# Skyline Construction

Contractor license 727637. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/skyline-construction-727637
- JSON: https://www.permitgraph.org/api/contractor?license=727637
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=727637

3,607 permits since 2000: 2,615 completed, 127 in progress, 494 never finaled, 371 expired or cancelled. Typically 12 days from filing to permit and 154 days from permit to final inspection. Of the 494 never-finaled permits, 41 are 3 to 5 years old, 233 are 5 to 10 years old, 220 are over 10 years old. 8 were filed but never issued.

- Based in: San Francisco
- On San Francisco permits: Jan 2000 to Nov 2026
- Last 24 months: 261 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2000 | 69 | 0 | 1 | 64 |
| 2001 | 76 | 0 | 0 | 46 |
| 2002 | 100 | 0 | 2 | 49 |
| 2003 | 74 | 0 | 2 | 37 |
| 2004 | 73 | 0 | 4 | 16 |
| 2005 | 147 | 0 | 6 | 21 |
| 2006 | 148 | 0 | 5 | 36 |
| 2007 | 127 | 0 | 10 | 24 |
| 2008 | 107 | 0 | 8 | 6 |
| 2009 | 81 | 0 | 4 | 1 |
| 2010 | 72 | 0 | 5 | 1 |
| 2011 | 99 | 0 | 15 | 3 |
| 2012 | 103 | 0 | 9 | 2 |
| 2013 | 86 | 0 | 26 | 3 |
| 2014 | 123 | 0 | 33 | 6 |
| 2015 | 99 | 0 | 50 | 5 |
| 2016 | 143 | 0 | 49 | 7 |
| 2017 | 118 | 0 | 59 | 2 |
| 2018 | 102 | 0 | 54 | 7 |
| 2019 | 124 | 0 | 61 | 10 |
| 2020 | 78 | 0 | 13 | 7 |
| 2021 | 95 | 0 | 46 | 10 |
| 2022 | 74 | 1 | 17 | 7 |
| 2023 | 83 | 6 | 15 | 0 |
| 2024 | 73 | 12 | 0 | 0 |
| 2025 | 95 | 36 | 0 | 1 |
| 2026 | 46 | 72 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Bathroom remodel | 14 | 12 | 2 | 0 | 0 | 28 | 226 |
| Stairs | 102 | 64 | 10 | 26 | 2 | 39 | 286 |
| Kitchen remodel | 27 | 22 | 2 | 3 | 0 | 51 | 176 |
| Deck | 5 | 2 | 2 | 1 | 0 | 15 | 336 |
| Roof deck | 9 | 6 | 0 | 3 | 0 | 9 | 191 |
| Pergola or trellis | 1 | 1 | 0 | 0 | 0 | 103 | 287 |

## Most recent permits

The 100 most recent of 3,607.

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202611180926](https://www.permitgraph.org/p/202611180926) | Nov 18, 2026 | In progress: filed Nov 2026, not yet issued | [555 California St](https://www.permitgraph.org/a/0259/026) | evacuation maps for 31st flr. ref#: 202603238106 | $1,500 |
| [202611120663](https://www.permitgraph.org/p/202611120663) | Nov 12, 2026 | In progress: filed Nov 2026, not yet issued | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | deferred structural permit to pa# 202608206930 for equipment anchorage. |  |
| [202611030271](https://www.permitgraph.org/p/202611030271) | Nov 3, 2026 | In progress: filed Nov 2026, not yet issued | [300 Mission St](https://www.permitgraph.org/a/3710/018) | 16th and 17th floors: health department permit only to review existing break rooms. ref pa #202512302939 |  |
| [202610300139](https://www.permitgraph.org/p/202610300139) | Oct 30, 2026 | In progress: filed Oct 2026, not yet issued | [343 Sansome St](https://www.permitgraph.org/a/0239/030) | ste 505 - finishes, counters, etc. new construction to consist of finishes. non-structural partitions, interior doors, electrical, counters, and paint. mech, elec, fire life safety and sprinkler plan… | $120,000 |
| [202610229764](https://www.permitgraph.org/p/202610229764) | Oct 22, 2026 | In progress: issued Nov 2026 | [1 Sansome St](https://www.permitgraph.org/a/0289/004) | 23/f: ti including office layout,restrooms and break room, structural strengthening at assembly areas. mep included | $4,100,000 |
| [202610229763](https://www.permitgraph.org/p/202610229763) | Oct 22, 2026 | In progress: issued Nov 2026 | [1 Sansome St](https://www.permitgraph.org/a/0289/004) | 21/f: ti including office layout,restrooms and break room, structural strengthening at assembly areas. mep included | $4,100,000 |
| [202610209668](https://www.permitgraph.org/p/202610209668) | Oct 20, 2026 | In progress: issued Nov 2026 | [580 California St](https://www.permitgraph.org/a/0240/007) | mechanical work for tenant improvement at suite 1300. ref. arch 202608196811 | $25,000 |
| [202610209667](https://www.permitgraph.org/p/202610209667) | Oct 20, 2026 | In progress: issued Nov 2026 | [1 Sansome St](https://www.permitgraph.org/a/0289/004) | 40th fl: revision to 202512182127 to remove previously identified structural strengthening. |  |
| [202610209664](https://www.permitgraph.org/p/202610209664) | Oct 20, 2026 | In progress: issued Oct 2026 | [580 California St](https://www.permitgraph.org/a/0240/007) | suite 1500: mechanical work for t.i. ref #202608267180. | $25,000 |
| [202610169557](https://www.permitgraph.org/p/202610169557) | Oct 16, 2026 | Completed: final sign-off Oct 2026 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | to obtain final inspection for work approved under pa# 202505146466. all work is complete. |  |
| [202610149408](https://www.permitgraph.org/p/202610149408) | Oct 14, 2026 | In progress: issued Oct 2026 | [1 Sansome St](https://www.permitgraph.org/a/0289/004) | 38/f: revision to pa#202602045247. add dedicated heat pump system to private office. installation of new hvac equipment. |  |
| [202610089181](https://www.permitgraph.org/p/202610089181) | Oct 8, 2026 | In progress: issued Oct 2026 | [55 Spear St](https://www.permitgraph.org/a/3713/007) | levels 8,9, and 10 revision to 202608317423, 202608317425 202608317426 for revised phone booth location, additon/relocation of existing power and furniture layout |  |
| [202610079132](https://www.permitgraph.org/p/202610079132) | Oct 7, 2026 | In progress: issued Oct 2026 | [55 Spear St](https://www.permitgraph.org/a/3713/007) | 28th ti non structural partitions, ceilings, lighting and associated mep | $1,800,000 |
| [202610059039](https://www.permitgraph.org/p/202610059039) | Oct 5, 2026 | In progress: filed Oct 2026, not yet issued | [4 Embarcadero Center](https://www.permitgraph.org/a/0233/044) | 19th fl - ti of (e) office (485 sq ft). demolition of 2 enclosed offices and construction of four small enclosed offices. includes partitions, lighting and finishes | $73,320 |
| [202610018876](https://www.permitgraph.org/p/202610018876) | Oct 1, 2026 | In progress: issued Oct 2026 | [580 California St](https://www.permitgraph.org/a/0240/007) | electrical and plumbing work for tenant improvement at suite 1500. ref 202608261500 | $165,000 |
| [202609308822](https://www.permitgraph.org/p/202609308822) | Sep 30, 2026 | In progress: issued Oct 2026 | [580 California St](https://www.permitgraph.org/a/0240/007) | suite 1300. electrical and plumbing work for tenant improvement at ste 1300 ref bpa: 202608196811 | $120,000 |
| [202609298761](https://www.permitgraph.org/p/202609298761) | Sep 29, 2026 | In progress: issued Oct 2026 | [600 Montgomery St](https://www.permitgraph.org/a/0207/032) | 33rd floor: demolition of non-structural interior partition, ceilings and finishes of existing office. existing life safety including sprinkler piping and heads to remain intact & operational through… | $47,583 |
| [202609288711](https://www.permitgraph.org/p/202609288711) | Sep 28, 2026 | In progress: issued Oct 2026 | [220 Montgomery St](https://www.permitgraph.org/a/0268/008) | mechanical and electrical work for t.i. on the 9th floor; ref#: 202609037667. | $65,000 |
| [202609037667](https://www.permitgraph.org/p/202609037667) | Sep 3, 2026 | In progress: issued Sep 2026 | [220 Montgomery St](https://www.permitgraph.org/a/0268/008) | 9/f #975: commercial interior ti for (e) office tenant space. work includes new non-structural partitions, doors, glazing, interior finishes, ceiling & lighting fixtures, casework, power/data coordin… | $1,200,000 |
| [202609017517](https://www.permitgraph.org/p/202609017517) | Sep 1, 2026 | In progress: issued Sep 2026 | [425 Market St](https://www.permitgraph.org/a/3709/014) | 14th floor: new t.i. includes construction of non-structural partitions, ceillings, doors, glazing, light fixtures, casework, and pover/signal. | $6,100,000 |
| [202608317423](https://www.permitgraph.org/p/202608317423) | Aug 31, 2026 | In progress: issued Sep 2026 | [55 Spear St](https://www.permitgraph.org/a/3713/007) | 8/fl- ti to include paint, finishes, and (n) phone booths | $200,000 |
| [202608317473](https://www.permitgraph.org/p/202608317473) | Aug 31, 2026 | In progress: issued Oct 2026 | [55 Spear St](https://www.permitgraph.org/a/3713/007) | 29th floor: non-structural partitions, ceiling, lighting & mep &mep. (e) convenience stair to be re-finish. | $3,646,268 |
| [202608317458](https://www.permitgraph.org/p/202608317458) | Aug 31, 2026 | In progress: issued Sep 2026 | [301 Toland St](https://www.permitgraph.org/a/5264/049) | repair of existing stuctural roof trusses. | $175,000 |
| [202608317426](https://www.permitgraph.org/p/202608317426) | Aug 31, 2026 | In progress: issued Sep 2026 | [55 Spear St](https://www.permitgraph.org/a/3713/007) | 10/fl- ti to include paint, finishes, and (n) phone booths | $150,000 |
| [202608317425](https://www.permitgraph.org/p/202608317425) | Aug 31, 2026 | In progress: issued Sep 2026 | [55 Spear St](https://www.permitgraph.org/a/3713/007) | 9/fl- ti to include paint, finishes, and (n) phone booths | $200,000 |
| [202608277310](https://www.permitgraph.org/p/202608277310) | Aug 27, 2026 | In progress: issued Oct 2026 | [300 Clay St](https://www.permitgraph.org/a/0204/021) | level 9: interior ti includes limited soft demo, buildi out includng new millwork and mep | $125,000 |
| [202608277282](https://www.permitgraph.org/p/202608277282) | Aug 27, 2026 | In progress: issued Sep 2026 | [1 Sansome St](https://www.permitgraph.org/a/0289/004) | 29th flr: revision to bpa#: 202512101397. adminstrative permit to obtain sffd assembly. |  |
| [202608267180](https://www.permitgraph.org/p/202608267180) | Aug 26, 2026 | In progress: issued Sep 2026 | [580 California St](https://www.permitgraph.org/a/0240/007) | 15/f suite 1500: interior demolition & construction of non-structural elements including but not necessarily limited to: interior partitions, doors, finishes, ceilings & lighting. restroom finish & a… | $3,034,458 |
| [202608247035](https://www.permitgraph.org/p/202608247035) | Aug 24, 2026 | In progress: issued Aug 2026 | [555 California St](https://www.permitgraph.org/a/0259/026) | deferred structural calculations & details for new handrail at stair previously approved pa#202603238106. |  |
| [202608206930](https://www.permitgraph.org/p/202608206930) | Aug 20, 2026 | In progress: issued Sep 2026 | [645 Harrison St](https://www.permitgraph.org/a/3763/105) | limited t.i. on level 3, removal of 8 non-structural screening partitions, patch & re-finish, replace (2) doors. equipment relocation. | $107,970 |
| [202608196811](https://www.permitgraph.org/p/202608196811) | Aug 19, 2026 | In progress: issued Aug 2026 | [580 California St](https://www.permitgraph.org/a/0240/007) | 13/fl-ti and demo of non structrual elements including but not limited to interior partitions doors, finishes, ceilings, lighting mep and life safety under seperate permits. no new plumbing fixtures | $966,322 |
| [202608176706](https://www.permitgraph.org/p/202608176706) | Aug 17, 2026 | In progress: issued Oct 2026 | [731 Market St](https://www.permitgraph.org/a/3706/062) | ste 200, tenant improvement to include selective demolition on non-structural partitions, ceilings, lighting and finishes. construction of non-structural partitions, ceiling, lighting, millwork finis… | $1,225,000 |
| [202608126439](https://www.permitgraph.org/p/202608126439) | Aug 12, 2026 | Completed: final sign-off Sep 2026 | [1 Sansome St](https://www.permitgraph.org/a/0289/004) | floors 24-28: men's restroom revision.202512172034, 202512172035, 20251020787709, 202512172064. includes removal of 5 urinals to provide required manuevering clearance at ada stall door. |  |
| [202608126422](https://www.permitgraph.org/p/202608126422) | Aug 12, 2026 | In progress: issued Aug 2026 | [45 Fremont St](https://www.permitgraph.org/a/3710/019) | 17/f: installation of life safety and seismic requirements for (2) one-person phone booths. accessibility upgrades in the core restrooms are also included. mep and fire life safety drawings are defer… | $127,000 |
| [202608116411](https://www.permitgraph.org/p/202608116411) | Aug 11, 2026 | In progress: issued Sep 2026 | [525 Market St](https://www.permitgraph.org/a/3708/056) | 3/fl- revision 202606253897 to include work partitions and structrual work. 21/fl- revision 202606253896 to include work on structural, finishes and fixtures. 22/fl- revision 202606253894 to include… | $10,000 |
| [202608056106](https://www.permitgraph.org/p/202608056106) | Aug 5, 2026 | In progress: issued Nov 2026 | [220 Montgomery St](https://www.permitgraph.org/a/0268/008) | 6th floor: administrative permit to remove defferred mechanical requirement from architectural permit #202512151758. no mechanical scope involved |  |
| [202607275603](https://www.permitgraph.org/p/202607275603) | Jul 27, 2026 | Completed: final sign-off Oct 2026 | [222 02nd St](https://www.permitgraph.org/a/3735/063) | mechanical work for t.i. on the 22nd flr. ref#: 202606163276 | $18,000 |
| [202607275593](https://www.permitgraph.org/p/202607275593) | Jul 27, 2026 | In progress: issued Aug 2026 | [101 California St](https://www.permitgraph.org/a/0263/011) | 46th floor: installation of 3 new pre-manufactured phone booths including seismic anchoring. | $45,000 |
| [202607225411](https://www.permitgraph.org/p/202607225411) | Jul 22, 2026 | In progress: issued Aug 2026 | [55 Spear St](https://www.permitgraph.org/a/3713/007) | l30-l31 demo (e) slab for (n) opening for interconnecting stair between l30 & l31 (n) finishes, structural, platform landing | $715,000 |
| [202607155067](https://www.permitgraph.org/p/202607155067) | Jul 15, 2026 | In progress: issued Aug 2026 | [595 Market St](https://www.permitgraph.org/a/3708/043) | ti suite 1100: demo and replacement of ceiling system. lighting, casework and finishes, demo of some partitons, new full height partitions, modification mep upgrades | $1,000,000 |
| [202607155091](https://www.permitgraph.org/p/202607155091) | Jul 15, 2026 | Completed: final sign-off Sep 2026 | [1 Sansome St](https://www.permitgraph.org/a/0289/004) | 29 & 30 flr: deferred structural submittal includes str support for (1) fire shutter door installed on 28/f, support on 29 flr includes str support for decorative chandelier suspended above communict… |  |
| [202607104878](https://www.permitgraph.org/p/202607104878) | Jul 10, 2026 | Completed: final sign-off Sep 2026 | [450 Pacific Av](https://www.permitgraph.org/a/0164/010) | occupant load review for intermitent use of lobby as assembly in support of sffd operational permit. |  |
| [202606264003](https://www.permitgraph.org/p/202606264003) | Jun 26, 2026 | In progress: issued Jul 2026 | [345 California St](https://www.permitgraph.org/a/0261/017) | 10th fl, ste 1000; mechanical, electrical and plumbing work for ti. ref pa 202606102955 | $300,000 |
| [202606263979](https://www.permitgraph.org/p/202606263979) | Jun 26, 2026 | In progress: issued Jul 2026 | [343 Sansome St](https://www.permitgraph.org/a/0239/030) | mechanical work for tenant improvement on the 5th fl ref 202604230007 | $5,000 |
| [202606253897](https://www.permitgraph.org/p/202606253897) | Jun 25, 2026 | In progress: issued Jul 2026 | [525 Market St](https://www.permitgraph.org/a/3708/056) | 3rd fl partial ti. non structural partitons, ceilings, fixtures and finishes, w mep. | $3,100,000 |
| [202606253887](https://www.permitgraph.org/p/202606253887) | Jun 25, 2026 | Completed: final sign-off Oct 2026 | [680 Folsom St](https://www.permitgraph.org/a/3735/013) | 8th * 9th fl - install of modular phone booths in an existing office fls 8 & 9 existing occupancy are not affected by this work. no demo mep or security work included. structural work included | $120,000 |
| [202606253899](https://www.permitgraph.org/p/202606253899) | Jun 25, 2026 | In progress: issued Jul 2026 | [55 Spear St](https://www.permitgraph.org/a/3713/007) | 29th floor: interior non-structural demolition on the 29th floor. ab017 | $45,000 |
| [202606253896](https://www.permitgraph.org/p/202606253896) | Jun 25, 2026 | In progress: issued Jul 2026 | [525 Market St](https://www.permitgraph.org/a/3708/056) | 21nd fl partial ti. non structural partitons, ceilings, fixtures and finishes, w mep. | $999,999 |
| [202606183505](https://www.permitgraph.org/p/202606183505) | Jun 18, 2026 | Completed: final sign-off Oct 2026 | [101 California St](https://www.permitgraph.org/a/0263/011) | 33rd fl - ti to partial suite to include selective demo, new partitions, ceiling, lighting, finishes, electrical, mechanical and plumbing | $1,583,313 |
| [202606163276](https://www.permitgraph.org/p/202606163276) | Jun 16, 2026 | Completed: final sign-off Oct 2026 | [222 02nd St](https://www.permitgraph.org/a/3735/063) | 22nd fl: removal of elevator lobby doors on floor 22. replace with new doors with card reader. ada restroom upgrade. no new or change plumbing fixtures. | $20,500 |
| [202606163275](https://www.permitgraph.org/p/202606163275) | Jun 16, 2026 | Completed: final sign-off Oct 2026 | [222 02nd St](https://www.permitgraph.org/a/3735/063) | 21st fl: removal of elevator lobby doors on floor 21. replace with new doors with card reader. ada restroom upgrade. no new or change plumbing fixtures. | $32,600 |
| [202606102955](https://www.permitgraph.org/p/202606102955) | Jun 10, 2026 | In progress: issued Jul 2026 | [345 California St](https://www.permitgraph.org/a/0261/017) | 10/fl- interior ti construction of non structrual partitions doors, light fixtuers, millwork and finishes. includes structural anchorage of phone booths, moveable pin and island countertop. mep and f… | $2,000,000 |
| [202606042503](https://www.permitgraph.org/p/202606042503) | Jun 4, 2026 | Completed: final sign-off Nov 2026 | [650 California St](https://www.permitgraph.org/a/0241/025) | mechanical and electrical work for tenant improvement on 12th floor. ref. 202605111057 | $175,000 |
| [202606042599](https://www.permitgraph.org/p/202606042599) | Jun 4, 2026 | Completed: final sign-off Oct 2026 | [1 Sansome St](https://www.permitgraph.org/a/0289/004) | l28: deferred mep for pa #202512172064 | $1,215,216 |
| [202606042605](https://www.permitgraph.org/p/202606042605) | Jun 4, 2026 | Completed: final sign-off Oct 2026 | [114 Sansome St](https://www.permitgraph.org/a/0267/010) | revision to bpa: 202603137536 - update occupancy load calculations. (7th fl) |  |
| [202606012221](https://www.permitgraph.org/p/202606012221) | Jun 1, 2026 | In progress: issued Jul 2026 | [101 California St](https://www.permitgraph.org/a/0263/011) | floors 17 and 18 - replace elevator lobby doors, frames, and hardware to address tenant security concerns. | $38,000 |
| [202605292120](https://www.permitgraph.org/p/202605292120) | May 29, 2026 | Completed: final sign-off Oct 2026 | [1 Sansome St](https://www.permitgraph.org/a/0289/004) | 40th floor: revision to bpa#202512172045, includes updates to finishes, kitchen equipment, and enviroemental health notes. includes ceiling and soffit, casework modification and circulation floor tra… |  |
| [202605282030](https://www.permitgraph.org/p/202605282030) | May 28, 2026 | In progress: issued Jun 2026 | [525 Market St](https://www.permitgraph.org/a/3708/056) | commercial tenant improvement on 20th fl to secure 1 office space. includes demo and construction of non structural partitons and furniture. minor update to ceilings and finishes | $350,000 |
| [202605282068](https://www.permitgraph.org/p/202605282068) | May 28, 2026 | In progress: issued Jul 2026 | [343 Sansome St](https://www.permitgraph.org/a/0239/030) | 5th floor: electrical work for tenant improvement. ref arch. 202604230007 | $20,000 |
| [202605272006](https://www.permitgraph.org/p/202605272006) | May 27, 2026 | In progress: issued Aug 2026 | [345 California St](https://www.permitgraph.org/a/0261/017) | 6/f & 7/f: installation office phone booth anchorage & structural details included. | $66,000 |
| [202605261826](https://www.permitgraph.org/p/202605261826) | May 26, 2026 | Completed: final sign-off Nov 2026 | [444 De Haro St](https://www.permitgraph.org/a/3979/001) | 1st installation of (3) pre manufactured accessible meeting pods. the pods shall be seismically anchored. electrical, fire alarm and fire sprinklers shall be designed and installed by contractors und… | $134,000 |
| [202605221786](https://www.permitgraph.org/p/202605221786) | May 22, 2026 | Completed: final sign-off Jul 2026 | [160 Spear St](https://www.permitgraph.org/a/3717/010) | 17th and 18th floor. installation of 21 new phone booth (7) on 17th flr and (14) on floor 18. | $300,000 |
| [202605211713](https://www.permitgraph.org/p/202605211713) | May 21, 2026 | Completed: final sign-off Sep 2026 | [650 California St](https://www.permitgraph.org/a/0241/025) | revision to pa#202512111537 ti revision of nono-stuct ceiling & lighting design. new const. to include non-structural ceiling & lighting, finishes and new ventless fireplace. all work interior only o… |  |
| [202605191517](https://www.permitgraph.org/p/202605191517) | May 19, 2026 | In progress: issued May 2026 | [345 California St](https://www.permitgraph.org/a/0261/020) | 5th fl: mechanical revision to pa#202603046904, 202509024401 and 202509024365 to add fsd-14 upgrade bulletin 2.05, fsd matrix, add sequence of operations. add updated smoke control narrative/preapp m… |  |
| [202605181447](https://www.permitgraph.org/p/202605181447) | May 18, 2026 | Completed: final sign-off Oct 2026 | [1 Sansome St](https://www.permitgraph.org/a/0289/004) | level 29: revision to pa#: 202512101397. includes updates to interior finishes and environmental health notes to align with dph requirments. removal at previously indicated two-way comm devices at th… |  |
| [202605181460](https://www.permitgraph.org/p/202605181460) | May 18, 2026 | Completed: final sign-off Oct 2026 | [1 Sansome St](https://www.permitgraph.org/a/0289/004) | 38/f: revision to pa# 202512101393 includes updates to finishes, equipment and enviormental health notes. includes additional lockers, ceiling and soffit modifications. |  |
| [202605111016](https://www.permitgraph.org/p/202605111016) | May 11, 2026 | Completed: final sign-off Sep 2026 | [1 Sansome St](https://www.permitgraph.org/a/0289/004) | floors 24,25,27,29,30,31,33,35, and 38: structural anchorage installation of pre-manufactured, single-user phone booths. | $400,000 |
| [202605111057](https://www.permitgraph.org/p/202605111057) | May 11, 2026 | Completed: final sign-off Nov 2026 | [650 California St](https://www.permitgraph.org/a/0241/025) | 12 flr: office t.i. including interior partitions, doors, finishes, ceiling, lights, millwork. seismic requirement for (9) new phone booths. mep deferred. | $1,630,160 |
| [202605040611](https://www.permitgraph.org/p/202605040611) | May 4, 2026 | Completed: final sign-off Sep 2026 | [1 Sansome St](https://www.permitgraph.org/a/0289/004) | 26th flr. revision permit#: 202512172035; food service scope include finishes, equipment, and environmental health notes. revision includes ceiling and soffit modifications, and circulation floor tra… |  |
| [202604300400](https://www.permitgraph.org/p/202604300400) | Apr 30, 2026 | In progress: issued Jul 2026 | [301 Howard St](https://www.permitgraph.org/a/3738/011) | 3rd floor: office full floor ti construction includes interior partitions, door, walls, finished, ceiling,mep upgrades. structural work for phone booths, trans firework, water heater. | $1,200,000 |
| [202604290326](https://www.permitgraph.org/p/202604290326) | Apr 29, 2026 | Completed: final sign-off Nov 2026 | [221 Main St](https://www.permitgraph.org/a/3740/034) | ste 770: 2 new phone booths in existing office. new outlets for phone booths | $10,000 |
| [202603187790](https://www.permitgraph.org/p/202603187790) | Apr 29, 2026 | In progress: issued Nov 2026 | [50 California St](https://www.permitgraph.org/a/0235/022) | construction of new roof terrace over (e) roof above 2/f. | $1,000,000 |
| [202604068926](https://www.permitgraph.org/p/202604068926) | Apr 29, 2026 | In progress: issued Sep 2026 | [50 California St](https://www.permitgraph.org/a/0235/022) | 2/fl- ti to include non structrual demo and construction of (n) conference center,gym, and lounge. | $3,790,509 |
| [202604290300](https://www.permitgraph.org/p/202604290300) | Apr 29, 2026 | In progress: issued Jul 2026 | [301 Howard St](https://www.permitgraph.org/a/3738/011) | 4th fl office t.i. entire floor. includes non bearing partitions, office glass, door, walls, finishes, mep upgrades. demo separate permit | $1,200,000 |
| [202604280268](https://www.permitgraph.org/p/202604280268) | Apr 28, 2026 | In progress: issued Aug 2026 | [301 Toland St](https://www.permitgraph.org/a/5264/049) | work to include structural demo; new accessible pedestrian stair & ramp @ fixture reception; new vehicular ingress/exit including high speed overhead door located at (1) hundson & (1) along toland; n… | $300,000 |
| [202604239991](https://www.permitgraph.org/p/202604239991) | Apr 23, 2026 | In progress: issued Jul 2026 | [55 Spear St](https://www.permitgraph.org/a/3713/007) | level 31 ti new non structural partitions, mep, finishes. demo under 202604018733. no exterior or structural work. | $8,250,000 |
| [202604230007](https://www.permitgraph.org/p/202604230007) | Apr 23, 2026 | In progress: issued May 2026 | [343 Sansome St](https://www.permitgraph.org/a/0239/030) | expansion of tenant suite 500 to combine with existing tenant suite 520. demolition of existimg mpm structural partitions, ceilings, doors, glazing millwork, lighting fixtures and finishes. construct… | $150,000 |
| [202604239978](https://www.permitgraph.org/p/202604239978) | Apr 23, 2026 | In progress: issued Jun 2026 | [55 Spear St](https://www.permitgraph.org/a/3713/007) | 30th fl - ti (n) non-structural partitions, mep, finishes. demo under pa 202604018733. no exterior or structural work | $9,052,500 |
| [202604229842](https://www.permitgraph.org/p/202604229842) | Apr 22, 2026 | In progress: issued May 2026 | [345 California St](https://www.permitgraph.org/a/0261/018) | administrative permit to document aasembly loads reference bpa: 202509024365 |  |
| [202604229864](https://www.permitgraph.org/p/202604229864) | Apr 22, 2026 | In progress: issued May 2026 | [600 Montgomery St](https://www.permitgraph.org/a/0207/032) | revision to 202510167484: update partition w/o door at exit hallway (2) 1508. revise man's restroom layout to add a furring wall, relocate the door location to the restroom & increase the ada stall t… |  |
| [202604169558](https://www.permitgraph.org/p/202604169558) | Apr 16, 2026 | Completed: final sign-off May 2026 | [1 Bush St](https://www.permitgraph.org/a/0290/011) | to obtain final inspection for work approved under pa#: 202501218675. all work is complete |  |
| [202604159451](https://www.permitgraph.org/p/202604159451) | Apr 15, 2026 | Completed: final sign-off Sep 2026 | [1 Sansome St](https://www.permitgraph.org/a/0289/004) | revision pa#: 202512172034. 24th-25th floor. food service scope including finishes, equipment and environmental heath notes. revision includes additional lockers, ceiling and soffiet modifications. |  |
| [202604159455](https://www.permitgraph.org/p/202604159455) | Apr 15, 2026 | Completed: final sign-off Sep 2026 | [1 Sansome St](https://www.permitgraph.org/a/0289/004) | 33rd & 35th revision to pa 202511129396 food service scope including finishes, equipment and environmental health notes. revision includes additional locakers, drinking fountaint, ceiling and soffit… |  |
| [202604139312](https://www.permitgraph.org/p/202604139312) | Apr 13, 2026 | In progress: issued Apr 2026 | [555 California St](https://www.permitgraph.org/a/0259/026) | 30/31/fl- deferred ref 202603238106 top include addition of a (n) convenience stair connecting level 30 and 31 in an (n) office space | $1,250,000 |
| [202604109215](https://www.permitgraph.org/p/202604109215) | Apr 10, 2026 | In progress: issued Jun 2026 | [1 Embarcadero Center](https://www.permitgraph.org/a/0230/028) | 31/f: interior tenant improvement. related mechanical, electrical and plumbing modifications. limited area of floor slab demolition is included in this scope for a non-egress stair under seperate per… | $2,750,000 |
| [202604079049](https://www.permitgraph.org/p/202604079049) | Apr 7, 2026 | Completed: final sign-off Oct 2026 | [1 Sansome St](https://www.permitgraph.org/a/0289/004) | 28th floor - revision to pa 202512172064 provide info for dph approved @ employee cafe. update to interior finishes, food service equipment, including chnges to pot and (e) strategy. addition to hori… |  |
| [202604068929](https://www.permitgraph.org/p/202604068929) | Apr 6, 2026 | Completed: final sign-off Nov 2026 | [650 California St](https://www.permitgraph.org/a/0241/025) | 22nd floor. mechanical and electrical for tenant improvement on the 22nd flr. ref#: 202512111537 | $290,000 |
| [202604028764](https://www.permitgraph.org/p/202604028764) | Apr 2, 2026 | In progress: issued Jun 2026 | [345 California St](https://www.permitgraph.org/a/0261/018) | deferred mep for 27th floor office ti under permit 202512182090. | $295,000 |
| [202604018733](https://www.permitgraph.org/p/202604018733) | Apr 1, 2026 | In progress: issued Apr 2026 | [55 Spear St](https://www.permitgraph.org/a/3713/007) | floors 30 & 31: demo only, non-structural partitions, ceiling,finished, mep, ab-17 | $382,005 |
| [202604018662](https://www.permitgraph.org/p/202604018662) | Apr 1, 2026 | In progress: issued May 2026 | [345 California St](https://www.permitgraph.org/a/0261/020) | 4th fl - ti @ existing fitness center to include demo & construction to create fitness studio. new washer/dryer @ storage 0413. mep under separate permit | $175,000 |
| [202603318614](https://www.permitgraph.org/p/202603318614) | Mar 31, 2026 | Completed: final sign-off Oct 2026 | [1 Sansome St](https://www.permitgraph.org/a/0289/004) | level 40: defered mep for bpa#202512172045 | $633,816 |
| [202603318616](https://www.permitgraph.org/p/202603318616) | Mar 31, 2026 | Completed: final sign-off Oct 2026 | [1 Sansome St](https://www.permitgraph.org/a/0289/004) | 29th/f: deferred mep for t.i. 202512101397 | $1,157,328 |
| [202603238106](https://www.permitgraph.org/p/202603238106) | Mar 23, 2026 | In progress: issued Apr 2026 | [555 California St](https://www.permitgraph.org/a/0259/026) | 31/fl- remodel (e) office space, propsed ti work entails (n) non bearing partitiosn, millwork, ceiling system with (n) lighting, power and communication fixtures and furniture systems. floor and wall… | $8,285,917 |
| [202511189853](https://www.permitgraph.org/p/202511189853) | Mar 23, 2026 | In progress: issued Apr 2026 | [405 Howard St](https://www.permitgraph.org/a/3737/030) | rev to existing approved permit 2024-1212-6728. to show occupancy loads and call out assembly areas 8th fl. outdoor deck (8300), east patio (8301) breakroom (8246) |  |
| [202603197880](https://www.permitgraph.org/p/202603197880) | Mar 19, 2026 | Completed: final sign-off Jun 2026 | [3 Embarcadero Center](https://www.permitgraph.org/a/0232/016) | 16th fl mechanical and electrical work for ti ref pa 202601214196 | $140,000 |
| [202603137536](https://www.permitgraph.org/p/202603137536) | Mar 13, 2026 | Completed: final sign-off Oct 2026 | [114 Sansome St](https://www.permitgraph.org/a/0267/010) | office ti 7th fl. demo and construct non load bearing partitions, millwork, lighting, ceiling system. | $1,400,000 |
| [202603107294](https://www.permitgraph.org/p/202603107294) | Mar 10, 2026 | In progress: issued May 2026 | [301 Howard St](https://www.permitgraph.org/a/3738/011) | interior demo only permit for level 3 and 4. tenant improvement seperate permit. | $100,000 |
| [202603097165](https://www.permitgraph.org/p/202603097165) | Mar 9, 2026 | Completed: final sign-off Sep 2026 | [1 Sansome St](https://www.permitgraph.org/a/0289/004) | 24-25/f: deferred mep for pa# 202512172034. | $2,314,656 |
| [202603097166](https://www.permitgraph.org/p/202603097166) | Mar 9, 2026 | Completed: final sign-off Sep 2026 | [1 Sansome St](https://www.permitgraph.org/a/0289/004) | 26/f: deferred mep for pa# 202512172035. | $1,157,328 |
| [202603057026](https://www.permitgraph.org/p/202603057026) | Mar 5, 2026 | Completed: final sign-off Nov 2026 | [600 Montgomery St](https://www.permitgraph.org/a/0207/032) | 44th/f: full floor tenant improvement for office tenant. new non-load bearing partitions and doors, relatec ceiling, wall and floor finishes, as well as mep work. | $1,000,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/contractor/skyline-construction-727637.