# T C B   Builders Inc

Contractor license 403761. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/t-c-b-builders-inc-403761
- JSON: https://www.permitgraph.org/api/contractor?license=403761
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=403761

146 permits since 2000: 100 completed, 19 never finaled, 27 expired or cancelled. Typically 19 days from filing to permit and 130 days from permit to final inspection. Of the 19 never-finaled permits, 2 are 5 to 10 years old, 17 are over 10 years old.

- Based in: San Francisco
- On San Francisco permits: Feb 2000 to May 2021
- Last 24 months: 0 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2000 | 4 | 0 | 0 | 9 |
| 2001 | 8 | 0 | 0 | 8 |
| 2002 | 2 | 0 | 0 | 2 |
| 2003 | 8 | 0 | 0 | 0 |
| 2004 | 2 | 0 | 0 | 0 |
| 2006 | 1 | 0 | 0 | 0 |
| 2008 | 3 | 0 | 1 | 2 |
| 2009 | 4 | 0 | 1 | 0 |
| 2010 | 5 | 0 | 2 | 1 |
| 2011 | 9 | 0 | 1 | 1 |
| 2012 | 2 | 0 | 2 | 1 |
| 2013 | 7 | 0 | 5 | 1 |
| 2014 | 6 | 0 | 1 | 0 |
| 2015 | 7 | 0 | 1 | 0 |
| 2016 | 5 | 0 | 3 | 1 |
| 2017 | 9 | 0 | 0 | 0 |
| 2018 | 7 | 0 | 0 | 0 |
| 2019 | 6 | 0 | 2 | 1 |
| 2020 | 4 | 0 | 0 | 0 |
| 2021 | 1 | 0 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Bathroom remodel | 6 | 4 | 0 | 1 | 1 | 12 | 158 |
| Stairs | 2 | 2 | 0 | 0 | 0 | 32 | 334 |

## Most recent permits

The 100 most recent of 146.

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202105049788](https://www.permitgraph.org/p/202105049788) | May 4, 2021 | Completed: final sign-off Jul 2022 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | g/f: interior t.i. for coffee shop in (e) shell.new non-structural partitions, new electrical plans and remote transformer at back of house. new equipment, lighting fixtures, furniture and finishes.… | $182,700 |
| [202008081397](https://www.permitgraph.org/p/202008081397) | Aug 8, 2020 | Completed: final sign-off Mar 2022 | [444 Castro St](https://www.permitgraph.org/a/2647/006) | barrier removal | $8,500 |
| [202008051195](https://www.permitgraph.org/p/202008051195) | Aug 5, 2020 | Completed: final sign-off Jul 2021 | [1801 Van Ness Av](https://www.permitgraph.org/a/0618/002) | barrier removals. several door removals, bathroom modifications | $11,500 |
| [202007130086](https://www.permitgraph.org/p/202007130086) | Jul 13, 2020 | Completed: final sign-off Feb 2021 | [420 Montgomery St](https://www.permitgraph.org/a/0239/026) | adding exit signs to t.i project that was permitted under pa# 201902263821. adding exit signs in response to sffd inspector comments. see pre application meeting notes on sheet t2-0. | $2,500 |
| [202007130085](https://www.permitgraph.org/p/202007130085) | Jul 13, 2020 | Completed: final sign-off Feb 2021 | [420 Montgomery St](https://www.permitgraph.org/a/0239/026) | adding exit signs to t.i project that was permitted under pa# 201704285136. adding exit signs in response to sffd inspector comments. see pre application meeting notes on sheet t2-0. | $2,500 |
| [201910033446](https://www.permitgraph.org/p/201910033446) | Oct 3, 2019 | Completed: final sign-off May 2021 | [150 Spear St](https://www.permitgraph.org/a/3717/021) | mechanical work for 11th fl office ti ref 201908239655 |  |
| [201910033449](https://www.permitgraph.org/p/201910033449) | Oct 3, 2019 | Completed: final sign-off Jun 2020 | [150 Spear St](https://www.permitgraph.org/a/3717/021) | mechanical work only 10th fl office ti ref 201906254320 |  |
| [201908280025](https://www.permitgraph.org/p/201908280025) | Aug 28, 2019 | Never finaled: issued Jan 2020, no final | [865 Market St](https://www.permitgraph.org/a/3705/042) | interior renovation of (e) starbuck cafe in commercial level tenant space including arch, plm, ele upgrade. upgrade to int finishes, equip and casework | $300,000 |
| [201908239655](https://www.permitgraph.org/p/201908239655) | Aug 23, 2019 | Completed: final sign-off Mar 2020 | [150 Spear St](https://www.permitgraph.org/a/3717/021) | 11th flr. tenant improvement at 11th fl. new interior partitions, doors, elec, finishes, lighting mep def | $867,000 |
| [201905201046](https://www.permitgraph.org/p/201905201046) | May 20, 2019 | Expired or cancelled: cancelled Oct 2020 | [420 Montgomery St](https://www.permitgraph.org/a/0239/026) | 12/f: replace existing elevator lobby door with new 45 min security door, patch wall as needed. smoke detector under sep permit. maher n/a. | $9,000 |
| [201902263821](https://www.permitgraph.org/p/201902263821) | Feb 26, 2019 | Completed: final sign-off Jun 2019 | [420 Montgomery St](https://www.permitgraph.org/a/0239/026) | 12th flr. add security hardware to (e) pair of doors. | $2,000 |
| [201901170607](https://www.permitgraph.org/p/201901170607) | Jan 17, 2019 | Completed: final sign-off May 2019 | [155 Montgomery St](https://www.permitgraph.org/a/0288/001) | replace millwork for new equipment for mobile order ahead service. plumbing and electrical. no structural, exterior or mech | $75,000 |
| [201901170609](https://www.permitgraph.org/p/201901170609) | Jan 17, 2019 | Completed: final sign-off May 2019 | [22 Battery St](https://www.permitgraph.org/a/0266/006) | additional casework for new equipment for mobile order ahead service. plumbing and electrical. no structural, exterior or mechanical work | $75,000 |
| [201901039519](https://www.permitgraph.org/p/201901039519) | Jan 3, 2019 | Never finaled: issued Mar 2019, no final | [420 Montgomery St](https://www.permitgraph.org/a/0239/026) | 10th flr. add new conference rooms, focus rooms, huddle rooms and mothers' room. new lighting in areas of construction. new paint and carpet for new open office area at california st. side only. | $125,000 |
| [201809139928](https://www.permitgraph.org/p/201809139928) | Sep 13, 2018 | Completed: final sign-off Nov 2018 | [420 Montgomery St](https://www.permitgraph.org/a/0239/026) | 12th fl - revision to pa 2018-0531-0545 elevator vestibule lobby | $1,000 |
| [201809129860](https://www.permitgraph.org/p/201809129860) | Sep 12, 2018 | Completed: final sign-off Nov 2018 | [1500 Owens St](https://www.permitgraph.org/a/8709/018) | 4/f: re-locate away from wall existing equipment, compounding hood, and re-anchoring same to floor | $50,000 |
| [201805310545](https://www.permitgraph.org/p/201805310545) | May 31, 2018 | Completed: final sign-off Nov 2018 | [420 Montgomery St](https://www.permitgraph.org/a/0239/026) | revision to pa 2018-0125-9519 remove item from special inspection minor changes as noted, replaced glazing system remove structural stall |  |
| [201804267432](https://www.permitgraph.org/p/201804267432) | Apr 26, 2018 | Completed: final sign-off May 2019 | [66 Kearny St](https://www.permitgraph.org/a/0311/007) | change of occupancy from m,b to a-2. starbucks cafe administrative permit to correct occupant load from 201710312717 no exterior work |  |
| [201804176630](https://www.permitgraph.org/p/201804176630) | Apr 17, 2018 | Completed: final sign-off May 2019 | [66 Kearny St](https://www.permitgraph.org/a/0311/007) | revision to 201710312717. entry door swing from in to outward. occupant load/ occupacy calcs. sffd assembly permit required maher not req |  |
| [201803123458](https://www.permitgraph.org/p/201803123458) | Mar 12, 2018 | Completed: final sign-off Apr 2018 | [66 Kearny St](https://www.permitgraph.org/a/0311/007) | rev. to 2017 1031 2717 ; t.i. for a new starbucks cafe. work is comprised of new interior non-structural partition walls, new restroom fixtures, new furnatures and finishes. n/a for maher | $22,000 |
| [201801259519](https://www.permitgraph.org/p/201801259519) | Jan 25, 2018 | Completed: final sign-off Nov 2018 | [420 Montgomery St](https://www.permitgraph.org/a/0239/026) | interior tenant imrpovement on floor 12 inlcuding drywall ceilings, lighting electrical, mechanical finishes & plumbing | $3,146,240 |
| [201711012838](https://www.permitgraph.org/p/201711012838) | Nov 1, 2017 | Completed: final sign-off May 2019 | [455 Market St](https://www.permitgraph.org/a/3709/012) | suite #100 - renovation of existing unit "starbucks coffee" - remove existing & install new walls, doors, casework, furniture, finishes, ceilings & lighting. new restrooms fixtures & accessories for… | $129,245 |
| [201710312717](https://www.permitgraph.org/p/201710312717) | Oct 31, 2017 | Completed: final sign-off Apr 2018 | [66 Kearny St](https://www.permitgraph.org/a/0311/007) | g/f -ti in existing historical building - new interior non-structural partition walls, new restrooms ada - furniture and finishes. fully sprinklered. | $250,000 |
| [201710040322](https://www.permitgraph.org/p/201710040322) | Oct 4, 2017 | Completed: final sign-off Mar 2018 | [420 Montgomery St](https://www.permitgraph.org/a/0239/026) | 12th fl: pre-construction interior soft demo of under ab-017. no required fire rated construction to be removed. maher na | $127,775 |
| [201708306361](https://www.permitgraph.org/p/201708306361) | Aug 30, 2017 | Completed: final sign-off Dec 2017 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | rev to pa#201702280344: commerical t.i. suite 100 to (e) shell/vacant space including restrooms, furniture, fixtures and equipment. mep included. maher n/a. fire l/s & f/a under separate permits. n/a… | $15,000 |
| [201706230196](https://www.permitgraph.org/p/201706230196) | Jun 23, 2017 | Completed: final sign-off May 2019 | [333 Market St](https://www.permitgraph.org/a/3710/020) | 3/f- amep plans - work to remodel existing offices, add training facilities and meeting rooms for business training purposes. connect core areas with corridor to access toilets and exit stairs. n/a o… | $1,500,000 |
| [201704285136](https://www.permitgraph.org/p/201704285136) | Apr 28, 2017 | Completed: final sign-off Jan 2019 | [420 Montgomery St](https://www.permitgraph.org/a/0239/026) | remodel 9th fl, add new offices, new led lighging, finsihes for new offices area, offices, conference rooms, copy rooms, breakroom, restrooms no new plumbing fixtures added, elevator lobby. new mech… | $575,300 |
| [201703010382](https://www.permitgraph.org/p/201703010382) | Mar 1, 2017 | Completed: final sign-off Dec 2017 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | ground flr: selective demo of partially vacant tenant unit (e) restrooms, interior walls and electrical panels. suspended ceiling under separate permit (until sprinkler or construction plans approved… | $11,778 |
| [201702280344](https://www.permitgraph.org/p/201702280344) | Feb 28, 2017 | Completed: final sign-off Dec 2017 | [201 Mission St](https://www.permitgraph.org/a/3718/026) | commercial tenant improvement to existing vacant unit. includes restrooms, fixtures, furniture and equipment. maher na fire and life safety under separate permits | $382,860 |
| [201701318262](https://www.permitgraph.org/p/201701318262) | Jan 31, 2017 | Completed: final sign-off Jul 2017 | [580 California St](https://www.permitgraph.org/a/0240/007) | suite # 150: commercial tenant improvement to an extg vacant unit includes mechanical, electrical and plumbing. signage and spriklers under seperate pemit. n/a for maher. | $215,938 |
| [201608094537](https://www.permitgraph.org/p/201608094537) | Aug 9, 2016 | Completed: final sign-off Jan 2017 | [420 Montgomery St](https://www.permitgraph.org/a/0239/026) | install new granite clad concrete planter within property line and landscaping upgrade, replace existing sidewalk planters with new granite clad precast concrete planters, planters not attached to si… | $20,000 |
| [201606170241](https://www.permitgraph.org/p/201606170241) | Jun 17, 2016 | Completed: final sign-off Oct 2016 | [1 California St](https://www.permitgraph.org/a/0264/004) | 12th floor: minor demolition, new partitions, inerior finishes and minor ceiling remodel. ada compliance under pa#201606099510 | $100,000 |
| [201605056639](https://www.permitgraph.org/p/201605056639) | May 5, 2016 | Never finaled: issued May 2016, no final | [199 Fremont St](https://www.permitgraph.org/a/3719/018) | grd fl: interior update restroom to current ada code. modify (e) ceiling soffit. remove (e) lighting, replace with new, remove (e) walls, doors, floor penetrations, equip, furniture, casework, floori… | $106,105 |
| [201605036413](https://www.permitgraph.org/p/201605036413) | May 3, 2016 | Expired or cancelled: cancelled Dec 2017 | [455 Market St](https://www.permitgraph.org/a/3709/012) | suite 100 -interior: remove (e) walls, install (n) walls & door. remnove (e) floor penetrations, replace w/new. remove (e) small wares, furniture, graphics, casework, flooring, walk of matt, finishes… | $104,160 |
| [201604013734](https://www.permitgraph.org/p/201604013734) | Apr 1, 2016 | Completed: final sign-off Oct 2016 | [264 Kearny St](https://www.permitgraph.org/a/0288/017) | starbucks: exterior install (n)reserve graphics @ window. interior: remove (e)&install (n)doors.remove(e)furniture & fixtures & provide(n).remove(e)&install(n)lights.remove(e)wall & floor finishes pr… | $66,727 |
| [201603242984](https://www.permitgraph.org/p/201603242984) | Mar 24, 2016 | Completed: final sign-off Jul 2016 | [420 Montgomery St](https://www.permitgraph.org/a/0239/026) | installation of new turnstiles on ground floor. minor relocation of existing lighting/museum displays. maher na | $50,000 |
| [201603172382](https://www.permitgraph.org/p/201603172382) | Mar 17, 2016 | Never finaled: issued Mar 2016, no final | [259 California St](https://www.permitgraph.org/a/0262/013) | public health department review only ref ti 2016-0211-9344. other departmental review under pa 2016-0211-9344 |  |
| [201602119344](https://www.permitgraph.org/p/201602119344) | Feb 11, 2016 | Never finaled: issued Feb 2016, no final | [259 California St](https://www.permitgraph.org/a/0262/013) | interior remoddeling - starbucks coffee. replace flooring - new walls and doors - remodel bathroom, new counter layout, new casework. maher na fire sprinklers under sep permit. | $106,105 |
| [201601268042](https://www.permitgraph.org/p/201601268042) | Jan 26, 2016 | Completed: final sign-off Jun 2016 | [350 Parnassus Av](https://www.permitgraph.org/a/1275/059) | t.i. for starbuck coffee shop, exterior work to include installation of extgerior chairs & tables & accessible ramp, interior improvements include remove & relocate fixtures, eqpt, casework lighting,… | $86,000 |
| [201510139511](https://www.permitgraph.org/p/201510139511) | Oct 13, 2015 | Never finaled: issued Oct 2015, no final | [1 Market St](https://www.permitgraph.org/a/3713/007) | unit 19, revision to ref pa 2015 07 14 1447: clarifiaction to wall typ note maher na |  |
| [201509187405](https://www.permitgraph.org/p/201509187405) | Sep 18, 2015 | Completed: final sign-off Feb 2016 | [420 Mission Bay Blvd North Bl](https://www.permitgraph.org/a/8720/117) | (n) patio railing. n/a ordinance #155-13 | $100 |
| [201507141447](https://www.permitgraph.org/p/201507141447) | Jul 14, 2015 | Completed: final sign-off Dec 2015 | [1 Market St](https://www.permitgraph.org/a/3713/007) | ground fl, unit 19: tenant improvement to existing vacant unit. including construction of new walls, ceilings, floor and wall finishes, casework, fixtures, furnishings. life safety deferred. | $156,000 |
| [201507020558](https://www.permitgraph.org/p/201507020558) | Jul 2, 2015 | Completed: final sign-off Mar 2016 | [333 Market St](https://www.permitgraph.org/a/3710/020) | "starbucks coffee" - remove (e) casework, furniture, & wall finishes. isntall new casework, furniture & wall finishes. repaint ceiling to front of house & add under counter lighting. construct new st… | $60,328 |
| [201504103291](https://www.permitgraph.org/p/201504103291) | Apr 10, 2015 | Completed: final sign-off Feb 2016 | [420 Mission Bay Blvd North Bl](https://www.permitgraph.org/a/8720/117) | unit 101: ground flr: shell improvements - new restrooms, new patio railing, new wind screen, new walls, mep. maher - not req'd | $195,000 |
| [201504093256](https://www.permitgraph.org/p/201504093256) | Apr 9, 2015 | Completed: final sign-off Oct 2015 | [420 Mission Bay Blvd North Bl](https://www.permitgraph.org/a/8720/117) | change of occupancy from m to a2. unit 101: ti-non load bearing walls-partitions, cabinets and back bar - shelves, dishwasher area -casework-equipment-new mech, new lighting - floor- starbucks sign &… | $300,000 |
| [201503302232](https://www.permitgraph.org/p/201503302232) | Mar 30, 2015 | Completed: final sign-off Feb 2016 | [420 Montgomery St](https://www.permitgraph.org/a/0239/026) | 10th floor: total area of work is 10140 sq ft. remodel of extg office space. including new lighting, finishes for new open office area, offices, conference rooms, copy room, breakroom elevator lobby.… | $320,000 |
| [201502249153](https://www.permitgraph.org/p/201502249153) | Feb 24, 2015 | Completed: final sign-off Jun 2015 | [1 Market St](https://www.permitgraph.org/a/3713/006) | soft demo, construct (n) walls, remove flooring, install (n) casework, wall treatment, install equipment. modify (e) soffits & ceiling, (n) lighting, patch & paint. add (n) door.sprinklers under sepa… | $51,000 |
| [201409095839](https://www.permitgraph.org/p/201409095839) | Sep 9, 2014 | Completed: final sign-off Aug 2015 | [555 California St](https://www.permitgraph.org/a/0259/026) | starbucks @ grnd flr: updating existing casework, painting, relocate plumbing fixtures, update equipment, install new furniture, install new electrical panel; maher n/a | $120,000 |
| [201408083432](https://www.permitgraph.org/p/201408083432) | Aug 8, 2014 | Never finaled: issued Aug 2014, no final | [420 Montgomery St](https://www.permitgraph.org/a/0239/026) | revision to 201404294415. area of work 120 sq ft. relocation of proposed electrical room 653 a. provide fire/smoke dampers. 1 hr rated walls and 20 min door/frame. 2 relocated light fixtures. revise… | $2,000 |
| [201405226477](https://www.permitgraph.org/p/201405226477) | May 22, 2014 | Completed: final sign-off Sep 2014 | [462 Powell St](https://www.permitgraph.org/a/0295/008) | relocate extg casework, plmg, auxilary lighting, & hvac. install or modify flooring install new wall treatment, relocate extg electrical panel relocate accessories and fixtures as required for ada co… | $120,000 |
| [201404294415](https://www.permitgraph.org/p/201404294415) | Apr 29, 2014 | Completed: final sign-off Nov 2014 | [420 Montgomery St](https://www.permitgraph.org/a/0239/026) | remodel (e) full floor office space, new lighting, & finishes for new open office area, offices, conference rooms, copy room, break room, & elevator looby, new mechanical, plumbing & electrical, work… | $2,404,000 |
| [201404173513](https://www.permitgraph.org/p/201404173513) | Apr 17, 2014 | Completed: final sign-off Aug 2014 | [50 California St](https://www.permitgraph.org/a/0235/022) | g/f- constructed new walls, install or modify extg flooring as indicated, install new or relocate casework, new and replaced extg plmg items, equipments, light fixtures and relocate extg graphics on… | $130,000 |
| [201403070196](https://www.permitgraph.org/p/201403070196) | Mar 7, 2014 | Completed: final sign-off Jul 2014 | [280 King St](https://www.permitgraph.org/a/8702/611) | remodel of existing starbucks cafe including minor plumbing + electrical modifications. compliance with ordinance #155-13 not required | $100,000 |
| [201401156350](https://www.permitgraph.org/p/201401156350) | Jan 15, 2014 | Completed: final sign-off Feb 2014 | [490 Brannan St](https://www.permitgraph.org/a/3776/025) | revision to app#201310159200. relocate sink at counter and electrical outlets. provide 8" wall cap with sneeze guard/remove counter. remove wheel chair accessibility from the removed counter. complia… |  |
| [201312124020](https://www.permitgraph.org/p/201312124020) | Dec 12, 2013 | Completed: final sign-off May 2014 | [388 Market St](https://www.permitgraph.org/a/0265/005) | interior remodel of an extg starbucks cafe including minor plumbing and electrical. | $50,000 |
| [201311040989](https://www.permitgraph.org/p/201311040989) | Nov 4, 2013 | Completed: final sign-off Aug 2014 | [100 Montgomery St](https://www.permitgraph.org/a/0289/005) | new commercial t.i.in extg building. convert building lobby space to an a2 occupancy. max occupant load of 85 persons. new (1) fsd. f/a, sprinklers, signage under separate permit. | $139,934 |
| [201310219785](https://www.permitgraph.org/p/201310219785) | Oct 21, 2013 | Expired or cancelled: cancelled May 2014 | [1 Market St](https://www.permitgraph.org/a/3713/006) | t.i. to extg starbucks consist of equipment, relocation, casework modification, re-paint extg walls, refinish extg flooring. light fixtures update/modification. | $90,000 |
| [201310159200](https://www.permitgraph.org/p/201310159200) | Oct 15, 2013 | Completed: final sign-off Feb 2014 | [490 Brannan St](https://www.permitgraph.org/a/3776/025) | t.i. to (e) starbucks: major improvements to the cafe, front bar & back bar with recongiguration. relocate bar equip, floor sinks, update furniture & casework. re-aint (e) walls & ceilings for new fi… | $100,000 |
| [201309197265](https://www.permitgraph.org/p/201309197265) | Sep 19, 2013 | Completed: final sign-off Feb 2017 | [350 Rhode Island St](https://www.permitgraph.org/a/3957/002) | t.i. of existing cafe. no structural minor plumbing mechanical & electrical. | $200,000 |
| [201304084015](https://www.permitgraph.org/p/201304084015) | Apr 8, 2013 | Never finaled: issued Apr 2013, no final | [420 Montgomery St](https://www.permitgraph.org/a/0239/026) | administrative permit to correct valuation at job correct valuation $2,000.000 for app# 201210041346 | $1,998,000 |
| [201304033708](https://www.permitgraph.org/p/201304033708) | Apr 3, 2013 | Never finaled: issued Apr 2013, no final | [420 Montgomery St](https://www.permitgraph.org/a/0239/026) | revision to pa# 1201-1004-1346-repairs to reinforced concrete beam | $1,000 |
| [201303252951](https://www.permitgraph.org/p/201303252951) | Mar 25, 2013 | Never finaled: issued Mar 2013, no final | [420 Montgomery St](https://www.permitgraph.org/a/0239/026) | 11th floor revision to appl #2012.10.04.1346 - steel header for sliding pocket door. all fireproofing to be repaired in-kind on (e) beams/structure. | $12,000 |
| [201303152356](https://www.permitgraph.org/p/201303152356) | Mar 15, 2013 | Completed: final sign-off Mar 2014 | [343 Sansome St](https://www.permitgraph.org/a/0239/030) | interior t.i. to extg starbucks coffee shop. no mechanical work. | $234,575 |
| [201303152359](https://www.permitgraph.org/p/201303152359) | Mar 15, 2013 | Never finaled: issued Apr 2013, no final | [201 03rd St](https://www.permitgraph.org/a/3735/059) | revision to app#201208097003. revise finishes, fixtures layout and occupant load (88) jjc. | $3,500 |
| [201302260989](https://www.permitgraph.org/p/201302260989) | Feb 26, 2013 | Never finaled: issued Apr 2013, no final | [201 03rd St](https://www.permitgraph.org/a/3735/059) | 1st floor:mechanical t.i. provide complete fully operational mechanical system. includes mechanical, electrical and plumbing. fire and sprinkler on seperate permits | $30,000 |
| [201302190439](https://www.permitgraph.org/p/201302190439) | Feb 19, 2013 | Completed: final sign-off May 2013 | [150 Spear St](https://www.permitgraph.org/a/3717/021) | 10th floor:mech, electrical:1 new transfer fan, 1 new vav box, duct distribution to be modified, no new fsd's being added, new lighting, arch ref app#201301188301 | $10,000 |
| [201301188301](https://www.permitgraph.org/p/201301188301) | Jan 18, 2013 | Completed: final sign-off May 2013 | [150 Spear St](https://www.permitgraph.org/a/3717/021) | 10th fl. ti include the demo of non-structrual partitions and build new non-structural partitions. all new or revised hvac, electrical, plumbing and life safety work will be submitted for permit sepa… | $89,000 |
| [201211264797](https://www.permitgraph.org/p/201211264797) | Nov 26, 2012 | Expired or cancelled: expired Dec 2014 | [201 03rd St](https://www.permitgraph.org/a/3735/059) | installation of temporary trailer for retail coffee service. connectin of electrical , freshwater, waste water to facililites in existing starbucks | $5,000 |
| [201209058951](https://www.permitgraph.org/p/201209058951) | Sep 5, 2012 | Never finaled: issued Sep 2012, no final | [100 01st St](https://www.permitgraph.org/a/3721/087) | revision to pa# 201203146066. work to include fire proofing column, provide j-box for hvac pump, transformer platform removed from scope, new transformer concrete pad and heat pump anchorage, 1st flo… | $25,000 |
| [201208097003](https://www.permitgraph.org/p/201208097003) | Aug 9, 2012 | Completed: final sign-off Jul 2013 | [201 03rd St](https://www.permitgraph.org/a/3735/059) | tenant improvement of existing coffee shop. new restrooms, interior work only. sprinklers on a separate permit | $250,000 |
| [201206293811](https://www.permitgraph.org/p/201206293811) | Jun 29, 2012 | Never finaled: issued Jun 2012, no final | [391 Sutter St](https://www.permitgraph.org/a/0294/015) | investigative demolition of existing stucco facade treatment in selective areas " starbucks". | $15,580 |
| [201201132236](https://www.permitgraph.org/p/201201132236) | Jan 13, 2012 | Completed: final sign-off Nov 2012 | [201 Powell St](https://www.permitgraph.org/a/0315/006) | 1st floor tenant improvement to existing starbucks. new bar casework and cafe furniture. refurnish existig wood floor and replace flooring. new wall and ceiling finishes | $85,000 |
| [201110287871](https://www.permitgraph.org/p/201110287871) | Oct 28, 2011 | Completed: final sign-off Nov 2011 | [222 Mason St](https://www.permitgraph.org/a/0326/011) | revision to app#201011225460. replace stair risors and windows. | $2,000 |
| [201109265464](https://www.permitgraph.org/p/201109265464) | Sep 26, 2011 | Completed: final sign-off May 2012 | [1255 Battery St](https://www.permitgraph.org/a/0084/009) | #600- ti demo, counter, shelf, cabinet, display, new walls non load bearing, modfy existing soffits. new casework, patch, prime and paint. | $125,000 |
| [201105196350](https://www.permitgraph.org/p/201105196350) | May 19, 2011 | Never finaled: issued Sep 2011, no final | [391 Sutter St](https://www.permitgraph.org/a/0294/015) | demo of (e) & installation of (n) cabs., counter & plumbing fixt., in bar & cafe are-installation of (n) non-load bearing wall & clo., door-demo of (e) clg., elements & installation of (n) susp. gyp.… | $200,000 |
| [201104154143](https://www.permitgraph.org/p/201104154143) | Apr 15, 2011 | Completed: final sign-off Nov 2011 | [150 Spear St](https://www.permitgraph.org/a/3717/021) | 11th floor revision to pa #201102029511 - hardship added to use automatic stall openers in restrooms. | $7,000 |
| [201103182362](https://www.permitgraph.org/p/201103182362) | Mar 18, 2011 | Completed: final sign-off Nov 2011 | [420 Montgomery St](https://www.permitgraph.org/a/0239/026) | penthouse level-upgrade (e) men's toilet room & add 1 unisex toilet room to current cbc & ada standards | $35,000 |
| [201102180510](https://www.permitgraph.org/p/201102180510) | Feb 18, 2011 | Completed: final sign-off Mar 2011 | [799 Market St](https://www.permitgraph.org/a/3706/047) | revision to pa# 2011.01.05.7882, remove new bathroom from scope of work indicated on approved and issued permit |  |
| [201102029511](https://www.permitgraph.org/p/201102029511) | Feb 2, 2011 | Completed: final sign-off Nov 2011 | [150 Spear St](https://www.permitgraph.org/a/3717/021) | tenant improvement installation of new non-structural partition offices, minor changes in bathroom, cabinets work, in bathroom, cabinet work, minor mechanical work. | $550,000 |
| [201101208734](https://www.permitgraph.org/p/201101208734) | Jan 20, 2011 | Completed: final sign-off Aug 2011 | [150 Spear St](https://www.permitgraph.org/a/3717/021) | t.i. demolishing of non structural partition per ab-017. | $30,000 |
| [201101108171](https://www.permitgraph.org/p/201101108171) | Jan 10, 2011 | Expired or cancelled: expired Nov 2013 | [201 Spear St](https://www.permitgraph.org/a/3741/032) | 1) cafe interior remodel. 2) replace (e) cabinets. 3) non-load bearing dry-walls. 4) modification of dry-wall soffits. mep under seperate permit | $90,000 |
| [201101057882](https://www.permitgraph.org/p/201101057882) | Jan 5, 2011 | Completed: final sign-off Mar 2011 | [799 Market St](https://www.permitgraph.org/a/3706/047) | phase 2: reconfigure (e) non-bearing partition modify, elec., mech., fire protection. | $40,000 |
| [201101057887](https://www.permitgraph.org/p/201101057887) | Jan 5, 2011 | Completed: final sign-off Mar 2011 | [799 Market St](https://www.permitgraph.org/a/3706/047) | phase 1: reconfigure (e) non-load bearing partition modify (e) elec., mech., fire protection. | $50,000 |
| [201012227221](https://www.permitgraph.org/p/201012227221) | Dec 22, 2010 | Completed: final sign-off Jan 2011 | [799 Market St](https://www.permitgraph.org/a/3706/047) | soft demo of non structural partitoins at 5th floor office space per ab-009- construction separte permit | $10,000 |
| [201011225460](https://www.permitgraph.org/p/201011225460) | Nov 22, 2010 | Completed: final sign-off Nov 2011 | [222 Mason St](https://www.permitgraph.org/a/0326/011) | renovation of (e) starbucks, incl. repalcaing finishes, cabinetry, lighting and equipment. no exterior or struc modifications. all existing and new drywall partiotion are non bearing | $100,000 |
| [201008249507](https://www.permitgraph.org/p/201008249507) | Aug 24, 2010 | Completed: final sign-off Nov 2011 | [744 Irving St](https://www.permitgraph.org/a/1742/017) | starbucks coffee. patch and paint walls, patch tile floor, patch and repair new wall. tile at back bar, modify railing at entry area | $10,000 |
| [201008138759](https://www.permitgraph.org/p/201008138759) | Aug 13, 2010 | Completed: final sign-off Apr 2011 | [420 Montgomery St](https://www.permitgraph.org/a/0239/026) | partial 11th floor - remodel of (e) office space (partial floor): (n) ceiling, lighting & finishes for (e) open office area, offices, conf. rooms, copy rm., pantry & elevator lobbies. | $150,000 |
| [201007277490](https://www.permitgraph.org/p/201007277490) | Jul 27, 2010 | Never finaled: issued Aug 2010, no final | [44 Montgomery St](https://www.permitgraph.org/a/0291/012) | ground floor - demo vinyl walls, patch & refinish, smooth paint; demo & replace with new countertops, casework & relocate casework; demo floor & refloor; demo ceiling & receiling, new equipment & rel… | $15,000 |
| [201007277498](https://www.permitgraph.org/p/201007277498) | Jul 27, 2010 | Expired or cancelled: expired Oct 2013 | [74 New Montgomery St](https://www.permitgraph.org/a/3707/033) | unit#100 ti for starbucks: demo existing artwork, vinyl walls, patch and finish smooth paint finish. demo countertops and base cabinets, demo existing walls, non structural, dmo floors. new floors, i… | $15,000 |
| [201007277489](https://www.permitgraph.org/p/201007277489) | Jul 27, 2010 | Never finaled: issued Aug 2010, no final | [99 Jackson St](https://www.permitgraph.org/a/0200/014) | interior ti to starbucks. demo vinyl walls, patch, repair smooth surface paint and finish. demo casework and countertops, replace with new countertops and casework. relocate existing casework. demo f… | $15,000 |
| [201007277494](https://www.permitgraph.org/p/201007277494) | Jul 27, 2010 | Completed: final sign-off Nov 2011 | [120 04th St](https://www.permitgraph.org/a/3724/067) | interior demo of starbucks. demo vinyl walls, patch, finish, smooth paint finish. demo casework and base cabinets. replace w/ new countertops & base cabinets. demo (e) floor & refloor. no mech/light… | $8,000 |
| [200907303763](https://www.permitgraph.org/p/200907303763) | Jul 30, 2009 | Completed: final sign-off Aug 2009 | [462 Powell St](https://www.permitgraph.org/a/0295/008) | renew pa# 2008/04/10/9306 to obtain final inspeciton. all work has been completed. |  |
| [200907092285](https://www.permitgraph.org/p/200907092285) | Jul 9, 2009 | Completed: final sign-off Jul 2009 | [130 Dore St](https://www.permitgraph.org/a/3519/069) | to complete work and obtain final inspection for work approved under pa#200803187437. |  |
| [200904095942](https://www.permitgraph.org/p/200904095942) | Apr 9, 2009 | Completed: final sign-off Sep 2009 | [50 California St](https://www.permitgraph.org/a/0235/022) | 1st floor -pevision to appl #200811257300 -refinishing casework & counters, new ada warming station, new paint & backbar plam. | $24,000 |
| [200904095938](https://www.permitgraph.org/p/200904095938) | Apr 9, 2009 | Never finaled: issued Jul 2009, no final | [455 Market St](https://www.permitgraph.org/a/3709/012) | refinish casework + counters, several (n) elect, outlets. (n) paint & back bar tile. relocate track light. revision to pe#200812037716. | $50,000 |
| [200901230691](https://www.permitgraph.org/p/200901230691) | Jan 23, 2009 | Completed: final sign-off May 2009 | [420 Montgomery St](https://www.permitgraph.org/a/0239/026) | mep only for 9th floor partial floor tenant improvement for wells fargo | $441,047 |
| [200812198834](https://www.permitgraph.org/p/200812198834) | Dec 19, 2008 | Completed: final sign-off May 2009 | [420 Montgomery St](https://www.permitgraph.org/a/0239/026) | at 9th fl: partial floor tenant improvement on single tenant floor including: selective demolition, partition, ceiling, finishes. | $441,047 |
| [200811247190](https://www.permitgraph.org/p/200811247190) | Nov 24, 2008 | Completed: final sign-off Feb 2009 | [1560 Van Ness Av](https://www.permitgraph.org/a/0646/012) | remove damaged wall and replace with new 2 hour walls at stairwell #3 | $40,000 |
| [200804038727](https://www.permitgraph.org/p/200804038727) | Apr 3, 2008 | Completed: final sign-off Apr 2008 | [799 Market St](https://www.permitgraph.org/a/3706/047) | renew pa# 2006/10/11/4654 for final inspection only. |  |
| [200803187437](https://www.permitgraph.org/p/200803187437) | Mar 18, 2008 | Expired or cancelled: expired Apr 2009 | [130 Dore St](https://www.permitgraph.org/a/3519/069) | reroofing with structural upgrade to diaphragm: new 1/2" ply over (e) sheathing, new hds @ 4' oc, new ledgers & blkg. | $22,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/t-c-b-builders-inc-403761.