# Swift Construction

Contractor license 939223. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/swift-construction-939223
- JSON: https://www.permitgraph.org/api/contractor?license=939223
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=939223

11 permits since 2000: 9 completed, 2 never finaled. Typically 0 days from filing to permit and 63 days from permit to final inspection. Of the 2 never-finaled permits, 2 are over 10 years old.

- Based in: San Mateo
- On San Francisco permits: May 2013 to Nov 2025
- Last 24 months: 4 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2013 | 1 | 0 | 1 | 0 |
| 2016 | 0 | 0 | 1 | 0 |
| 2017 | 1 | 0 | 0 | 0 |
| 2018 | 1 | 0 | 0 | 0 |
| 2021 | 1 | 0 | 0 | 0 |
| 2022 | 1 | 0 | 0 | 0 |
| 2025 | 4 | 0 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Bathroom remodel | 6 | 5 | 0 | 1 | 0 | 0 | 61 |
| Kitchen remodel | 2 | 2 | 0 | 0 | 0 | 10 | 170 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202511189897](https://www.permitgraph.org/p/202511189897) | Nov 18, 2025 | Completed: final sign-off Dec 2025 | [364 Eddy St](https://www.permitgraph.org/a/0333/011) | 4th fl: bathroom remodel:replace tub with stall shower. | $25,000 |
| [202508052339](https://www.permitgraph.org/p/202508052339) | Aug 5, 2025 | Completed: final sign-off Sep 2025 | [364 Eddy St](https://www.permitgraph.org/a/0333/011) | 3rd floor bathroom remodel, replace tub with stall shower. | $10,000 |
| [202506259457](https://www.permitgraph.org/p/202506259457) | Jun 25, 2025 | Completed: final sign-off Aug 2025 | [364 Eddy St](https://www.permitgraph.org/a/0333/011) | 5th floor - bathroom remodel: replace bathtub with stall shower | $25,000 |
| [202502140389](https://www.permitgraph.org/p/202502140389) | Feb 14, 2025 | Completed: final sign-off Aug 2025 | [364 Eddy St](https://www.permitgraph.org/a/0333/011) | re-do bathroom wall + floor (2nd floor). replace room door at unit# 115. replace flooring + fix walls in unit# 117; 216 & 217. paint room # 117; 216 & 217. | $35,000 |
| [202203280995](https://www.permitgraph.org/p/202203280995) | Mar 28, 2022 | Completed: final sign-off Apr 2022 | [433 Ellis St](https://www.permitgraph.org/a/0333/021) | g/f restaurant: minor repair only, no structural work, no wall modification, install new 220 outlet, gas connection for appliance, repair damaged walls (approx 10 sq. ft.), replace damaged tiles (app… | $1,200 |
| [202107194649](https://www.permitgraph.org/p/202107194649) | Jul 19, 2021 | Completed: final sign-off Sep 2021 | [433 Ellis St](https://www.permitgraph.org/a/0333/021) | apt# 109 - kitchen upgrade. change base cabinets to stainless steel. replace old sink with new one. | $15,600 |
| [201809200959](https://www.permitgraph.org/p/201809200959) | Sep 20, 2018 | Completed: final sign-off Oct 2019 | [433 Ellis St](https://www.permitgraph.org/a/0333/021) | demo exisiting front entrance door, existing ramp & floor at entrance. construct platform & ada lift. construct a new glass wal & door at entrance. install replacement floor at entrance, remove entra… | $28,000 |
| [201706028280](https://www.permitgraph.org/p/201706028280) | Jun 2, 2017 | Completed: final sign-off Mar 2018 | [1970 36th Av](https://www.permitgraph.org/a/2099/059) | kitchen and bathroom remodel, add new bathroom in garage, exhaust fans in kitchen/bathroon, change exterior windows 7 aluminum to new wood aluminum clad, no proposed building expansion. | $148,000 |
| [201602260635](https://www.permitgraph.org/p/201602260635) | Feb 26, 2016 | Never finaled: issued Feb 2016, no final | [433 Ellis St](https://www.permitgraph.org/a/0333/021) | add electrical outlets in all rooms, 60 total. install tiles in front of common bathroom on 1st, 2nd and 3rd floors. | $6,200 |
| [201305217546](https://www.permitgraph.org/p/201305217546) | May 21, 2013 | Completed: final sign-off Aug 2013 | [433 Ellis St](https://www.permitgraph.org/a/0333/021) | to comply with ordinance 029-13 only; installation of grab bars in sro at the following location: public restrooms, min load rating 250 lbs | $480 |
| [201305217548](https://www.permitgraph.org/p/201305217548) | May 21, 2013 | Never finaled: issued May 2013, no final | [405 Valencia St](https://www.permitgraph.org/a/3554/029) | to comply with ordinance 029-13 only; installation of grab bars in sro at the following location:min load rating 250 lbs | $480 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/contractor/swift-construction-939223.