# Switch Construction

Contractor license 1090550. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/switch-construction-1090550
- JSON: https://www.permitgraph.org/api/contractor?license=1090550
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=1090550

6 permits since 2000: 5 completed, 1 in progress. Typically 0 days from filing to permit and 111 days from permit to final inspection.

- Based in: San Francisco
- On San Francisco permits: Jun 2022 to Dec 2025
- Last 24 months: 2 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2022 | 1 | 0 | 0 | 0 |
| 2023 | 1 | 0 | 0 | 0 |
| 2024 | 2 | 0 | 0 | 0 |
| 2025 | 1 | 1 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Deck | 1 | 0 | 1 | 0 | 0 |  |  |
| Stairs | 1 | 0 | 1 | 0 | 0 |  |  |
| Bathroom remodel | 2 | 2 | 0 | 0 | 0 | 0 | 232 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202507251677](https://www.permitgraph.org/p/202507251677) | Dec 3, 2025 | In progress: filed Dec 2025, not yet issued | [90 Edgehill Wy](https://www.permitgraph.org/a/2934/017) | all exterior work. (n) terraced planters, (n) rear yard wood deck, (n) site stair to deck, (n) retaining wall at rear yard property line with wood fence, (n) front metal gate w/ sliding driveway gate… | $80,000 |
| [202504295438](https://www.permitgraph.org/p/202504295438) | Apr 29, 2025 | Completed: final sign-off Apr 2026 | [1242 Sacramento St](https://www.permitgraph.org/a/0221/124) | unit #6: remodel bathroom existing bathtub to become shower area. | $10,000 |
| [202410304057](https://www.permitgraph.org/p/202410304057) | Oct 30, 2024 | Completed: final sign-off Dec 2024 | [580 Sutter St](https://www.permitgraph.org/a/0284/011) | revision to pa # 2024-0624-5094 remove (n) floor sink from scope. show (e) floor sink below water heater. relocate refuse area, ice maker, storage equipment and mop sink. |  |
| [202406245094](https://www.permitgraph.org/p/202406245094) | Jun 24, 2024 | Completed: final sign-off Dec 2024 | [580 Sutter St](https://www.permitgraph.org/a/0284/011) | demo and replace e bar, seating, fixtures and finishes, add new bar framing, casework, services, equipment, fixtures finishes. new wall and ceiling finishes and new flooring throughout. note extent o… | $50,000 |
| [202308255284](https://www.permitgraph.org/p/202308255284) | Aug 25, 2023 | Completed: final sign-off Aug 2024 | [220 30th Av](https://www.permitgraph.org/a/1389/030) | patch work and repair roof as need less than 25% | $10,000 |
| [202206085876](https://www.permitgraph.org/p/202206085876) | Jun 8, 2022 | Completed: final sign-off Sep 2022 | [3243 Pierce St](https://www.permitgraph.org/a/0489/004) | one bathroom remodel and water repair. non structural | $40,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/contractor/switch-construction-1090550.
