign-off Jun 2020 | [1390 Market St](https://www.permitgraph.org/a/0813/010) | change of use ti to (e) vacant retail (m) to a virtual gym (a-3). constuction of non-bearing interior partitions walls, ceilings, restrooms, interior lights, electrical systems, hvac systems. plumbin… | $500,000 |
| [201805240052](https://www.permitgraph.org/p/201805240052) | May 24, 2018 | Completed: final sign-off Oct 2019 | [462 Gold Mine Dr](https://www.permitgraph.org/a/7527/017) | convert (e) 2nd level of 4-story sfh into accessory dwelling unit per ord 95-17. (n) adu: unit b add kitchen on 2nd level. (n) dishwasher. no exterior work. no structural work. no work visible from s… | $15,000 |
| [201804267484](https://www.permitgraph.org/p/201804267484) | Apr 26, 2018 | Completed: final sign-off May 2019 | [219 Brannan St](https://www.permitgraph.org/a/3789/552) | remodel of existing single level residence on 4th fl of high rise building. work to include dmeo of non-structural partitions, new finishes & replacement of plumbing and lighting fixtures. no work vi… | $100,000 |
| [201804267489](https://www.permitgraph.org/p/201804267489) | Apr 26, 2018 | Completed: final sign-off Nov 2018 | [464 Gold Mine Dr](https://www.permitgraph.org/a/7527/017) | revision to #201605026299. revised demo & proposed level 2 fl plan, remove guardrail & rear deck from scope of work, revised reflected ceiling plan on all lvls, revised power & data plan on lvls 2,3,… |  |
| [201802232088](https://www.permitgraph.org/p/201802232088) | Feb 23, 2018 | Completed: final sign-off Oct 2020 | [2104 Hayes St](https://www.permitgraph.org/a/1193/009) | renovations to the ground flr commercial spaces of an (e) 3-story mixed use bldg in an nc-1 zoning district. the scope of work includes interior renovations, renovation of the facade w/ sprinkler sys… | $185,000 |
| [201801259555](https://www.permitgraph.org/p/201801259555) | Jan 25, 2018 | Completed: final sign-off Jun 2018 | [619 Sansome St](https://www.permitgraph.org/a/0196/002) | tenant improvement for retail clothing store. removal and construction of non structural walls, fininishes, light fixtures. no change to existing plumbing or mechanical. maher not req | $120,000 |
| [201712136357](https://www.permitgraph.org/p/201712136357) | Dec 13, 2017 | Completed: final sign-off Jan 2022 | [2011 Sacramento St](https://www.permitgraph.org/a/0640/017) | add two new adu's to the rear of the building at ground floor. ordinance 162-16 | $40,000 |
| [201709290004](https://www.permitgraph.org/p/201709290004) | Sep 29, 2017 | Never finaled: issued Sep 2017, no final | [1301 40th Av](https://www.permitgraph.org/a/1795/001) | replace 9 circuit breaker panels in first floor electrical room. | $5,000 |
| [201605026299](https://www.permitgraph.org/p/201605026299) | May 2, 2016 | Completed: final sign-off Nov 2018 | [464 Gold Mine Dr](https://www.permitgraph.org/a/7527/017) | remodel (e) deck at level 3. new rear yard deck less than 10' high within buildable area, & add shower to full bath, & add living, mud room @ level 2. no work visible from street, no sprinkler or fir… | $80,000 |
| [201508134123](https://www.permitgraph.org/p/201508134123) | Aug 13, 2015 | Completed: final sign-off Oct 2022 | [130 Cole St](https://www.permitgraph.org/a/1194/018) | soft story upgrade of 1st floor per ab106 per sfbc chapter 34b | $47,700 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/talbco-development-corp-dba-supreme-buil-950611.
