Back to bathroom remodel contractors
Spotlight Construction Groups Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2001 to Jun 2026
- Last 24 months
- 13 permits filed
132 permits since 2000: 108 completed, 4 in progress, 16 never finaled, 4 expired or cancelled.
Of the 16 never-finaled permits, 4 are 3 to 5 years old, 3 are 5 to 10 years old, 9 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
43 bathroom remodel permits: 39 completed, 1 in progress, 2 never finaled, 1 expired or cancelled. Typically 12 days from filing to permit and 210 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 30, 2025 | In progress issued Feb 2026 | 2837 Santiago St | remodel of (e) family room on 1st fl. add bedroom, bathroom, kitchenette, walk in closet and laundry closetDetails
remodel of (e) family room on 1st fl. add bedroom, bathroom, kitchenette, walk in closet and laundry closet | $40,000 |
| Dec 8, 2025 | Completed final sign-off Jun 2026 | 132 Grattan St | revision to pa # 202408128448: reconfigure sauna room & bathroom at g/f. reconfigure staircase at rear of house. no plumbing fixtures.Details
revision to pa # 202408128448: reconfigure sauna room & bathroom at g/f. reconfigure staircase at rear of house. no plumbing fixtures. | |
| Nov 26, 2025 | Completed final sign-off Mar 2026 | 270 Arleta Av | 1st fl. remodel: convert (e) family room to 2 new bedrooms. relocate (e) bathroom. new wet bar.Details
1st fl. remodel: convert (e) family room to 2 new bedrooms. relocate (e) bathroom. new wet bar. | $50,000 |
| Dec 11, 2024 | Completed final sign-off Sep 2025 | 653 Bowdoin St | provide new rooms ground floor (638 sq ft) consisting of family room, bedroom, and a 3-fixture bathroom in existing garage.Details
provide new rooms ground floor (638 sq ft) consisting of family room, bedroom, and a 3-fixture bathroom in existing garage. | $90,000 |
| Aug 12, 2024 | Completed final sign-off Jun 2026 | 132 Grattan St | construct bdrm, sauna rm, and bath at gr fl. construct interior stair from 2nd fl to gr fl. new deck w staircase at rear of house 9'3x 4'x 7' hDetails
construct bdrm, sauna rm, and bath at gr fl. construct interior stair from 2nd fl to gr fl. new deck w staircase at rear of house 9'3x 4'x 7' h | $120,000 |
| Jul 23, 2024 | Completed final sign-off Apr 2025 | 172 Los Palmos Dr | revision to pa#202402135851: 1) first floor new closet. 2) second floor: remove ext wall between extg living room and extg kitchen. 3)2nd floor: new bathroom and closets. 4)delete new skylight.Details
revision to pa#202402135851: 1) first floor new closet. 2) second floor: remove ext wall between extg living room and extg kitchen. 3)2nd floor: new bathroom and closets. 4)delete new skylight. | $5,000 |
| Feb 13, 2024 | Completed final sign-off Apr 2025 | 172 Los Palmos Dr | 1/f:replace laundry,n bathroom, bedroom, media room. 2/f: remodel kitchen and bathroom, new bathroom, demo fireplace - remove all sheetrock and replce with (n) 5/8in gyp type-x board, (n) 2x2 skylight on flatroof.Details
1/f:replace laundry,n bathroom, bedroom, media room. 2/f: remodel kitchen and bathroom, new bathroom, demo fireplace - remove all sheetrock and replce with (n) 5/8in gyp type-x board, (n) 2x2 skylight on flatroof. | $180,000 |
| Nov 6, 2023 | Completed final sign-off Oct 2024 | 740 Cayuga Av | remodel (e) kitchen and bathroom. remove the (e) wall between kitchen and dinning room.Details
remodel (e) kitchen and bathroom. remove the (e) wall between kitchen and dinning room. | $70,000 |
| Oct 30, 2023 | Completed final sign-off Feb 2024 | 1570 Clay St | remodel bathroom and kitchen in-kind for unit 1570, 1572 & 1574.Details
remodel bathroom and kitchen in-kind for unit 1570, 1572 & 1574. | $80,000 |
| Jul 18, 2023 | Completed final sign-off Sep 2025 | 2472 34th Av | 1/f: remodel/legalize (e) bedrooms, and (e) bath. relocate (e) water heater and replace furnace. add (n) home office. 2/f: remodel (e) bathroom, kitchen and new wiring.Details
1/f: remodel/legalize (e) bedrooms, and (e) bath. relocate (e) water heater and replace furnace. add (n) home office. 2/f: remodel (e) bathroom, kitchen and new wiring. | $177,800 |
| May 17, 2023 | Completed final sign-off Dec 2023 | 122 Detroit St | partial (1) bathroom remodel. replace shower tub to shower pan. one outlet installation(receptacle)Details
partial (1) bathroom remodel. replace shower tub to shower pan. one outlet installation(receptacle) | $2,000 |
| Apr 3, 2023 | Completed final sign-off Sep 2023 | 94 Thrift St | construct 2 bedroom, 1 full bath, & media room w/ wet bar at g/f. remodel (e) kitchen & 2 bathroom on 2/f. repair (e) deck at rear in-kind.Details
construct 2 bedroom, 1 full bath, & media room w/ wet bar at g/f. remodel (e) kitchen & 2 bathroom on 2/f. repair (e) deck at rear in-kind. | $183,500 |
| Aug 3, 2022 | Completed final sign-off Jul 2023 | 400 Gates St | rev to pa202205174453: reconfigure 2/f closet and bathroom layout per plan. replace all exterior siding per plan. change structural beam to steel beam and hydronic floor heating.Details
rev to pa202205174453: reconfigure 2/f closet and bathroom layout per plan. replace all exterior siding per plan. change structural beam to steel beam and hydronic floor heating. | $6,000 |
| Jun 30, 2022 | Completed final sign-off Sep 2023 | 3700 Cabrillo St | unit 302 - remodel of (e) kitchen and bathroom on 4th floor.Details
unit 302 - remodel of (e) kitchen and bathroom on 4th floor. | $38,000 |
| May 17, 2022 | Completed final sign-off Jul 2023 | 400 Gates St | 1/f: remodel (e) space to new kitchen, living and new laundry, toilet. 2/f: new bedrooms and bathrooms. new interior stair. replace new windows. new foundation and slab.Details
1/f: remodel (e) space to new kitchen, living and new laundry, toilet. 2/f: new bedrooms and bathrooms. new interior stair. replace new windows. new foundation and slab. | $98,000 |
| Oct 21, 2021 | Completed final sign-off Mar 2023 | 453 Marietta Dr | construct 1 bedroom & 1 full bath at ground floor. remodel (e) kitchen, 1 bathroom, and replace 3 windows on 2nd floor. install (n) 3' x 3' skylight.Details
construct 1 bedroom & 1 full bath at ground floor. remodel (e) kitchen, 1 bathroom, and replace 3 windows on 2nd floor. install (n) 3' x 3' skylight. | $78,000 |
| Oct 12, 2021 | Completed final sign-off Nov 2023 | 343 London St | interior remodel: 1st floor to add a media room, a study room, and a full bathroom. 2nd floor: to remodel extg kitchen, bathroom, add a interior stair connected to 1st floor.Details
interior remodel: 1st floor to add a media room, a study room, and a full bathroom. 2nd floor: to remodel extg kitchen, bathroom, add a interior stair connected to 1st floor. | $80,000 |
| Mar 10, 2021 | Never finaled filed Mar 2021, never issued | 25 Grafton Av | demolish three storage sheds and add a 2-story accessory dwelling unit at rear yard, including living/dining, bedroom, bathroom and kitchen.Details
demolish three storage sheds and add a 2-story accessory dwelling unit at rear yard, including living/dining, bedroom, bathroom and kitchen. | $80,000 |
| Oct 13, 2020 | Completed final sign-off Jun 2021 | 2720 41st Av | construct 1 bedroom, 1 media room/laundry, 1 full bath on ground floor. remodel (e) kitchen & bathroom in-kind at 2nd floor.Details
construct 1 bedroom, 1 media room/laundry, 1 full bath on ground floor. remodel (e) kitchen & bathroom in-kind at 2nd floor. | $48,000 |
| Jul 2, 2020 | Completed final sign-off Jan 2022 | 570 27th Av | comply w/ #201998321: 1)re-install kitchen & bathroom. replace (n) insulation, sheetrock, re-wire all elec. on 2nd floor (570 27th av). 2)re-install kitchen & bathroom. replace (n) insulation, sheetrock, re-wire all elec. on grd floor (572 27th av). window replacement will be under separate permit.Details
comply w/ #201998321: 1)re-install kitchen & bathroom. replace (n) insulation, sheetrock, re-wire all elec. on 2nd floor (570 27th av). 2)re-install kitchen & bathroom. replace (n) insulation, sheetrock, re-wire all elec. on grd floor (572 27th av). window replacement will be under separate permit. | $82,000 |
| May 28, 2020 | Completed final sign-off Oct 2020 | 118 Huntington Dr | kitchen and bathroom remodeling of existing single family dwelling. all remodel work in-kind.Details
kitchen and bathroom remodeling of existing single family dwelling. all remodel work in-kind. | $25,000 |
| Feb 6, 2020 | Completed final sign-off Mar 2021 | 1457 09th Av | remodel e kitchen and 2 baths of residential unit 1457 a 2nd flDetails
remodel e kitchen and 2 baths of residential unit 1457 a 2nd fl | $40,000 |
| Mar 26, 2019 | Expired or cancelled cancelled Jul 2019 | 2 Nahua Av | complete remodel kitchen and bathroom. kitchen 10'x10', bathroom 8'x8'Details
complete remodel kitchen and bathroom. kitchen 10'x10', bathroom 8'x8' | $32,908 |
| Jun 27, 2017 | Completed final sign-off Jan 2019 | 1475 Plymouth Av | adding family room, bathroom, and closet on basement level of s.f.d. add (2) 7'x1'6" wood interior w/ aluminum clad windows on north side of buildingDetails
adding family room, bathroom, and closet on basement level of s.f.d. add (2) 7'x1'6" wood interior w/ aluminum clad windows on north side of building | $50,000 |
| Jan 12, 2017 | Completed final sign-off Apr 2019 | 2215 19th Av | 1st fl add 2 bedrooms, family room, 1 full bath and laundry. 2nd fl reconfigure internal stairs, remodel 2 baths, kitchenDetails
1st fl add 2 bedrooms, family room, 1 full bath and laundry. 2nd fl reconfigure internal stairs, remodel 2 baths, kitchen | $120,000 |
| Oct 31, 2016 | Completed final sign-off Sep 2017 | 28 Precita Av | conversion of the (e) family room into bedroom 2. conversion of the (e) bedroom 2 into bath 2 & a walk-in closet for the new bedroom 2. the proposed bath will have a new window & skylight.Details
conversion of the (e) family room into bedroom 2. conversion of the (e) bedroom 2 into bath 2 & a walk-in closet for the new bedroom 2. the proposed bath will have a new window & skylight. | $7,600 |
| Mar 15, 2016 | Completed final sign-off Jan 2017 | 1300 Plymouth Av | renovation of extg s.f.d. relocate extg kitchen, bedroom, bathroom and laundry. add one bathroom, replace extg exterior siding. upgrade extg wooden windows in kind.Details
renovation of extg s.f.d. relocate extg kitchen, bedroom, bathroom and laundry. add one bathroom, replace extg exterior siding. upgrade extg wooden windows in kind. | $60,000 |
| Jul 30, 2015 | Never finaled issued Mar 2016, no final | 2215 19th Av | replace damage drywall, replace insulation. replace cabinet in bathroom. replace roof sheeting, repair 3 cut rafters per fire damage.Details
replace damage drywall, replace insulation. replace cabinet in bathroom. replace roof sheeting, repair 3 cut rafters per fire damage. | $5,000 |
| Oct 14, 2014 | Completed final sign-off Nov 2014 | 1347 Minna St | revision to approved pa 201408254608; per inspector's request, show altered walls for bathrooms; maher n/aDetails
revision to approved pa 201408254608; per inspector's request, show altered walls for bathrooms; maher n/a | $500 |
| Aug 25, 2014 | Completed final sign-off Nov 2014 | 1347 Minna St | remodeling both bathrooms - replace existing shower tub in one bathroom, replace existing exhaust fan; 2nd bath - replace existing showertub, switche, toilet & sink location. replace existing door to packet door, install/replace exhaust fan. compliance with ord 155-13 naDetails
remodeling both bathrooms - replace existing shower tub in one bathroom, replace existing exhaust fan; 2nd bath - replace existing showertub, switche, toilet & sink location. replace existing door to packet door, install/replace exhaust fan. compliance with ord 155-13 na | $12,000 |
| Apr 15, 2014 | Completed final sign-off Dec 2014 | 164 Marietta Dr | add skylight at rear facing portion of (e) decorative sloped roof over living room, replace (e) bath skylight and lowering of (e) skylight curb to 8" tall. skylight to be double glazed with low-e glass.Details
add skylight at rear facing portion of (e) decorative sloped roof over living room, replace (e) bath skylight and lowering of (e) skylight curb to 8" tall. skylight to be double glazed with low-e glass. | $3,000 |
| Jun 25, 2012 | Completed final sign-off Nov 2012 | 1515 24th Av | add one family room, one study room. one full bath room and one storage on (e) ground floor per plan.Details
add one family room, one study room. one full bath room and one storage on (e) ground floor per plan. | $40,000 |
| Jun 20, 2012 | Completed final sign-off Feb 2013 | 28 Precita Av | change of use from commercial to residential. interior remodel of bathroom, addition of kitchen & media room.Details
change of use from commercial to residential. interior remodel of bathroom, addition of kitchen & media room. | $25,000 |
| Jan 27, 2012 | Completed final sign-off Nov 2012 | 386 Mangels Av | interior remodeling-new kitchen, new bedrooms & new storage. replace windows at ground floor. add habitable space to ground floor (1 bedroom, 1 bathroom & 1 storage) per plan.Details
interior remodeling-new kitchen, new bedrooms & new storage. replace windows at ground floor. add habitable space to ground floor (1 bedroom, 1 bathroom & 1 storage) per plan. | $20,000 |
| Feb 23, 2011 | Completed final sign-off Jun 2011 | 4330 Geary Bl | 2nd & 3rd flr bathroom,r epair existing 36' new angel shower pan, new shower floor, floor tile and repl shower valve and replace exhaust fan with fluorescent light in the bathroomDetails
2nd & 3rd flr bathroom,r epair existing 36' new angel shower pan, new shower floor, floor tile and repl shower valve and replace exhaust fan with fluorescent light in the bathroom | $5,000 |
| Nov 16, 2010 | Completed final sign-off Feb 2011 | 777 San Jose Av | to clarify scope of work on 201008239378. including gr fl 5/8 gyp bd at ceiling and wall, studs at north, south property lines, patch slab with 4" concrete with 3/8" 0 rebar at e 12" oc ea side. 2nd fl: add n ceiling joist to ea of fire damaged in kitchen area. remodel e kitchen and bath, replaceDetails
to clarify scope of work on 201008239378. including gr fl 5/8 gyp bd at ceiling and wall, studs at north, south property lines, patch slab with 4" concrete with 3/8" 0 rebar at e 12" oc ea side. 2nd fl: add n ceiling joist to ea of fire damaged in kitchen area. remodel e kitchen and bath, replace | $25,000 |
| Jun 1, 2010 | Completed final sign-off Sep 2010 | 607 33rd Av | relocated bathroom, furnace & water heater on ground flr. second flr.: relocated kitchen to create space for (n) bedroom #2. (v.i.f.) smoke detector on each bedroom & hallway. no wet bar single family use only.Details
relocated bathroom, furnace & water heater on ground flr. second flr.: relocated kitchen to create space for (n) bedroom #2. (v.i.f.) smoke detector on each bedroom & hallway. no wet bar single family use only. | $20,000 |
| Dec 24, 2009 | Completed final sign-off Dec 2011 | 171 Lee Av | add four bedrooms, one study room and four bathrooms on first floor.Details
add four bedrooms, one study room and four bathrooms on first floor. | $80,000 |
| Sep 14, 2009 | Completed final sign-off Nov 2009 | 1442 27th Av | remodel bathroom, replace shower panel, new sink & tile. replace water line to upper.Details
remodel bathroom, replace shower panel, new sink & tile. replace water line to upper. | $9,000 |
| Oct 16, 2007 | Completed final sign-off Jul 2008 | 47 Lisbon St | add one playroom, one bedroom, one full bathroom, storgae room & laundry room on existing ground floor per plan.Details
add one playroom, one bedroom, one full bathroom, storgae room & laundry room on existing ground floor per plan. | $26,000 |
| Jun 4, 2007 | Completed final sign-off Dec 2007 | 745 Cayuga Av | replace and remodeling bathroom, family room and dinner room and install insulation and new sheet rock those area. wall r-13, r-30 ceiling. bathroom:fluorescent lighting or motion sensor control (t-24). family room, dining room lighting extg.Details
replace and remodeling bathroom, family room and dinner room and install insulation and new sheet rock those area. wall r-13, r-30 ceiling. bathroom:fluorescent lighting or motion sensor control (t-24). family room, dining room lighting extg. | $15,000 |
| May 16, 2005 | Completed final sign-off Sep 2005 | 80 Brentwood Av | remodel bathroom,replace (e)tub,toilet,sink,shower pan,repair all dry rot within bathroomDetails
remodel bathroom,replace (e)tub,toilet,sink,shower pan,repair all dry rot within bathroom | $5,000 |
| May 30, 2001 | Completed final sign-off Oct 2001 | 1842 22nd Av | construct new master bedroom, study room, tool room, storage room & bathrooms on g/floorDetails
construct new master bedroom, study room, tool room, storage room & bathrooms on g/floor | $20,000 |