5 permits since 2000: 2 completed, 1 in progress, 1 never finaled, 1 expired or cancelled. Typically 131 days from filing to permit and 588 days from permit to final inspection. Of the 1 never-finaled permit, 1 is 3 to 5 years old. 1 was filed but never issued.

- Based in: Santa Rosa
- On San Francisco permits: Jul 2022 to Dec 2025
- Last 24 months: 2 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2022 | 1 | 0 | 0 | 0 |
| 2023 | 0 | 0 | 1 | 0 |
| 2024 | 1 | 0 | 0 | 0 |
| 2025 | 0 | 1 | 0 | 1 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [S20251218402](https://www.permitgraph.org/p/S20251218402) | Dec 19, 2025 | In progress: issued Apr 2026 | [33 Robinhood Dr](https://www.permitgraph.org/a/2991/035) | solar permit: installing 35 solar pv modules, 420 watts per module, total no. of rating 14.7 kw. mounted: roof, ballasted: n, including 2 energy storage unit, of 240 vac, with 13.5 kwh each in capaci… |  |
| [S20250821020](https://www.permitgraph.org/p/S20250821020) | Aug 27, 2025 | Expired or cancelled: cancelled Sep 2025 | [1271 46th Av](https://www.permitgraph.org/a/1704/015) | solar permit: installing 12 solar pv modules, 420 watts per module, total no. of rating 5.04 kw. mounted: roof, ballasted: n, including 2 energy storage unit, with 13.5 kwh each in capacity, ess unit… | $58,000 |
| [202408279596](https://www.permitgraph.org/p/202408279596) | Aug 27, 2024 | Completed: final sign-off Sep 2025 | [2290 Green St](https://www.permitgraph.org/a/0539/017) | revision 202207198868: correct project scope description pv solar (4.8 kw) ess 27.0 kw. as built: a. add e stop in front of sfd b. change circuits in gateway (2-30a) c. add 2nd dissconnect for batter… |  |
| [202310259390](https://www.permitgraph.org/p/202310259390) | Oct 25, 2023 | Never finaled: filed Oct 2023, never issued | [2290 Green St](https://www.permitgraph.org/a/0539/017) | revision to permit# 202207188868: as-built planset - showing 2 ac disconnects |  |
| [202207198868](https://www.permitgraph.org/p/202207198868) | Jul 19, 2022 | Completed: final sign-off Sep 2025 | [2290 Green St](https://www.permitgraph.org/a/0539/017) | install a new 8.0kw roof mounted pv system with ess (28 kwh total capacity in garage) | $3,500 |

---