# Stoer Construction Inc

Contractor license 1000445. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/stoer-construction-inc-1000445
- JSON: https://www.permitgraph.org/api/contractor?license=1000445
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=1000445

7 permits since 2000: 6 completed, 1 expired or cancelled. Typically 182 days from filing to permit and 984 days from permit to final inspection.

- Based in: San Jose
- On San Francisco permits: Jul 2018 to Apr 2022
- Last 24 months: 0 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2018 | 3 | 0 | 0 | 0 |
| 2020 | 2 | 0 | 0 | 1 |
| 2022 | 1 | 0 | 0 | 0 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202204011394](https://www.permitgraph.org/p/202204011394) | Apr 1, 2022 | Completed: final sign-off Apr 2023 | [345 04th St](https://www.permitgraph.org/a/3751/165) | revision to 201807194942. update fire pump from 75hp to 40hp, update full load amps, update fire pump controller. update fire pump meter fsb to show 400a breaker. add calculations for lra at 312a so.… |  |
| [202009295390](https://www.permitgraph.org/p/202009295390) | Sep 29, 2020 | Completed: final sign-off Jan 2023 | [345 04th St](https://www.permitgraph.org/a/3751/165) | installation of new fire 6" service for commercial building | $40,000 |
| [202008282836](https://www.permitgraph.org/p/202008282836) | Aug 28, 2020 | Completed: final sign-off Nov 2022 | [345 04th St](https://www.permitgraph.org/a/3751/165) | stormwater plan review. ref new construction pa# 201807194942. |  |
| [202003036033](https://www.permitgraph.org/p/202003036033) | Mar 3, 2020 | Expired or cancelled: withdrawn Apr 2023 | [345 04th St](https://www.permitgraph.org/a/3751/165) | revision to bpa #201807194942. structural conversion of the fixed head pile assembly. design has changed to utilize deeper pile embedment into the pile. **maher n/a** |  |
| [201811307118](https://www.permitgraph.org/p/201811307118) | Nov 30, 2018 | Completed: final sign-off Dec 2022 | [345 04th St](https://www.permitgraph.org/a/3751/165) | shoring for future work. maher n/a. | $143,000 |
| [201811307103](https://www.permitgraph.org/p/201811307103) | Nov 30, 2018 | Completed: final sign-off Dec 2022 | [343 04th St](https://www.permitgraph.org/a/3751/165) | demolish 2-story, type 1, office building. maher n/a. | $432,700 |
| [201807194942](https://www.permitgraph.org/p/201807194942) | Jul 19, 2018 | Completed: final sign-off Jun 2023 | [345 04th St](https://www.permitgraph.org/a/3751/165) | to erect 7 stories, no basement, type i-b, office building. ** disturbance of at least 50 cu.yd. of soil, route to dph ** | $15,000,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/stoer-construction-inc-1000445.