Steven Liao Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Sep 2002 to Sep 2026
- Last 24 months
- 7 permits filed
68 permits since 2000: 61 completed, 4 in progress, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
11 stairs permits: 11 completed. Typically 6 days from filing to permit and 262 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 29, 2025 | Completed final sign-off Jun 2026 | 655 37th Av | comply w/ nov 202535164: 1/f (n) bedrooms, (n) media, (n) home office, storage, & bathroom. 2/f remodel kitchen & bathroom. demo (e) stair, new interior stair. infill south facing lightwell & (n) rear 1 level deck.Details
comply w/ nov 202535164: 1/f (n) bedrooms, (n) media, (n) home office, storage, & bathroom. 2/f remodel kitchen & bathroom. demo (e) stair, new interior stair. infill south facing lightwell & (n) rear 1 level deck. | $210,800 |
| Aug 24, 2022 | Completed final sign-off Aug 2023 | 870 48th Av | legalize second unit. 1) construct 2 bedrooms, one full bathrm, media rm & remodel one extg kitchen, bathrm at ground fl. 2) remodel extg kchn, bathrm, construct 1 nw full bathrm, study rm & replace (e) sheet rock with new at 2/f. 3) construct new deck with staircase at rear of house.Details
legalize second unit. 1) construct 2 bedrooms, one full bathrm, media rm & remodel one extg kitchen, bathrm at ground fl. 2) remodel extg kchn, bathrm, construct 1 nw full bathrm, study rm & replace (e) sheet rock with new at 2/f. 3) construct new deck with staircase at rear of house. | $148,000 |
| Jun 3, 2022 | Completed final sign-off Sep 2022 | 145 Shields St | revision to pa #202112104237: comply w/ nov #201893241 - 1 bathroom to be relocated at g/f.relocate the last five steps at stairsDetails
revision to pa #202112104237: comply w/ nov #201893241 - 1 bathroom to be relocated at g/f.relocate the last five steps at stairs | |
| Apr 23, 2019 | Completed final sign-off Mar 2020 | 32 South Hill Bl | construct 3 bedrooms, 2 full bathrooms & family room @ ground floor; relocate (e) kitchen, bathroom; add 1 new bathroom & remodel 3 bedrooms @ 2nd floor; re-built (e) interior stair case from 2nd fl down to ground floorDetails
construct 3 bedrooms, 2 full bathrooms & family room @ ground floor; relocate (e) kitchen, bathroom; add 1 new bathroom & remodel 3 bedrooms @ 2nd floor; re-built (e) interior stair case from 2nd fl down to ground floor | $110,000 |
| Jun 26, 2018 | Completed final sign-off Aug 2019 | 444 Lawton St | create habitable space on 1st flr connected to 2nd flr unit with (ne) interior stair. add master nedroom, bath & family rm. interior renos at 2nd flr - remodel kitchen, add laundry closet, add exterior stair connecting 3rd flr to roof terraceDetails
create habitable space on 1st flr connected to 2nd flr unit with (ne) interior stair. add master nedroom, bath & family rm. interior renos at 2nd flr - remodel kitchen, add laundry closet, add exterior stair connecting 3rd flr to roof terrace | $150,000 |
| Oct 7, 2016 | Completed final sign-off Aug 2017 | 955 Delano Av | remodel e kitchen 1 bath, add 1 new bath and convert e dining room into bedroom. relocate interior staircase at 2nd fl. construct 2 bedrooms, 2 full baths, storage rm at gr fl. rewire elec and lighting in e playrm at basement levelDetails
remodel e kitchen 1 bath, add 1 new bath and convert e dining room into bedroom. relocate interior staircase at 2nd fl. construct 2 bedrooms, 2 full baths, storage rm at gr fl. rewire elec and lighting in e playrm at basement level | $68,000 |
| May 20, 2015 | Completed final sign-off Feb 2016 | 1867 22nd Av | construct one new bath, bedroom, family room & storage on ground floor. construct new less than 10 ft high deck & stair at rear yard.Details
construct one new bath, bedroom, family room & storage on ground floor. construct new less than 10 ft high deck & stair at rear yard. | $50,000 |
| Nov 3, 2014 | Completed final sign-off Apr 2015 | 235 Lee Av | remodel (e) social rm & bathrm; relocate interior stair; add one (n) bedroom, bathrm,& exercise area; leaglize two (e) storage rm on ground floor. add one (n) bathroom on 2nd floor. replace (e) furnace & water heater.Details
remodel (e) social rm & bathrm; relocate interior stair; add one (n) bedroom, bathrm,& exercise area; leaglize two (e) storage rm on ground floor. add one (n) bathroom on 2nd floor. replace (e) furnace & water heater. | $38,000 |
| May 22, 2013 | Completed final sign-off Aug 2013 | 474 Faxon Av | replace 14 windows, front window use milgard fiberglass with wood clad series, dry rot repair at bay window area and stair handrail area, complete to match existing finishedDetails
replace 14 windows, front window use milgard fiberglass with wood clad series, dry rot repair at bay window area and stair handrail area, complete to match existing finished | $10,000 |
| Nov 30, 2009 | Completed final sign-off Mar 2010 | 96 Manor Dr | dry rot repair at back of the house bay window area, 2 side baywindow area & front stair area. total of 300 sq ft. repair stucco to match existing.Details
dry rot repair at back of the house bay window area, 2 side baywindow area & front stair area. total of 300 sq ft. repair stucco to match existing. | $8,000 |
| Jun 11, 2004 | Completed final sign-off Jul 2004 | 82 Brighton Av | replace dryrot @front stair & front porch.remove interior plaster,install insulation new sheetrock &Details
replace dryrot @front stair & front porch.remove interior plaster,install insulation new sheetrock & | $13,000 |