# Solarix Systems

Contractor license 920421. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/solarix-systems-920421
- JSON: https://www.permitgraph.org/api/contractor?license=920421
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=920421

18 permits since 2000: 15 completed, 2 never finaled, 1 expired or cancelled. Typically 30 days from filing to permit and 354 days from permit to final inspection. Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.

- Based in: San Francisco
- On San Francisco permits: May 2012 to Jun 2025
- Last 24 months: 2 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2012 | 1 | 0 | 0 | 0 |
| 2014 | 4 | 0 | 0 | 0 |
| 2015 | 0 | 0 | 1 | 0 |
| 2016 | 3 | 0 | 0 | 0 |
| 2017 | 2 | 0 | 0 | 0 |
| 2018 | 2 | 0 | 0 | 1 |
| 2019 | 1 | 0 | 0 | 0 |
| 2020 | 0 | 0 | 1 | 0 |
| 2025 | 2 | 0 | 0 | 0 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202506118508](https://www.permitgraph.org/p/202506118508) | Jun 11, 2025 | Completed: final sign-off Jun 2026 | [351 Friedell St](https://www.permitgraph.org/a/4591C/215) | changes to approved addenda 201910083919 - 11 s2 solar changes consisted of using 5 pv panel out of 96 of a different model/mfg, using a different pv inverter, upsizing wire and fuse size from invert… |  |
| [202506118510](https://www.permitgraph.org/p/202506118510) | Jun 11, 2025 | Completed: final sign-off Jun 2026 | [151 Friedell St](https://www.permitgraph.org/a/4591C/212) | changes to approved addenda 201910083919 - 11 s2 solar changes consisted of using 5 pv panel out of 96 of a different model/mfg, using a different pv inverter, upsizing wire and fuse size from invert… |  |
| [202002073884](https://www.permitgraph.org/p/202002073884) | Feb 7, 2020 | Never finaled: issued Oct 2020, no final | [1950 Mission St](https://www.permitgraph.org/a/3554/005) | installation of a solar hot water heating system. | $220,000 |
| [201901160541](https://www.permitgraph.org/p/201901160541) | Jan 16, 2019 | Completed: final sign-off Jun 2020 | [1150 03rd St](https://www.permitgraph.org/a/8711/026) | install a solar hot water heating system. roof mounted collectors and a ground located horizontal storage tanks | $200,000 |
| [201812067633](https://www.permitgraph.org/p/201812067633) | Dec 6, 2018 | Completed: final sign-off Feb 2020 | [1491 Sunnydale Av](https://www.permitgraph.org/a/6356/061) | installation of a solar hot water heating system | $62,000 |
| [201809109564](https://www.permitgraph.org/p/201809109564) | Sep 10, 2018 | Expired or cancelled: withdrawn Sep 2018 | [2800 Arelious Walker Dr](https://www.permitgraph.org/a/4884/026) | installation of a solar hot water heating system. ground mounted storage tank and roof-mounted collector maher na | $54,000 |
| [201807174752](https://www.permitgraph.org/p/201807174752) | Jul 17, 2018 | Completed: final sign-off Sep 2018 | [626 Mission Bay Blvd North Bl](https://www.permitgraph.org/a/8711/021) | installation of a solar hot water heating system. system consists of roof-mounted collectors and two roof-mounted water storage tanks. 2330 sq ft collector area. | $224,000 |
| [201712126293](https://www.permitgraph.org/p/201712126293) | Dec 12, 2017 | Completed: final sign-off Oct 2018 | [1036 Mission St](https://www.permitgraph.org/a/3703/162) | install a solar hot water heating system consisting of roof mounted solar collectors and a solar storage tank located in the ground floor mechanical room maher na | $215,000 |
| [201701257875](https://www.permitgraph.org/p/201701257875) | Jan 25, 2017 | Completed: final sign-off Aug 2017 | [2198 Market St](https://www.permitgraph.org/a/3542/061) | revision to 201612064257: change orientation of steel beam sleepers for anchorage of a water storage tank. maher na |  |
| [201612064257](https://www.permitgraph.org/p/201612064257) | Dec 6, 2016 | Completed: final sign-off Aug 2017 | [2198 Market St](https://www.permitgraph.org/a/3542/061) | intall a solar hot water heating system. system consists of roof-mounted collectors and a water storage tank. ref to permit app#2013-12-13-4180 s2 | $28,000 |
| [201611183132](https://www.permitgraph.org/p/201611183132) | Nov 18, 2016 | Completed: final sign-off Feb 2017 | [588 Mission Bay Blvd North Bl](https://www.permitgraph.org/a/8711/226) | install a solar hot water heating system. system consists of a solar thermal collectors, a roof mounted storage tank and heat exchanger, and all associated piping and insulation. | $310,000 |
| [201608296272](https://www.permitgraph.org/p/201608296272) | Aug 29, 2016 | Completed: final sign-off May 2019 | [2800 Arelious Walker Dr](https://www.permitgraph.org/a/4884/026) | to erect 3 stories, no basement, type vb, 31 units apartments with parking. ** maher: n/a ** | $14,000,000 |
| [201506048063](https://www.permitgraph.org/p/201506048063) | Jun 4, 2015 | Never finaled: issued Oct 2015, no final | [121 Golden Gate Av](https://www.permitgraph.org/a/0349/021) | install a solar hot water heating system. roof-mounted collectors and storage tank (roof mech room).; maher n/a | $60,000 |
| [201403261734](https://www.permitgraph.org/p/201403261734) | Mar 26, 2014 | Completed: final sign-off Feb 2015 | [255 Broadway](https://www.permitgraph.org/a/0165/021) | install a solar hot water heating system for a 75 unit apt bldg to consist of roof mounted solar collectors, water shortage tank located in the mechanical room (basement) of the bldg, closed loop, gl… | $127,000 |
| [201403201247](https://www.permitgraph.org/p/201403201247) | Mar 20, 2014 | Completed: final sign-off Mar 2015 | [869 Jamestown Av](https://www.permitgraph.org/a/4991/277) | ref. to pa#200103235135, install a solar/hot water heating system, system consists of 6 roof mounted collectors, a ground-mounted water storage tank and a heat exchanger. | $50,000 |
| [201403201242](https://www.permitgraph.org/p/201403201242) | Mar 20, 2014 | Completed: final sign-off Mar 2015 | [837 Jamestown Av](https://www.permitgraph.org/a/4991/277) | ref. to pa#200103235131, install a solar/hot water heating system, each system consists of 6 roof mounted solar collectors, a ground-mounted water storage tank and a double wall heat exchanger. | $50,000 |
| [201402078103](https://www.permitgraph.org/p/201402078103) | Feb 7, 2014 | Completed: final sign-off Apr 2015 | [1180 04th St](https://www.permitgraph.org/a/8711/014) | install a solar hot water heating system for a multi-unit bldg. install consists of roof mounted collectors, water storage tanks, heat exchanger and circulation pumps. system is a closed -loop, glyco… | $231,000 |
| [201205210884](https://www.permitgraph.org/p/201205210884) | May 21, 2012 | Completed: final sign-off Feb 2013 | [220 Golden Gate Av](https://www.permitgraph.org/a/0345/031) | install a solar hot water heating system. roof-mounted collectors and 2,800 gallon storage tanks serve as the heart of the system. conf is close loop gylcly with a double wall heat exchangers. | $122,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/contractor/solarix-systems-920421.
