# Skanska Usa Building Inc

Contractor license 817578. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/skanska-usa-building-inc-817578
- JSON: https://www.permitgraph.org/api/contractor?license=817578
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=817578

62 permits since 2000: 42 completed, 8 in progress, 6 never finaled, 6 expired or cancelled. Typically 28 days from filing to permit and 468 days from permit to final inspection. Of the 6 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old.

- Based in: Parsippany
- On San Francisco permits: Jun 2013 to Nov 2025
- Last 24 months: 4 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2013 | 2 | 0 | 0 | 0 |
| 2014 | 4 | 0 | 0 | 0 |
| 2015 | 4 | 0 | 0 | 0 |
| 2016 | 12 | 0 | 0 | 0 |
| 2017 | 3 | 0 | 2 | 3 |
| 2018 | 1 | 0 | 1 | 3 |
| 2019 | 5 | 0 | 2 | 0 |
| 2021 | 7 | 0 | 0 | 0 |
| 2022 | 1 | 0 | 0 | 0 |
| 2023 | 2 | 0 | 1 | 0 |
| 2024 | 1 | 5 | 0 | 0 |
| 2025 | 0 | 3 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Roof deck | 1 | 1 | 0 | 0 | 0 | 432 | 2124 |
| Stairs | 1 | 1 | 0 | 0 | 0 | 432 | 2124 |
| Pergola or trellis | 2 | 2 | 0 | 0 | 0 | 48 | 658 |
| Bathroom remodel | 1 | 1 | 0 | 0 | 0 | 58 | 214 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202511038781](https://www.permitgraph.org/p/202511038781) | Nov 3, 2025 | In progress: issued Dec 2025 | [1950 Jackson St](https://www.permitgraph.org/a/0592/005) | reroute sewer line to new termination. ref pa #201912098990 and 202209021852 | $15,000 |
| [202511038783](https://www.permitgraph.org/p/202511038783) | Nov 3, 2025 | In progress: issued Dec 2025 | [1960 Jackson St](https://www.permitgraph.org/a/0592/006) | reroute sewer line to new termination. ref pa #201912098993 and 201912098994 | $15,000 |
| [202509195700](https://www.permitgraph.org/p/202509195700) | Sep 30, 2025 | In progress: issued Dec 2025 | [400 Howard St](https://www.permitgraph.org/a/3720/008) | remove and replace a limited portion of the parking level 2 (p2) basement slab to permit repair of sewage ejector discharge pipe. work affects less than 100 sqft of basement slab. does not affect lat… | $198,800 |
| [202412066295](https://www.permitgraph.org/p/202412066295) | Dec 6, 2024 | Completed: final sign-off Apr 2025 | [299 02nd St](https://www.permitgraph.org/a/3736/029) | revision to pa 2023-1130-1690 for change to exterior wall detail 11/a8.01 |  |
| [202407116300](https://www.permitgraph.org/p/202407116300) | Jul 11, 2024 | In progress: issued Sep 2024 | [1950 Jackson St](https://www.permitgraph.org/a/0592/005) | all hydronic piping is being replaced in stage 1 residence. cold, hot, and hot water return piping water heater and water meter is being replaced in stage 1 residence. sewer/vent piping is being repl… | $15,000 |
| [202404250754](https://www.permitgraph.org/p/202404250754) | Apr 25, 2024 | In progress: issued May 2024 | [1960 Jackson St](https://www.permitgraph.org/a/0592/006) | ref 202404230581- remove above roof portion of western most chimney located om 1960 jackson st. patch and repair as need | $5,000 |
| [202404230581](https://www.permitgraph.org/p/202404230581) | Apr 23, 2024 | In progress: issued May 2024 | [1950 Jackson St](https://www.permitgraph.org/a/0592/005) | remove non-operational chimney. patch and repair in kind as needed. entire chimney to be removed. | $10,000 |
| [202403127633](https://www.permitgraph.org/p/202403127633) | Mar 12, 2024 | In progress: issued Apr 2024 | [1960 Jackson St](https://www.permitgraph.org/a/0592/006) | ref 201912098993 protect & retain decorative brick & terra cotta piers at site entrance. replace in kind & increase the height of the brick wall between the piers. replacement wall section will match… | $5,000 |
| [202403127632](https://www.permitgraph.org/p/202403127632) | Mar 12, 2024 | In progress: issued Apr 2024 | [1950 Jackson St](https://www.permitgraph.org/a/0592/005) | ref pa# 201912098990 protect & retain decorative brick & terra cotta piers at site entrance. replace in kind & increase the height of the brick wall between the piers. replacement wall section will m… | $5,000 |
| [202311301690](https://www.permitgraph.org/p/202311301690) | Nov 30, 2023 | Completed: final sign-off Apr 2025 | [299 02nd St](https://www.permitgraph.org/a/3736/029) | selective replacement of eterior tile facade installed under permit 201812148389. |  |
| [202310118448](https://www.permitgraph.org/p/202310118448) | Oct 11, 2023 | Completed: final sign-off Jun 2025 | [2100 Webster St](https://www.permitgraph.org/a/0628/013) | 1/f: selective demolition, replacement of x-ray equipment in (e) imaging room, minor configuration of select partitions, installation on (n) casework, build out of accessible toilets and partial fini… | $175,000 |
| [202303012826](https://www.permitgraph.org/p/202303012826) | Mar 1, 2023 | Never finaled: issued Mar 2023, no final | [1950 Jackson St](https://www.permitgraph.org/a/0592/005) | exploratory demo, approx 2000 sq ft throughout a 12,000 sq ft single family. locations: floor, wall areas, remove and preserve finishes, door hardware, paneling, wanscoting, trim, cabinets, flooring.… | $45,000 |
| [202212239056](https://www.permitgraph.org/p/202212239056) | Dec 23, 2022 | Completed: final sign-off Jan 2024 | [1 California St](https://www.permitgraph.org/a/0264/004) | 14/f, suite 1450: new demising walls/doors to create sub tenant space, (e) lighting to remain. mep/fire protection deferred | $25,000 |
| [202104128354](https://www.permitgraph.org/p/202104128354) | Apr 12, 2021 | Completed: final sign-off May 2021 | [1095 Market St](https://www.permitgraph.org/a/3703/059) | this is to obtain final ispection for work approved under permit application # 201712156622. all work is completed. | $65,000,000 |
| [202104128353](https://www.permitgraph.org/p/202104128353) | Apr 12, 2021 | Completed: final sign-off Jun 2021 | [1095 Market St](https://www.permitgraph.org/a/3703/059) | this is to obtain final inspection for work approved under permit application # 201706018199. all work is completed. | $65,000,000 |
| [202104128351](https://www.permitgraph.org/p/202104128351) | Apr 12, 2021 | Completed: final sign-off May 2021 | [1095 Market St](https://www.permitgraph.org/a/3703/059) | this is to obtain final inspection for work under permit application #201506118778. all work is completed. | $65,000,000 |
| [202104128344](https://www.permitgraph.org/p/202104128344) | Apr 12, 2021 | Completed: final sign-off Jun 2021 | [1095 Market St](https://www.permitgraph.org/a/3703/059) | this is to obtain final inspection for work approved under permit application# 201704285215. all work is completed. | $65,000,000 |
| [202104128346](https://www.permitgraph.org/p/202104128346) | Apr 12, 2021 | Completed: final sign-off May 2021 | [1095 Market St](https://www.permitgraph.org/a/3703/059) | this is to obtain final inspection for work approved under permit application#201709289880. all work is completed. | $65,000,000 |
| [202104128348](https://www.permitgraph.org/p/202104128348) | Apr 12, 2021 | Completed: final sign-off May 2021 | [1095 Market St](https://www.permitgraph.org/a/3703/059) | this is to obtain final inspection for work approved under applicataion #201808036428. all work is completed. | $65,000,000 |
| [202104027836](https://www.permitgraph.org/p/202104027836) | Apr 2, 2021 | Completed: final sign-off Jun 2021 | [1095 Market St](https://www.permitgraph.org/a/3703/059) | this is to obtain final inspection for work approved under permit application# 201801309932. all work is completed. | $65,000,000 |
| [201912098993](https://www.permitgraph.org/p/201912098993) | Dec 9, 2019 | Never finaled: issued Jan 2023, no final | [1960 Jackson St](https://www.permitgraph.org/a/0592/006) | seismic upgrade. security upgrades. mep including new wiring, accessiblility, sprinklers, programmatic modifications. removal of a portion of front wall for guard house, raising of a portion of the b… | $7,900,000 |
| [201909202244](https://www.permitgraph.org/p/201909202244) | Sep 20, 2019 | Completed: final sign-off Dec 2020 | [299 02nd St](https://www.permitgraph.org/a/3736/029) | evac maps | $3,000 |
| [201907236735](https://www.permitgraph.org/p/201907236735) | Jul 23, 2019 | Completed: final sign-off Mar 2021 | [299 02nd St](https://www.permitgraph.org/a/3736/029) | revision to 201812148389 and 201901251235: (e) roof trellis to remain, changes to elevations revised structural design to art box, marquee, rest, canopy, ext light fixture remove from scope |  |
| [201906244204](https://www.permitgraph.org/p/201906244204) | Jun 24, 2019 | Completed: final sign-off Feb 2021 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | revision to pa #201710231998. structural revision to support plate b. not visible from exterior. |  |
| [201905301993](https://www.permitgraph.org/p/201905301993) | May 30, 2019 | Completed: final sign-off Mar 2021 | [299 02nd St](https://www.permitgraph.org/a/3736/029) | ref pa 201812148389. cold metal framing; exterior metal stud framing. install all exterior metal stud framing system as required. | $6,300,000 |
| [M1031607](https://www.permitgraph.org/p/M1031607) | Jan 25, 2019 | Never finaled: issued Jan 2019, no final | [1095 Market St](https://www.permitgraph.org/a/3703/059) | street space |  |
| [201901251235](https://www.permitgraph.org/p/201901251235) | Jan 25, 2019 | Completed: final sign-off Mar 2021 | [299 02nd St](https://www.permitgraph.org/a/3736/029) | selective demo of 1st & 2nd fl, interior and exterior selective demo of (e) porte cochere, public open space at folsom and courtyard public open space. demolition of roof trellis. associated with bpa… | $1,000,000 |
| [201812148389](https://www.permitgraph.org/p/201812148389) | Dec 14, 2018 | Completed: final sign-off Aug 2021 | [299 02nd St](https://www.permitgraph.org/a/3736/029) | ground & 2nd floor - selective remodel of exterior, new interior finishes. expand lobby at ground floor, partial infill of (e) port-cochere, new exterior covered outdoor space, interior renovation of… | $6,300,000 |
| [201808036428](https://www.permitgraph.org/p/201808036428) | Aug 3, 2018 | Expired or cancelled: expired May 2021 | [1095 Market St](https://www.permitgraph.org/a/3703/059) | column repair at grids 10/a (southwest corner) of the building between the 8th floor and roof. n/a for maher. | $50,000 |
| [201807063914](https://www.permitgraph.org/p/201807063914) | Jul 6, 2018 | Expired or cancelled: expired May 2021 | [1095 Market St](https://www.permitgraph.org/a/3703/059) | revision clarify new product used for 2 hours horizontal protection for fuel oil piping per fire inspector on-sit directions maher na |  |
| [201801309932](https://www.permitgraph.org/p/201801309932) | Jan 30, 2018 | Expired or cancelled: expired Jun 2021 | [1095 Market St](https://www.permitgraph.org/a/3703/059) | revision 201409116118 s2, revised gas/meter room and fire pump room perm field conditions and pge inspection comments |  |
| [201801168684](https://www.permitgraph.org/p/201801168684) | Jan 16, 2018 | Never finaled: issued Jan 2018, no final | [1 California St](https://www.permitgraph.org/a/0264/004) | revision to 201712045422 to clarify (e) conditions in central corridor. existing 1 hr rated construction throughout central corridor. correct ratings on door schedule maher na |  |
| [201712156622](https://www.permitgraph.org/p/201712156622) | Dec 15, 2017 | Expired or cancelled: expired May 2021 | [1095 Market St](https://www.permitgraph.org/a/3703/059) | revision to pa 2014-0911-6118 (s9) clarify and detail modification to the engine exhaust and vent piping. permit per field discussion with fire sprinklers; n/a maher | $1,000 |
| [201712045422](https://www.permitgraph.org/p/201712045422) | Dec 4, 2017 | Completed: final sign-off Apr 2018 | [1 California St](https://www.permitgraph.org/a/0264/004) | 14th floor: t.i. for office space. n/a for maher | $850,000 |
| [201712015278](https://www.permitgraph.org/p/201712015278) | Dec 1, 2017 | Never finaled: issued Dec 2017, no final | [1 California St](https://www.permitgraph.org/a/0264/004) | 14th floor: demo entire office space ab-107 maher na | $100,000 |
| [201710231998](https://www.permitgraph.org/p/201710231998) | Oct 23, 2017 | Completed: final sign-off Feb 2021 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | install electric "ibm" wall sign | $3,500 |
| [201709289880](https://www.permitgraph.org/p/201709289880) | Sep 28, 2017 | Expired or cancelled: expired May 2021 | [1095 Market St](https://www.permitgraph.org/a/3703/059) | revision to app#201409116118 s1: replace concrete slab in the designated region of the 3rd level of the bldg. the extg concrete slab has shown signs of significant spalling and needs replacement. con… | $10,000 |
| [201706260346](https://www.permitgraph.org/p/201706260346) | Jun 26, 2017 | Never finaled: issued Nov 2021, no final | [1095 Market St](https://www.permitgraph.org/a/3703/059) | revision to app#201409116118-s2. changes to rooftop support, roofing, plumbing & electrical system to accomodate lounge uses, furnishings, landscaping & equipment. changes required per planning dept.… | $1,000 |
| [201704285215](https://www.permitgraph.org/p/201704285215) | Apr 28, 2017 | Expired or cancelled: expired Jun 2021 | [1095 Market St](https://www.permitgraph.org/a/3703/059) | revision to 201409116118 s2 for interior changes on basement and 1st fl for admin area, fdc, fcc, door locations, for additional support elements, atroof including access hatch at elevator over runs.… |  |
| [201702038617](https://www.permitgraph.org/p/201702038617) | Feb 3, 2017 | Completed: final sign-off Jan 2019 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | 6th floor #614 - revision to pa #201603253070 & ref t.i. #201512185489: add badge reader, emergency push button. n/a maher ordinance | $10,000 |
| [201607152499](https://www.permitgraph.org/p/201607152499) | Jul 15, 2016 | Completed: final sign-off Sep 2016 | [899 Valencia St](https://www.permitgraph.org/a/3596/113) | 1/f- furniture plan for pa#201510291125 to provide layout of work stations in open office, desks are free standing, not built in place. n/a ordinance #155-13 |  |
| [201606089420](https://www.permitgraph.org/p/201606089420) | Jun 8, 2016 | Completed: final sign-off Jun 2016 | [55 02nd St](https://www.permitgraph.org/a/3708/096) | to permit 'systems furniture' for pa 2015-0923-7786. |  |
| [201604296159](https://www.permitgraph.org/p/201604296159) | Apr 29, 2016 | Completed: final sign-off Jan 2019 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | fl 7 & 8: revisions to permit 2016-0127-8112, including restroom core changes and minor hvac and electrical revisions. ref architecturals: 2016-0108-6655 & 2016-0418-5015. life safety deferred. |  |
| [201604185015](https://www.permitgraph.org/p/201604185015) | Apr 18, 2016 | Completed: final sign-off Jan 2019 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | revisions to pa 2016-0108-6655 - add storage room; updated door schedule, updated plan for mech platform. maher na |  |
| [201604144786](https://www.permitgraph.org/p/201604144786) | Apr 14, 2016 | Completed: final sign-off Jan 2019 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | revision to mep pa#201601207450 to revise lan room layout and restroom cores. arch. & structural under pa#201512185489. mep pa#201601207450. n/a ordinance #155-13 |  |
| [201604084309](https://www.permitgraph.org/p/201604084309) | Apr 8, 2016 | Completed: final sign-off Jun 2016 | [899 Valencia St](https://www.permitgraph.org/a/3596/113) | 1st floor: deferred submital for pa# 2015-1029-1125, raised access floor system to be installed. cost evaluation included in previous permit. n/a ordinance #155-13 |  |
| [201603253070](https://www.permitgraph.org/p/201603253070) | Mar 25, 2016 | Completed: final sign-off Jan 2019 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | revision to existing pa 2015-1218-5489 lan from layout revised & reconfigured general clarifications added to sheet notes, dimensions added, finish call outs modified, and card reader locations revis… |  |
| [201601278112](https://www.permitgraph.org/p/201601278112) | Jan 27, 2016 | Completed: final sign-off Jan 2019 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | new mep for 1st time tenant improvement to levels 7 & partial 8/f. arch. t.i. pa# 201601086655. n/a ordinance #155-13 | $1,785,000 |
| [201601257898](https://www.permitgraph.org/p/201601257898) | Jan 25, 2016 | Completed: final sign-off Jun 2016 | [55 02nd St](https://www.permitgraph.org/a/3708/096) | deferred submittal for access floor system for app#201509237786. permit for floor system only. all other work approved under previous permit. n/a for maher. |  |
| [201601207450](https://www.permitgraph.org/p/201601207450) | Jan 20, 2016 | Completed: final sign-off Jan 2019 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | first time ti to level 6 inlcuding new mep. addition of rooftop equipment. architectural structural under separate permit. ref pa 2015-1218-5489. n/a for maher ordinance no.155-13 | $2,000,000 |
| [201601147103](https://www.permitgraph.org/p/201601147103) | Jan 14, 2016 | Completed: final sign-off Jan 2019 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | permit for non cooking warming pantry for a commercial ti. no cooking or raw food prep to occur. because of rated shaft limitations in existing building design, installation of ventless hood system w… | $100,000 |
| [201601086655](https://www.permitgraph.org/p/201601086655) | Jan 8, 2016 | Completed: final sign-off Jan 2019 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | 1st time tenant improvement to level 7 and 8. part of 8th fl. new non load bearing walls. new doors, new ceilings, new finishes, new furniture, mep, sprinklers, fire alarm sep permit. new structural… | $3,500,000 |
| [201512185489](https://www.permitgraph.org/p/201512185489) | Dec 18, 2015 | Completed: final sign-off Jan 2019 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | ti project for the 6th floor. standard open office space with conference & meeting rooms, employee break room. mep,sprinklers & f/a separate permit. n/a for maher. | $3,500,000 |
| [201510291125](https://www.permitgraph.org/p/201510291125) | Oct 29, 2015 | Completed: final sign-off Oct 2016 | [899 Valencia St](https://www.permitgraph.org/a/3596/113) | ground floor tenant improvement commercial space to include new partitoins, doors finishes, floors, ceilings, casework. new mechanical, plumbing & electrical systems. establish new medical services u… | $870,000 |
| [201509237786](https://www.permitgraph.org/p/201509237786) | Sep 23, 2015 | Completed: final sign-off Jun 2016 | [55 02nd St](https://www.permitgraph.org/a/3708/096) | interior renovations at ground floor level. full demo of tenant space. all new partitions, finishes, flooring , doors, ceilings, casework and new mechanical, electrical, & plumbing. 2 new bathrooms.… | $800,000 |
| [201506118778](https://www.permitgraph.org/p/201506118778) | Jun 11, 2015 | Completed: final sign-off May 2021 | [1095 Market St](https://www.permitgraph.org/a/3703/059) | revision to appl# 2014.1205.3186. revision to structural details for seismic renovations. maher n/a. | $5,000 |
| [201412053186](https://www.permitgraph.org/p/201412053186) | Dec 5, 2014 | Completed: final sign-off Jun 2021 | [1095 Market St](https://www.permitgraph.org/a/3703/059) | seismic renovation to 1095 market street foundation, basement & full structure.n/a for maher ordinance. | $1,500,000 |
| [201409116118](https://www.permitgraph.org/p/201409116118) | Sep 11, 2014 | Completed: final sign-off Sep 2021 | [1095 Market St](https://www.permitgraph.org/a/3703/059) | change of occupancy from office to hotel. new 203 hotel rooms. new roof deck. add new story within (e) structure. new stairs & elevator. ** maher: compliance with ordinance no# 155-13 not required ** | $9,650,000 |
| [201408264760](https://www.permitgraph.org/p/201408264760) | Aug 26, 2014 | Completed: final sign-off Jun 2021 | [1095 Market St](https://www.permitgraph.org/a/3703/059) | interior non-structural demo on all floors, remove walls and ceilings as indicated on drawings; maher n/a | $75,000 |
| [201404032339](https://www.permitgraph.org/p/201404032339) | Apr 3, 2014 | Completed: final sign-off Jun 2015 | [425 Market St](https://www.permitgraph.org/a/3709/014) | 20th & 21st floors including demoliton & new construction of non-load bearing partitions, doors, finishes, ceilings & casement. & associated mechanical & electrical work. fire sprinkler & ls under se… | $2,000,000 |
| [201311212461](https://www.permitgraph.org/p/201311212461) | Nov 21, 2013 | Completed: final sign-off Jun 2015 | [425 Market St](https://www.permitgraph.org/a/3709/017) | relocate existing water cooled crac unit from level 19 to 20. provide connection to existing condense water system and existing ductwork. relocate existing data racks to level 20. new power distribti… | $250,000 |
| [201306189878](https://www.permitgraph.org/p/201306189878) | Jun 18, 2013 | Completed: final sign-off Sep 2013 | [425 Market St](https://www.permitgraph.org/a/3709/015) | 21st floor suite - addition of (1) exec. office. | $64,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.