# Tai Shan Construction

Contractor license 527952. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/tai-shan-construction-527952
- JSON: https://www.permitgraph.org/api/contractor?license=527952
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=527952

36 permits since 2000: 34 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 97 days from permit to final inspection. Of the 1 never-finaled permit, 1 is 5 to 10 years old.

- Based in: Millbrae
- On San Francisco permits: Feb 2000 to Apr 2023
- Last 24 months: 0 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2000 | 4 | 0 | 0 | 0 |
| 2001 | 1 | 0 | 0 | 0 |
| 2002 | 1 | 0 | 0 | 0 |
| 2003 | 2 | 0 | 0 | 0 |
| 2004 | 1 | 0 | 0 | 0 |
| 2005 | 1 | 0 | 0 | 0 |
| 2006 | 3 | 0 | 0 | 0 |
| 2007 | 3 | 0 | 0 | 0 |
| 2008 | 1 | 0 | 0 | 1 |
| 2009 | 5 | 0 | 0 | 0 |
| 2011 | 2 | 0 | 0 | 0 |
| 2012 | 1 | 0 | 0 | 0 |
| 2013 | 1 | 0 | 0 | 0 |
| 2014 | 2 | 0 | 0 | 0 |
| 2016 | 1 | 0 | 0 | 0 |
| 2017 | 2 | 0 | 0 | 0 |
| 2020 | 0 | 0 | 1 | 0 |
| 2023 | 3 | 0 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Stairs | 5 | 5 | 0 | 0 | 0 | 0 | 82 |
| Bathroom remodel | 18 | 17 | 0 | 0 | 1 | 0 | 131 |
| Kitchen remodel | 10 | 10 | 0 | 0 | 0 | 0 | 100 |
| Deck | 2 | 2 | 0 | 0 | 0 | 46 | 19 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202304256399](https://www.permitgraph.org/p/202304256399) | Apr 25, 2023 | Completed: final sign-off Aug 2023 | [794 Arguello Bl](https://www.permitgraph.org/a/1167/019) | remodel one kitchen, replace cabinet, sink, tiles, countertop. non structural | $10,000 |
| [202304115445](https://www.permitgraph.org/p/202304115445) | Apr 11, 2023 | Completed: final sign-off Aug 2023 | [2010 Balboa St](https://www.permitgraph.org/a/1564/018) | minor layout change of accessible restroom to pa# 202302031341. to coply with filed inspector's request to document change. |  |
| [202302031341](https://www.permitgraph.org/p/202302031341) | Feb 3, 2023 | Completed: final sign-off Aug 2023 | [2010 Balboa St](https://www.permitgraph.org/a/1564/018) | abe compliance per ord no 51-16. abe 20301316126 new power door equipment and door operators, convert e restroom into ada restroom, create recycle storage room | $20,000 |
| [202008202224](https://www.permitgraph.org/p/202008202224) | Aug 20, 2020 | Never finaled: issued Aug 2020, no final | [531 35th Av](https://www.permitgraph.org/a/1509/005) | replace (8) windows total : (2) wood window are visible from street. (6) composite windows are not visible from street. all work in kind. | $2,000 |
| [201708154927](https://www.permitgraph.org/p/201708154927) | Aug 15, 2017 | Completed: final sign-off Jul 2018 | [2349 26th Av](https://www.permitgraph.org/a/2355/001K) | comply w/ nov #201785901. legalize dwelling unit (unit b) on 1st fl by legalized as built kitchen per plan. unit included (2) bedroom, (2) bathrooms, living room & kitchen per unit legalization ordin… | $20,000 |
| [201701127086](https://www.permitgraph.org/p/201701127086) | Jan 12, 2017 | Completed: final sign-off Jun 2017 | [201 Holloway Av](https://www.permitgraph.org/a/6981/001) | remodel kitchen & bathroom. like for like. no change to wall locations or addition of new walls. | $34,000 |
| [201609309323](https://www.permitgraph.org/p/201609309323) | Sep 30, 2016 | Completed: final sign-off Nov 2016 | [838 Anza St](https://www.permitgraph.org/a/1085/039) | unit 201: replace sink, faucet, tile floor, bath, toilet; no walls moved/removed/added/infilled; all (e) layouts to remain unchanged. | $3,000 |
| [201405307151](https://www.permitgraph.org/p/201405307151) | May 30, 2014 | Completed: final sign-off Nov 2014 | [1845 Judah St](https://www.permitgraph.org/a/1830/034) | new bedroom & two bathrooms @ 1st floor. new fence at rear yard. | $26,000 |
| [201403039723](https://www.permitgraph.org/p/201403039723) | Mar 3, 2014 | Completed: final sign-off Jun 2014 | [1845 Judah St](https://www.permitgraph.org/a/1830/034) | change front/back windows with fiberglass wood clad windows. remodel kitchen.change the service pannel | $10,600 |
| [201303121965](https://www.permitgraph.org/p/201303121965) | Mar 12, 2013 | Completed: final sign-off Apr 2013 | [219 Prague St](https://www.permitgraph.org/a/6095/024E) | window replacements 96), aluminum windows. comply with egress windows requirement. | $1,000 |
| [201204097944](https://www.permitgraph.org/p/201204097944) | Apr 9, 2012 | Completed: final sign-off Jun 2012 | [138 Beaumont Av](https://www.permitgraph.org/a/1136/014) | remodel kitchen & bathroom. lighting will comply w/t-24. | $5,000 |
| [201108122354](https://www.permitgraph.org/p/201108122354) | Aug 12, 2011 | Completed: final sign-off Oct 2011 | [3022 Octavia St](https://www.permitgraph.org/a/0505/008) | remodel the bathroom, change sink, toilet and bath tub at 3rd floor. no new lighting. no structural work. | $5,000 |
| [201103111932](https://www.permitgraph.org/p/201103111932) | Mar 11, 2011 | Completed: final sign-off Jun 2011 | [25 Wayne Pl](https://www.permitgraph.org/a/0159/028A) | work to be done at 25 wayne place: remodel bathroom - replace fixtures. no relocation of any fixtures. remodel kitchen less than 50% repair, replace fixtures/cabinets. no relocation of any fixtures.… | $20,000 |
| [200912243850](https://www.permitgraph.org/p/200912243850) | Dec 24, 2009 | Completed: final sign-off Dec 2010 | [2275 35th Av](https://www.permitgraph.org/a/2314/016) | add new bedrooms and bathrooms at first floor. | $30,000 |
| [200907243435](https://www.permitgraph.org/p/200907243435) | Jul 24, 2009 | Completed: final sign-off Jan 2010 | [2347 26th Av](https://www.permitgraph.org/a/2355/001K) | legalize (e) bath room and family room. add two bedrooms and bath room on first floor as per plan. | $56,000 |
| [200907172918](https://www.permitgraph.org/p/200907172918) | Jul 17, 2009 | Completed: final sign-off Sep 2009 | [152 Seal Rock Dr](https://www.permitgraph.org/a/1481/012) | kitchen remodel, replace sink & top only. no other work. | $5,000 |
| [200904136163](https://www.permitgraph.org/p/200904136163) | Apr 13, 2009 | Completed: final sign-off Jul 2009 | [554 25th Av](https://www.permitgraph.org/a/1520/025) | legalize (e) deck @ rear yard. | $5,000 |
| [200903264959](https://www.permitgraph.org/p/200903264959) | Mar 26, 2009 | Completed: final sign-off Jul 2009 | [554 25th Av](https://www.permitgraph.org/a/1520/025) | work at unit 554: legalize existing bathroom and new sink in social room at 1st floor | $10,900 |
| [200811247255](https://www.permitgraph.org/p/200811247255) | Nov 24, 2008 | Expired or cancelled: cancelled Aug 2022 | [2239 37th Av](https://www.permitgraph.org/a/2312/007) | to comply w/ nov 200873034, add one bathroom at2nd fl. | $3,000 |
| [200809192121](https://www.permitgraph.org/p/200809192121) | Sep 19, 2008 | Completed: final sign-off Jan 2009 | [2239 37th Av](https://www.permitgraph.org/a/2312/007) | new family room and laundry area to be constructed at ground floor. replace (e) rear window with new. relocate full bath next to stairs at g/f, see complaint #200873034. | $28,000 |
| [200711148177](https://www.permitgraph.org/p/200711148177) | Nov 14, 2007 | Completed: final sign-off Dec 2007 | [576 Bowdoin St](https://www.permitgraph.org/a/5932/010) | legalize storage rooms at 1st floor. complaint #200796883. | $15,000 |
| [200704048065](https://www.permitgraph.org/p/200704048065) | Apr 4, 2007 | Completed: final sign-off Nov 2007 | [576 Bowdoin St](https://www.permitgraph.org/a/5932/010) | remodel the bathroom.one bathroom new sink to comply with nov 200796883. new toilet repair damage portion of garage door at bottom. repair defected wall finish i bedroom and paint for previously comp… | $9,000 |
| [200702264853](https://www.permitgraph.org/p/200702264853) | Feb 26, 2007 | Completed: final sign-off Jun 2007 | [1635 Plymouth Av](https://www.permitgraph.org/a/3080/006) | remodel the bathroom one bathroom: new sink, toilet, jacuzzi @ 2nd floor. | $5,000 |
| [200610023852](https://www.permitgraph.org/p/200610023852) | Oct 2, 2006 | Completed: final sign-off Dec 2006 | [150 Seal Rock Dr](https://www.permitgraph.org/a/1481/012) | remodel the kitchen and bathroom. replace cabinets, countertops, wall and floor tile. | $5,000 |
| [200610023855](https://www.permitgraph.org/p/200610023855) | Oct 2, 2006 | Completed: final sign-off Jan 2007 | [1600 Lombard St](https://www.permitgraph.org/a/0496/019) | remodel the 1 kitchen and 1 bathroom. no structural work. | $10,000 |
| [200606234908](https://www.permitgraph.org/p/200606234908) | Jun 23, 2006 | Completed: final sign-off Aug 2007 | [1675 21st Av](https://www.permitgraph.org/a/1922/016) | basement renovation; (n) bath 2 , (n) bedrm, (n) study, (n) failyroom, (n)playrm, new partition non bearing walls built on existing slab | $30,000 |
| [200505031516](https://www.permitgraph.org/p/200505031516) | May 3, 2005 | Completed: final sign-off Jun 2005 | [2026 Clement St](https://www.permitgraph.org/a/1412/018) | repair stucco in front of house | $15,000 |
| [200411098870](https://www.permitgraph.org/p/200411098870) | Nov 9, 2004 | Completed: final sign-off Nov 2004 | [21 Wayne Pl](https://www.permitgraph.org/a/0159/028A) | repair exterior stairway less than 25% in kind | $1,500 |
| [200311130084](https://www.permitgraph.org/p/200311130084) | Nov 13, 2003 | Completed: final sign-off Jun 2004 | [1295 38th Av](https://www.permitgraph.org/a/1712/003A) | remodel two kitchen and two bathrooms | $20,000 |
| [200310097030](https://www.permitgraph.org/p/200310097030) | Oct 9, 2003 | Completed: final sign-off Nov 2003 | [4220 Cesar Chavez St](https://www.permitgraph.org/a/6562/046) | rev. appl#200209307745 to increase scope work to repair decks and post for complaint#200231844, | $5,000 |
| [200209307745](https://www.permitgraph.org/p/200209307745) | Sep 30, 2002 | Completed: final sign-off Dec 2002 | [4220 Cesar Chavez St](https://www.permitgraph.org/a/6562/046) | repair all the railings at balconies to comply with his#200231844 | $5,000 |
| [200101089422](https://www.permitgraph.org/p/200101089422) | Jan 8, 2001 | Completed: final sign-off Apr 2001 | [1217 Geneva Av](https://www.permitgraph.org/a/6404/015) | remodel vacant store into an ice cream & candy shop | $3,000 |
| [200009281862](https://www.permitgraph.org/p/200009281862) | Sep 28, 2000 | Completed: final sign-off Oct 2000 | [31 West View Av](https://www.permitgraph.org/a/5899/047) | repair front side stair way | $1,000 |
| [200009180800](https://www.permitgraph.org/p/200009180800) | Sep 18, 2000 | Completed: final sign-off Jun 2002 | [1186 South Van Ness Av](https://www.permitgraph.org/a/3637/016) | correct to conform orig designed the archit plans w/the struct plans revise to ap #9911447 per plans | $500 |
| [200002172165](https://www.permitgraph.org/p/200002172165) | Feb 17, 2000 | Completed: final sign-off May 2000 | [4220 Cesar Chavez St](https://www.permitgraph.org/a/6562/046) | repair porch damaged, less than 50% repair in -kind |  |
| [200002101506](https://www.permitgraph.org/p/200002101506) | Feb 10, 2000 | Completed: final sign-off May 2000 | [1211 Scott St](https://www.permitgraph.org/a/1127/003) | repair damaged stairs, handrail landing & stringer with pressure tread wood in kind | $1,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/tai-shan-construction-527952.
