129 permits since 2000: 89 completed, 2 in progress, 24 never finaled, 14 expired or cancelled. Typically 0 days from filing to permit and 64 days from permit to final inspection. Of the 24 never-finaled permits, 2 are 3 to 5 years old, 6 are 5 to 10 years old, 16 are over 10 years old.

- Based in: Fremont
- On San Francisco permits: Feb 2000 to Apr 2026
- Last 24 months: 7 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2000 | 2 | 0 | 0 | 1 |
| 2001 | 1 | 0 | 0 | 0 |
| 2002 | 4 | 0 | 3 | 0 |
| 2003 | 3 | 0 | 0 | 0 |
| 2004 | 2 | 0 | 1 | 0 |
| 2005 | 4 | 0 | 1 | 2 |
| 2006 | 7 | 0 | 3 | 3 |
| 2007 | 8 | 0 | 2 | 3 |
| 2008 | 8 | 0 | 3 | 4 |
| 2009 | 1 | 0 | 0 | 0 |
| 2010 | 1 | 0 | 1 | 0 |
| 2011 | 6 | 0 | 0 | 1 |
| 2012 | 2 | 0 | 0 | 0 |
| 2014 | 2 | 0 | 1 | 0 |
| 2015 | 9 | 0 | 0 | 0 |
| 2016 | 2 | 0 | 1 | 0 |
| 2017 | 5 | 0 | 3 | 0 |
| 2018 | 3 | 0 | 1 | 0 |
| 2019 | 2 | 0 | 1 | 0 |
| 2021 | 4 | 0 | 2 | 0 |
| 2022 | 5 | 0 | 0 | 0 |
| 2023 | 1 | 0 | 1 | 0 |
| 2024 | 2 | 0 | 0 | 0 |
| 2025 | 2 | 2 | 0 | 0 |
| 2026 | 3 | 0 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Stairs | 1 | 1 | 0 | 0 | 0 | 1 | 66 |
| Kitchen remodel | 1 | 0 | 0 | 1 | 0 | 0 |  |

## Most recent permits

The 100 most recent of 129.

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202604139338](https://www.permitgraph.org/p/202604139338) | Apr 13, 2026 | Completed: final sign-off Apr 2026 | [1010 16th St](https://www.permitgraph.org/a/3833/006) | revision to pa# 202601023189: as-built, change to scope-ceiling removed from front end area. |  |
| [202601053199](https://www.permitgraph.org/p/202601053199) | Jan 5, 2026 | Completed: final sign-off Jan 2026 | [500 Beach St](https://www.permitgraph.org/a/0011/008) | modify (e) fire sprinkler system to accommodate new ceiling layout for "anchorage square" garage builing corner store - west tenant improvement, ref permit 202409201297. (revision/addendum to previou… |  |
| [202601023189](https://www.permitgraph.org/p/202601023189) | Jan 2, 2026 | Completed: final sign-off Apr 2026 | [1010 16th St](https://www.permitgraph.org/a/3833/002) | modify e) fire sprinker system for crack & battered t.i. ref to 202510147334 | $5,000 |
| [202512101428](https://www.permitgraph.org/p/202512101428) | Dec 10, 2025 | In progress: issued Dec 2025 | [580 Beach St](https://www.permitgraph.org/a/0011/007) | modify (e) fire sprinkler system to accommodate new ceiling under metal roof for anchorage square garage building corner store improvements ref pa 202409201298 | $1,400 |
| [202507291886](https://www.permitgraph.org/p/202507291886) | Jul 29, 2025 | Completed: final sign-off Aug 2025 | [350 Parnassus Av](https://www.permitgraph.org/a/1275/059) | modify existing fire sprinkler system to accomodate new ceiling layout of a new ante gown room inside of an existing clean room for parnassus. t.i. ref 202505146451 | $9,000 |
| [202502180483](https://www.permitgraph.org/p/202502180483) | Feb 18, 2025 | Completed: final sign-off Apr 2025 | [2800 Leavenworth St](https://www.permitgraph.org/a/0011/007) | install/modify: existing fire sprinklers to match new exterior soffit ceiling heights for anchorage square building 2 storefront replacements. associated with pa#2024-0920-1298 | $900 |
| [202502180486](https://www.permitgraph.org/p/202502180486) | Feb 18, 2025 | In progress: issued Feb 2025 | [500 Beach St](https://www.permitgraph.org/a/0011/008) | install/modify: existing fire sprinklers to match new exterior soffit ceiling heights for anchorage square building, 2 storefront replacements. associated with pa#2024-0920-1297 | $900 |
| [202409110570](https://www.permitgraph.org/p/202409110570) | Sep 11, 2024 | Completed: final sign-off Apr 2025 | [311 03rd St](https://www.permitgraph.org/a/3750/505) | modify (e) fire sprinkler system to accomodate ti changes for "dart bar" (ref #202402085494) | $13,000 |
| [202401174072](https://www.permitgraph.org/p/202401174072) | Jan 17, 2024 | Completed: final sign-off Jan 2024 | [188 Octavia St](https://www.permitgraph.org/a/0853/034) | modify existing fire sprinkler system to accommodate new walllayout for ti work under building pa# 202309076123. | $4,200 |
| [202305097360](https://www.permitgraph.org/p/202305097360) | May 9, 2023 | Never finaled: issued May 2023, no final | [3400 Laguna St](https://www.permitgraph.org/a/0471/003) | relocate 1-ssu type sprinkler for installation of new i-beam | $4,200 |
| [202305047083](https://www.permitgraph.org/p/202305047083) | May 4, 2023 | Completed: final sign-off Oct 2023 | [450 Shotwell St](https://www.permitgraph.org/a/3591/022) | 1/f and 2/f: install new fire sprinkler system on 2/f and revamp an existing fire sprinkler system on 1/f. ref ti permit 202303173904 | $44,000 |
| [202211015612](https://www.permitgraph.org/p/202211015612) | Nov 1, 2022 | Completed: final sign-off Feb 2023 | [1 Saint Francis Pl](https://www.permitgraph.org/a/3750/092) | bldg 5: change out (7)(e) sr ssp on 401 cap to new concealed ssp in common lobby & elevator lobby. voluntary fire only | $3,375 |
| [202211015610](https://www.permitgraph.org/p/202211015610) | Nov 1, 2022 | Completed: final sign-off Feb 2023 | [1 Saint Francis Pl](https://www.permitgraph.org/a/3750/092) | bldg 2: change out (7)(e) sr ssp on 401 cap to new concealed ssp in main & elevator lobbies. voluntary fire only | $3,375 |
| [202210134246](https://www.permitgraph.org/p/202210134246) | Oct 13, 2022 | Completed: final sign-off Dec 2022 | [465 California St](https://www.permitgraph.org/a/0260/015) | 9th fl: fire new walls and lights. relocate (4) existing ssp and plug off all heads in abandoned stairs.ref pa#202207067827. | $4,800 |
| [202207158546](https://www.permitgraph.org/p/202207158546) | Jul 15, 2022 | Completed: final sign-off Aug 2022 | [3400 Laguna St](https://www.permitgraph.org/a/0471/003) | unit 329m: fire sprinkler: change out 6 existing drop pendents sprinklers to new quick response concealed sprinklers. ref permit 202207067851 | $2,800 |
| [202207158547](https://www.permitgraph.org/p/202207158547) | Jul 15, 2022 | Completed: final sign-off Aug 2022 | [3400 Laguna St](https://www.permitgraph.org/a/0471/003) | unit 246m: fire sprinkler: change out 3 existing drop pendents to new type concealed sprinklers. ref permit 202207067854 | $2,800 |
| [202112033615](https://www.permitgraph.org/p/202112033615) | Dec 3, 2021 | Completed: final sign-off Mar 2022 | [500 03rd St](https://www.permitgraph.org/a/3776/115) | suite 110: due to addition of new walls & ceilings: relocate 13sp ssu, add 1 new sr ssu, add 1 new qr for new workshop extended ceiling. ref t.i. 202111122242. | $5,800 |
| [202112033616](https://www.permitgraph.org/p/202112033616) | Dec 3, 2021 | Never finaled: issued Jan 2022, no final | [1400 Geary Bl](https://www.permitgraph.org/a/0697/039) | level a: due to addition of new walk and celings and partial new mech: add 1 new ssu under duct. add 1 new srssu and relocate 2 (e) sr ssu for new full ht wall. add (n) sr concealed ssp, add change o… | $5,800 |
| [202108247014](https://www.permitgraph.org/p/202108247014) | Aug 24, 2021 | Completed: final sign-off Dec 2021 | [601 Van Ness Av](https://www.permitgraph.org/a/0762/026) | suite # 2030: install 33 sprinklers for tenant improvement | $7,500 |
| [202108247007](https://www.permitgraph.org/p/202108247007) | Aug 24, 2021 | Never finaled: issued Aug 2021, no final | [601 Van Ness Av](https://www.permitgraph.org/a/0762/026) | suite # 2038 2nd flr: relocate 17 and add 15 new heads. 32 total sprinklers for tenant improvement. | $7,500 |
| [202105200764](https://www.permitgraph.org/p/202105200764) | May 20, 2021 | Completed: final sign-off Aug 2021 | [444 Jessie St](https://www.permitgraph.org/a/3704/035) | add (6) new fire sprinklers for new egress corridor | $7,000 |
| [202104017771](https://www.permitgraph.org/p/202104017771) | Apr 1, 2021 | Completed: final sign-off Jun 2022 | [490 Post St](https://www.permitgraph.org/a/0296/015) | relocate 2 sprinklers for new ceiling height | $6,500 |
| [201911217828](https://www.permitgraph.org/p/201911217828) | Nov 21, 2019 | Completed: final sign-off Feb 2020 | [3400 Laguna St](https://www.permitgraph.org/a/0471/003) | unit 245. install concealed type pendent sprinkler in (e) sprinkler head locations | $4,200 |
| [201907267030](https://www.permitgraph.org/p/201907267030) | Jul 26, 2019 | Never finaled: issued Jul 2019, no final | [1 Saint Francis Pl](https://www.permitgraph.org/a/3750/092) | as-builts. rev to pa# 201904269022; revised drawings to include use of c900 piping |  |
| [201904269022](https://www.permitgraph.org/p/201904269022) | Apr 26, 2019 | Completed: final sign-off Aug 2019 | [1 Saint Francis Pl](https://www.permitgraph.org/a/3750/092) | replace underground piping to further rotting out; install isolation butterfly valves | $40,000 |
| [201812107832](https://www.permitgraph.org/p/201812107832) | Dec 10, 2018 | Completed: final sign-off Aug 2022 | [1550 Bryant St](https://www.permitgraph.org/a/3923/006) | add (1) (n) drop pedant sprinkler face new closet, use (e) mech tee for new supply | $2,800 |
| [201811085348](https://www.permitgraph.org/p/201811085348) | Nov 8, 2018 | Never finaled: issued Nov 2019, no final | [1550 Bryant St](https://www.permitgraph.org/a/3923/006) | due to correction by fire inspection - #1810-0012. install 7 concealed in phone booth (7) | $7,000 |
| [201810032079](https://www.permitgraph.org/p/201810032079) | Oct 3, 2018 | Completed: final sign-off Jan 2019 | [3400 Laguna St](https://www.permitgraph.org/a/0471/003) | relocate 3 sprinklers | $5,400 |
| [201802151340](https://www.permitgraph.org/p/201802151340) | Feb 15, 2018 | Completed: final sign-off Jan 2019 | [1550 Bryant St](https://www.permitgraph.org/a/3923/006) | add or relocate 44 fire sprinkler for new wall and ceiling ref pa 2018-0123-9238 | $10,000 |
| [201709279653](https://www.permitgraph.org/p/201709279653) | Sep 27, 2017 | Completed: final sign-off Jan 2018 | [3400 Laguna St](https://www.permitgraph.org/a/0471/003) | #244: f/s - total of 11 ssp type sprinklers to be installed. ref pa #201708316621. maher na | $4,500 |
| [201706270445](https://www.permitgraph.org/p/201706270445) | Jun 27, 2017 | Never finaled: issued Jun 2017, no final | [3220 Fulton St](https://www.permitgraph.org/a/1651/045) | relocate 4 pendent type sprinklers. t.i. pa#201705227261 | $4,200 |
| [201705317953](https://www.permitgraph.org/p/201705317953) | May 31, 2017 | Never finaled: issued May 2017, no final | [3400 Laguna St](https://www.permitgraph.org/a/0471/003) | new walls and new drop ceiling, change 2 e hsw to new con drop pendent sprinklers to new position change out existing semi rececessed sprinkler to concealed ref 201705176885 | $3,800 |
| [201703171660](https://www.permitgraph.org/p/201703171660) | Mar 17, 2017 | Completed: final sign-off Apr 2017 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | 4th flr: add 1 new ssp. relocate plug 1(e) ssp. ref 201702219801 maher na | $2,800 |
| [201703010361](https://www.permitgraph.org/p/201703010361) | Mar 1, 2017 | Never finaled: issued Mar 2017, no final | [160 Capp St](https://www.permitgraph.org/a/3570/039) | 2nd floor for new walls - add 2 new upright sprinklers. ref pa #201008128673 (for renewal #201203206487). | $2,800 |
| [201702280223](https://www.permitgraph.org/p/201702280223) | Feb 28, 2017 | Completed: final sign-off May 2022 | [1550 Bryant St](https://www.permitgraph.org/a/3923/006) | suite 360 for removal of wall plug 2 existing ssu for new walls and ceilings. add 8 new concealed ssp - using new mechanical tee for new supply ref#201612205497 | $2,800 |
| [201702018353](https://www.permitgraph.org/p/201702018353) | Feb 1, 2017 | Completed: final sign-off Jul 2017 | [3400 Laguna St](https://www.permitgraph.org/a/0471/003) | 3rd flr: suite 332, install new concealed type sprinkles 8 in (e) 401 type sprinkler locations maher na | $2,400 |
| [201701237629](https://www.permitgraph.org/p/201701237629) | Jan 23, 2017 | Completed: final sign-off Jan 2017 | [634 02nd St](https://www.permitgraph.org/a/3788/038) | install/relocate 10 pendent/upright sprinklers. ref app#201701137153. n/a for maher 4 relocate, 2 up & down, 2 add | $3,500 |
| [201607152429](https://www.permitgraph.org/p/201607152429) | Jul 15, 2016 | Never finaled: issued Jul 2016, no final | [3400 Laguna St](https://www.permitgraph.org/a/0471/003) | unit #326 - for new wall add (1) new concealed (ssp). fire sprinkler standard spray in kitchen. for ref. # 2016-0506-6845. | $2,800 |
| [201604013689](https://www.permitgraph.org/p/201604013689) | Apr 1, 2016 | Completed: final sign-off May 2016 | [3400 Laguna St](https://www.permitgraph.org/a/0471/003) | unit 324 - relocate 1 (e) ssp maher na | $3,800 |
| [201604013687](https://www.permitgraph.org/p/201604013687) | Apr 1, 2016 | Completed: final sign-off May 2016 | [3400 Laguna St](https://www.permitgraph.org/a/0471/003) | unit 325 - relocate 1 (e) ssp. maher na | $2,800 |
| [201511132494](https://www.permitgraph.org/p/201511132494) | Nov 13, 2015 | Completed: final sign-off Jan 2016 | [1400 Geary Bl](https://www.permitgraph.org/a/0697/039) | due to new entry add (1) (n) ssp using new 2x1 mech tee for supply egress only. ref pa 2015-0824-5150 | $3,900 |
| [201507010410](https://www.permitgraph.org/p/201507010410) | Jul 1, 2015 | Completed: final sign-off Jan 2016 | [55 Francisco St](https://www.permitgraph.org/a/0056/007) | add 26 ssp and relocate 2 (e) ssp, relocate 8 ssu, add 6 ssu. use new mech tee off main for new ssp. t.i. pa#201506048157. n/a ordinance #155-13 | $21,981 |
| [201507010405](https://www.permitgraph.org/p/201507010405) | Jul 1, 2015 | Completed: final sign-off Oct 2015 | [1599 Tennessee St](https://www.permitgraph.org/a/4295/009) | add one new ssp for new restroom. t.i. pa#201505206840. n/a ordinance #155-13 | $2,800 |
| [201505206744](https://www.permitgraph.org/p/201505206744) | May 20, 2015 | Completed: final sign-off Jul 2015 | [1400 Geary Bl](https://www.permitgraph.org/a/0697/039) | 4th floor/ unit 4c/d: add 1 new ssp using new 2x1 mt for new supply egress only ref pa 2015 0508 5733 | $3,900 |
| [201505015100](https://www.permitgraph.org/p/201505015100) | May 1, 2015 | Completed: final sign-off May 2015 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | studio 113- relocate 2 existing drop pendant sprinklers. studio 113/office 109- rework existing line, add 3 upright sprinklers, removal of cloud ceiling, demo 2 existing drop pendant sprinklers. t.i.… | $4,375 |
| [201503272018](https://www.permitgraph.org/p/201503272018) | Mar 27, 2015 | Completed: final sign-off May 2015 | [1400 Geary Bl](https://www.permitgraph.org/a/0697/039) | 6th flr: due to new entry, add (1) new ssp using new 2x1 mt for supply - egress only unit 6a | $3,900 |
| [201503100335](https://www.permitgraph.org/p/201503100335) | Mar 10, 2015 | Completed: final sign-off Nov 2015 | [340 Pine St](https://www.permitgraph.org/a/0260/007) | sprinklers- ceilings changed - relocate (13)(e) ssp and add (2)(n) ssp, plug (2) (e) ssp - for removal of (e) ceilings change 34(e) ssp and add 3 to new ssu ref pa 2015 0206 7665 maher - not req'd | $10,000 |
| [201503100338](https://www.permitgraph.org/p/201503100338) | Mar 10, 2015 | Completed: final sign-off Nov 2015 | [340 Pine St](https://www.permitgraph.org/a/0260/007) | for new wall, lights & ceilings - relocate (17)(e) ssp for removal of (e) ceilings change 10(e) ssp to new ssu ref pa 2015 0127 6929 maher - not req'd | $5,000 |
| [201501216183](https://www.permitgraph.org/p/201501216183) | Jan 21, 2015 | Completed: final sign-off Feb 2015 | [1400 Geary Bl](https://www.permitgraph.org/a/0697/039) | #6c/d- add 1 new ssp using new 2x1 m t for supply egress only. t.i app#201412194130 | $3,900 |
| [201411181735](https://www.permitgraph.org/p/201411181735) | Nov 18, 2014 | Completed: final sign-off Dec 2015 | [1439 Egbert Av](https://www.permitgraph.org/a/4912/016) | installation of a new fire sprinkler system per nfpa-13. work includes the 6-inch underground and 6-inch fire service. monitoring under separate permit. ref app# 2014 1006 8190; maher n/a | $35,516 |
| [201403120494](https://www.permitgraph.org/p/201403120494) | Mar 12, 2014 | Completed: final sign-off Apr 2014 | [410 Townsend St](https://www.permitgraph.org/a/3785/002A) | fire sprinklers: in light hazard studio, existing end lines shall be worked to add 4 new ssp, 1 new ssu and relocate 4 e ssu not to exceed pipe schedule for hazard.for new full ht walk for new pass t… | $7,000 |
| [201403049768](https://www.permitgraph.org/p/201403049768) | Mar 4, 2014 | Never finaled: issued Mar 2014, no final | [461 02nd St](https://www.permitgraph.org/a/3764/174) | relocate 5 (e) ssp. ref pa#2014.0131.7532. | $2,800 |
| [201210051383](https://www.permitgraph.org/p/201210051383) | Oct 5, 2012 | Completed: final sign-off Nov 2012 | [461 02nd St](https://www.permitgraph.org/a/3764/174) | for new wall add 3 new ssp and one ssu for raised floor. relocate one extg ssp.ti app#201207185161 | $5,000 |
| [201204047488](https://www.permitgraph.org/p/201204047488) | Apr 4, 2012 | Completed: final sign-off Jul 2012 | [99 Green St](https://www.permitgraph.org/a/0136/005) | 2nd floor-fire sprinkler t.i-add 6 pendent sprinkler, 3 new earthquake braces. t.i pa# 2012-0309-5798 | $3,500 |
| [201112150702](https://www.permitgraph.org/p/201112150702) | Dec 15, 2011 | Completed: final sign-off Jan 2012 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) | revision to 201109134434. added sprinklers under stadium seating and created as built drawings |  |
| [201109134434](https://www.permitgraph.org/p/201109134434) | Sep 13, 2011 | Completed: final sign-off Jan 2012 | [1098 Harrison St](https://www.permitgraph.org/a/3754/017) | fire sprinkler t.i. - add & relocate 63 sprinklers below new ceiling- upright heads to remain.. refer to pa #201108263324.new bracing and seismic calc's | $25,000 |
| [201107180413](https://www.permitgraph.org/p/201107180413) | Jul 18, 2011 | Completed: final sign-off Oct 2011 | [2550 Taylor St](https://www.permitgraph.org/a/0030/003) | 1st. & 2nd. floors: add &/or relocate 99 fire sprinklers. | $18,800 |
| [201106299134](https://www.permitgraph.org/p/201106299134) | Jun 29, 2011 | Expired or cancelled: cancelled Jan 2026 | [2550 Taylor St](https://www.permitgraph.org/a/0030/003) | add and or relocate 99 fire sprinklers | $18,800 |
| [201106158138](https://www.permitgraph.org/p/201106158138) | Jun 15, 2011 | Completed: final sign-off Jul 2011 | [799 Market St](https://www.permitgraph.org/a/3706/047) | 3rd floor-add & or relocate 15 fire sprinklers for construction of new changing room | $6,000 |
| [201104224656](https://www.permitgraph.org/p/201104224656) | Apr 22, 2011 | Completed: final sign-off May 2011 | [1160 Post St](https://www.permitgraph.org/a/0691/005) | obtain final inspection for work approved under pa# 2007-0511-1086. all work is complete |  |
| [201104224660](https://www.permitgraph.org/p/201104224660) | Apr 22, 2011 | Completed: final sign-off Apr 2011 | [1160 Post St](https://www.permitgraph.org/a/0691/005) | obtain final inspection for work approved under pa# 2007-0703-5797. all work is complete |  |
| [201006295504](https://www.permitgraph.org/p/201006295504) | Jun 29, 2010 | Never finaled: issued Jun 2010, no final | [175 Jefferson St](https://www.permitgraph.org/a/0013/006) | as built fire sprinkler drawings for pa# 2010.04.19.0458- 95 heads relocated on this pipe schedule system. | $32,000 |
| [201004190458](https://www.permitgraph.org/p/201004190458) | Apr 19, 2010 | Completed: final sign-off Sep 2010 | [175 Jefferson St](https://www.permitgraph.org/a/0013/006) | fire sprinklers: 1st fl: rework e ssp's and ssu's for new ceiling installation and new wall layout. 2nd fl: remove e piping in area of work and reinstall new mains and branchlines for new ceiling ins… | $3,200 |
| [200901069591](https://www.permitgraph.org/p/200901069591) | Jan 6, 2009 | Completed: final sign-off Feb 2009 | [101 Henry Adams St](https://www.permitgraph.org/a/3915/001) | ground floor fire sprinkler system - add 2 upright & 2 flush pendants for 2 new entry ways in project area. | $3,800 |
| [200812168610](https://www.permitgraph.org/p/200812168610) | Dec 16, 2008 | Completed: final sign-off Feb 2009 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | add 2 new pendent fire sprinklers. relocate 19 existing pendent sprinklers, plug 3 existing. upgrade seismic in work area. | $7,494 |
| [200811065975](https://www.permitgraph.org/p/200811065975) | Nov 6, 2008 | Completed: final sign-off Jan 2009 | [201 Mendell St](https://www.permitgraph.org/a/4570/026) | add 13 new fire sprinklers pendents for new walls & ceiling, relocate 14 new fire sprinkler pendents for new walls & ceiling, add 1 and relocate 2 upright sprinklers for new full height walls, plug 7… | $9,000 |
| [200810103933](https://www.permitgraph.org/p/200810103933) | Oct 10, 2008 | Expired or cancelled: expired Nov 2010 | [2960 Vallejo St](https://www.permitgraph.org/a/0956/011) | install new 13 d system in new gym basement( fire sprnkler) | $14,000 |
| [200808018213](https://www.permitgraph.org/p/200808018213) | Aug 1, 2008 | Expired or cancelled: expired Feb 2012 | [2 Henry Adams St](https://www.permitgraph.org/a/3910/001) | suite: 135: ground floor-revision to pa# 2008-0721-7093-relocate (e) branh line into soffit-add 7 new uprights into soffit, concealed space. revision to pa# 2008-0721-7093 | $3,500 |
| [200808018210](https://www.permitgraph.org/p/200808018210) | Aug 1, 2008 | Never finaled: issued Aug 2008, no final | [1000 Green St](https://www.permitgraph.org/a/0121/004) | b1 & b2 levels-add 10 new upright sprinklers for new storage lockers/cabinets | $3,500 |
| [200807217093](https://www.permitgraph.org/p/200807217093) | Jul 21, 2008 | Expired or cancelled: expired Feb 2012 | [2 Henry Adams St](https://www.permitgraph.org/a/3910/001) | g/f #135: add 6 new pendents at window and entry. add 7 new pendents for new battons. replace e uprights (21 total) to 8 k factor | $8,000 |
| [200806255261](https://www.permitgraph.org/p/200806255261) | Jun 25, 2008 | Completed: final sign-off Nov 2008 | [101 Henry Adams St](https://www.permitgraph.org/a/3915/001) | due to new drop ceiling at entry, add 2 new conceiled fire sprinkler pendent heads. | $2,800 |
| [200806174634](https://www.permitgraph.org/p/200806174634) | Jun 17, 2008 | Expired or cancelled: expired Oct 2012 | [835 Howard St](https://www.permitgraph.org/a/3733/084) | tie in (n) 2 1/2 main into (e) e" main in (basement) run (n) 2 1/2" main to 3rd floor to pipe 6 (n) window sprinklers. | $38,000 |
| [200804180031](https://www.permitgraph.org/p/200804180031) | Apr 18, 2008 | Completed: final sign-off May 2008 | [160 Spear St](https://www.permitgraph.org/a/3717/011) | 10th floor: fire sprinkler system on 10th floor. 6 pendents, relocate 7 heads, plug in 1 head | $3,000 |
| [200803278144](https://www.permitgraph.org/p/200803278144) | Mar 27, 2008 | Completed: final sign-off May 2008 | [375 Alabama St](https://www.permitgraph.org/a/3966/002) | 3rd floor, suite 350 and suite 325: add 20 pendent fire sprinklers and add 22 upright sprinklers. | $10,000 |
| [200803278143](https://www.permitgraph.org/p/200803278143) | Mar 27, 2008 | Completed: final sign-off May 2008 | [160 Spear St](https://www.permitgraph.org/a/3717/011) | 15th floor, suite 1500 - add 3 new fire sprinklers, relocate 13 (e) fire sprinkler, plug 4 (e) fire sprinklers. | $4,000 |
| [200803046229](https://www.permitgraph.org/p/200803046229) | Mar 4, 2008 | Completed: final sign-off Apr 2008 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | 4th floor-add 3 and relocate 8 fire sprinklers for new wall layout | $2,800 |
| [200803046230](https://www.permitgraph.org/p/200803046230) | Mar 4, 2008 | Never finaled: issued Mar 2008, no final | [160 Spear St](https://www.permitgraph.org/a/3717/010) | 11th floor-add 8 new fire sprinklers for new wall layout. relocate 2 (e) fire sprinklers for new wall layout. | $2,800 |
| [200802064144](https://www.permitgraph.org/p/200802064144) | Feb 6, 2008 | Completed: final sign-off May 2008 | [160 Spear St](https://www.permitgraph.org/a/3717/011) | relocate 3 (e) ssp's for new wall configuration, plug off 1 (e) pendant on 11th floor. | $4,800 |
| [200802064145](https://www.permitgraph.org/p/200802064145) | Feb 6, 2008 | Never finaled: issued Feb 2008, no final | [160 Spear St](https://www.permitgraph.org/a/3717/011) | 11th floor suite 1120 for fire sprinkler, add 1 (n) ssp & relocate 4 (e) ssp's for new wall construction, cut back 1(e) ssp for new ceiling installation. | $4,800 |
| [200712059644](https://www.permitgraph.org/p/200712059644) | Dec 5, 2007 | Expired or cancelled: expired Jul 2009 | [128 Duboce Av](https://www.permitgraph.org/a/3502/021) | fire sprinkler system on basement floor. nov per housing inspector. install 3 new sidewall sprinklers for (e) trash enclosure. | $4,000 |
| [200711077511](https://www.permitgraph.org/p/200711077511) | Nov 7, 2007 | Never finaled: issued Nov 2007, no final | [160 Spear St](https://www.permitgraph.org/a/3717/010) | suite #300- relocate 3 existing sprinkler heads and plug one existing head in suite 300 due to the office renovation approved permit aplication #200708230630. | $2,800 |
| [200711077515](https://www.permitgraph.org/p/200711077515) | Nov 7, 2007 | Completed: final sign-off Jan 2008 | [375 Alabama St](https://www.permitgraph.org/a/3966/002) | fire sprinkler work -on 1st floor: relocate 1 head, install 3 new heads, plug 6 heads; on 3rd floor: relocate 1 head, install 14 new heads, and plug 22 heads. | $7,500 |
| [200710296662](https://www.permitgraph.org/p/200710296662) | Oct 29, 2007 | Never finaled: issued Oct 2007, no final | [160 Spear St](https://www.permitgraph.org/a/3717/011) | 17th floor, suite #1700 - due to the removal of wallss and soffit. plug off (4) existing pendents and relocate (3) existing pendents. | $2,800 |
| [200710246294](https://www.permitgraph.org/p/200710246294) | Oct 24, 2007 | Completed: final sign-off Jul 2009 | [600 Townsend St](https://www.permitgraph.org/a/3783/008) | sprinkler modification: 1st floor,add 4 relocate 9 | $3,500 |
| [200710226115](https://www.permitgraph.org/p/200710226115) | Oct 22, 2007 | Completed: final sign-off Jan 2008 | [1475 Fillmore St](https://www.permitgraph.org/a/0725/018) | relocate 18 existing pendent heads, add 2 new heads- ground floor commercial only. | $7,922 |
| [200710155340](https://www.permitgraph.org/p/200710155340) | Oct 15, 2007 | Completed: final sign-off Dec 2007 | [555 09th St](https://www.permitgraph.org/a/3781/003) | 1st floor - 18 relocates of sprinklers below new ceiling. ref. arch. #2007.04.06.8242. | $3,800 |
| [200709051712](https://www.permitgraph.org/p/200709051712) | Sep 5, 2007 | Completed: final sign-off Oct 2007 | [160 Spear St](https://www.permitgraph.org/a/3717/011) | work @ suite# 1150 only. due to the addition of new 1 hour rated corridor & new walls in the countrywide t.i. space. add 4 new pendent heads & relocate 9 (e) pendents & plug off 1 (e) pendent. | $4,000 |
| [200709051720](https://www.permitgraph.org/p/200709051720) | Sep 5, 2007 | Completed: final sign-off Oct 2007 | [160 Spear St](https://www.permitgraph.org/a/3717/011) | suite#330. due to new partition walls relocate 6 existing pendents, and add 2 new pendents matche existing pendents. | $2,500 |
| [200707116439](https://www.permitgraph.org/p/200707116439) | Jul 11, 2007 | Completed: final sign-off Aug 2007 | [2 Henry Adams St](https://www.permitgraph.org/a/3910/001) | #291- due to addition of new walls and new ceiling. relocate 4 existing upright heads and add 2 new pendent sprinklers. | $2,500 |
| [200707035797](https://www.permitgraph.org/p/200707035797) | Jul 3, 2007 | Expired or cancelled: expired Jul 2009 | [1160 Post St](https://www.permitgraph.org/a/0691/005) | work on ground floor. due to new walls & ceilings. relocate 2 (e) line & add or relocate 92 sprinkler heads. | $19,700 |
| [200703297562](https://www.permitgraph.org/p/200703297562) | Mar 29, 2007 | Completed: final sign-off Jul 2007 | [101 Henry Adams St](https://www.permitgraph.org/a/3915/001) | pipe & pendent head - replace uprights 16 total upright | $5,000 |
| [200703085702](https://www.permitgraph.org/p/200703085702) | Mar 8, 2007 | Expired or cancelled: expired Feb 2008 | [16 Maiden Ln](https://www.permitgraph.org/a/0310/022) | cancel 2 extg pendents. relocate 7 | $3,000 |
| [200612079332](https://www.permitgraph.org/p/200612079332) | Dec 7, 2006 | Expired or cancelled: expired Feb 2012 | [2 Henry Adams St](https://www.permitgraph.org/a/3910/001) | add 10 heads, relocate 2 pendents. relocate 3 uprights, delete 1 up | $4,454 |
| [200611167823](https://www.permitgraph.org/p/200611167823) | Nov 16, 2006 | Never finaled: issued Nov 2006, no final | [600 Townsend St](https://www.permitgraph.org/a/3783/008) | 3rd floor/371e-due to new full height walls, relocate up right 12 total and one side wall. all heads (e), no adds. | $6,000 |
| [200611167821](https://www.permitgraph.org/p/200611167821) | Nov 16, 2006 | Completed: final sign-off May 2007 | [1555 Mariposa St](https://www.permitgraph.org/a/4005/007) | as builts to pa# 200604209416. |  |
| [200609071575](https://www.permitgraph.org/p/200609071575) | Sep 7, 2006 | Completed: final sign-off Nov 2006 | [821 Folsom St](https://www.permitgraph.org/a/3752/394) | due to new walls, add 3 pendents and 9 uprights, relocate 3 upright, harzard change from ord to light. | $5,000 |
| [200608109086](https://www.permitgraph.org/p/200608109086) | Aug 10, 2006 | Completed: final sign-off Nov 2006 | [2800 Leavenworth St](https://www.permitgraph.org/a/0011/007) | relocate 18 pendants due to new walls and ceiling. unit 7 | $5,000 |
| [200607277740](https://www.permitgraph.org/p/200607277740) | Jul 27, 2006 | Completed: final sign-off Jan 2007 | [101 Henry Adams St](https://www.permitgraph.org/a/3915/001) | due to new soffitt & ceiling, add 8 new pendent heads - ord. #1 pipe schedule | $4,000 |
| [200606295305](https://www.permitgraph.org/p/200606295305) | Jun 29, 2006 | Never finaled: issued Aug 2006, no final | [200 Jennings St](https://www.permitgraph.org/a/4570/023) | new storage bldg overhead and underground piping reference to building permit application #200603035912 | $35,000 |
| [200604209416](https://www.permitgraph.org/p/200604209416) | Apr 20, 2006 | Completed: final sign-off May 2007 | [1555 Mariposa St](https://www.permitgraph.org/a/4005/005) | cut back under ground by 8ft to relocate supply penitratim for new t.i. relocate riser and fdc stand pipe and reconnect to overhead. due to new mezinine add 4 pendent heads. | $10,000 |

---