3,156 permits since 2000: 2,405 completed, 93 in progress, 550 never finaled, 108 expired or cancelled. Typically 0 days from filing to permit and 79 days from permit to final inspection. Of the 550 never-finaled permits, 73 are 3 to 5 years old, 215 are 5 to 10 years old, 262 are over 10 years old. 6 were filed but never issued.

- Based in: Hayward
- On San Francisco permits: Apr 2000 to Nov 2026
- Last 24 months: 168 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2000 | 6 | 0 | 1 | 6 |
| 2001 | 12 | 0 | 1 | 9 |
| 2002 | 10 | 0 | 1 | 12 |
| 2003 | 19 | 0 | 2 | 12 |
| 2004 | 20 | 0 | 1 | 5 |
| 2005 | 37 | 0 | 8 | 15 |
| 2006 | 33 | 0 | 1 | 23 |
| 2007 | 54 | 0 | 10 | 8 |
| 2008 | 85 | 0 | 8 | 1 |
| 2009 | 58 | 0 | 11 | 1 |
| 2010 | 80 | 0 | 18 | 2 |
| 2011 | 98 | 0 | 16 | 0 |
| 2012 | 114 | 0 | 44 | 1 |
| 2013 | 144 | 0 | 41 | 1 |
| 2014 | 158 | 0 | 21 | 1 |
| 2015 | 159 | 0 | 37 | 1 |
| 2016 | 191 | 0 | 45 | 2 |
| 2017 | 139 | 0 | 45 | 0 |
| 2018 | 198 | 0 | 49 | 0 |
| 2019 | 171 | 0 | 55 | 0 |
| 2020 | 149 | 0 | 46 | 1 |
| 2021 | 103 | 0 | 16 | 1 |
| 2022 | 93 | 0 | 33 | 2 |
| 2023 | 90 | 4 | 40 | 1 |
| 2024 | 90 | 31 | 0 | 1 |
| 2025 | 83 | 46 | 0 | 1 |
| 2026 | 11 | 12 | 0 | 1 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Kitchen remodel | 20 | 17 | 0 | 2 | 1 | 0 | 77 |
| Deck | 1 | 1 | 0 | 0 | 0 | 0 | 20 |
| Roof deck | 4 | 4 | 0 | 0 | 0 | 0 | 171 |
| Stairs | 3 | 2 | 0 | 1 | 0 | 0 | 75 |

## Most recent permits

The 100 most recent of 3,156.

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202611030261](https://www.permitgraph.org/p/202611030261) | Nov 3, 2026 | In progress: filed Nov 2026, not yet issued | [100 Larkin St](https://www.permitgraph.org/a/0354/001) | fire only work to obtain an as built permit for this panel upgrades project initially approved 202402015109. no device additoins or removals were done from the approved drawings. |  |
| [202607315863](https://www.permitgraph.org/p/202607315863) | Jul 31, 2026 | In progress: issued Jul 2026 | [2301 San Jose Av](https://www.permitgraph.org/a/6972/036) | fire only work to obtain as-built permit #2 for the voluntary replacement of the fire alarm system. as-built permit#1 bpa#202606112971 indicated 9 heat detectors when only 2 were existing/replaced. r… |  |
| [202606243800](https://www.permitgraph.org/p/202606243800) | Jun 24, 2026 | In progress: issued Jun 2026 | [750 Phelps St](https://www.permitgraph.org/a/5262/009) | to obtain final inspection for work approved under pa# 202504104090. all work is complete. |  |
| [202606243785](https://www.permitgraph.org/p/202606243785) | Jun 24, 2026 | In progress: issued Jun 2026 | [750 Phelps St](https://www.permitgraph.org/a/5262/009) | bldg: 921. fire only work to add a cellular dialer and to renew initially approved pa#: 202504104090 for the fire alarm system installation | $7,318 |
| [202606112971](https://www.permitgraph.org/p/202606112971) | Jun 11, 2026 | In progress: issued Jun 2026 | [2301 San Jose Av](https://www.permitgraph.org/a/6972/036) | fire only work to be obtain as as-built permit for the voluntary replacment of the fire alarm system, initial fire alarm pa#: 202512161848 and these drawings adds 1 smoke detector correction | $720 |
| [202606112969](https://www.permitgraph.org/p/202606112969) | Jun 11, 2026 | Completed: final sign-off Jun 2026 | [600 Montgomery St](https://www.permitgraph.org/a/0207/032) | fire only work to obtain as-built permit for the floor 20 and 21 remodels done under pa#:202508203517, initial fire alarm 202602105581, 2 relay modules added to the project for fire interface | $1,200 |
| [202605191491](https://www.permitgraph.org/p/202605191491) | May 19, 2026 | Completed: final sign-off Jun 2026 | [1455 03rd St](https://www.permitgraph.org/a/8721/033) | fire only work to obtain an as built permit for the phone booth additions on the floors 10 and 11 under 202506178877. all phone booths on floor 10 and 2 phone booths on floor 9 were not installed und… |  |
| [202605191494](https://www.permitgraph.org/p/202605191494) | May 19, 2026 | In progress: issued May 2026 | [4131 Geary Bl](https://www.permitgraph.org/a/1539/001) | fire only work to add 1 smoke detector and 1 heat detector for the elevator car 4 top of shaft area. these added devices are with the elevator modernization project and the initial fire alarm permit… | $1,440 |
| [202604280189](https://www.permitgraph.org/p/202604280189) | Apr 28, 2026 | Expired or cancelled: cancelled Oct 2026 | [600 Montgomery St](https://www.permitgraph.org/a/0207/032) | 18th fl - fire only work to add 2 way comm station @ the the passenger lobby. no associated remodel work or building permit number | $6,004 |
| [202604219758](https://www.permitgraph.org/p/202604219758) | Apr 21, 2026 | Completed: final sign-off Jul 2026 | [600 Montgomery St](https://www.permitgraph.org/a/0207/032) | 20th & 21st fl - fire only work to add 2 way comm system stations @ the passenger elevator lobbies on floors 20 and 21 (2 total). no associated remodel work or building pa # | $12,008 |
| [202604038817](https://www.permitgraph.org/p/202604038817) | Apr 3, 2026 | Completed: final sign-off Apr 2026 | [3 Embarcadero Center](https://www.permitgraph.org/a/0232/016) | floor 25;fire only to obtain "as-built" permit for the fire alarm addtions with the floor 25 allen matkins remodels. initial fire alarm pa#: 202511129336. |  |
| [202603318544](https://www.permitgraph.org/p/202603318544) | Mar 31, 2026 | Completed: final sign-off Oct 2026 | [600 Montgomery St](https://www.permitgraph.org/a/0207/032) | 39/f: fire only work to add 1 2-way communication system call station. no associated remodel work or building permit number. | $6,004 |
| [202602266545](https://www.permitgraph.org/p/202602266545) | Feb 26, 2026 | In progress: issued Feb 2026 | [1455 03rd St](https://www.permitgraph.org/a/8721/033) | 2/f: as-built fire alarm for conference area remodel on 2/f. 1 duct detector and 1 module were added to o/g f/a pa 202507170998., mech refe# 202508062463 | $3,279 |
| [202602105582](https://www.permitgraph.org/p/202602105582) | Feb 10, 2026 | Completed: final sign-off Mar 2026 | [4 Embarcadero Center](https://www.permitgraph.org/a/0233/044) | fire only work for the floor 23 suite 2310. remodel under pa#: 202505287341; additons are 1 smoke detectors, 1 module, 4 speaker, 8 speaker/strobes, and 2 strobes. | $13,430 |
| [202602105581](https://www.permitgraph.org/p/202602105581) | Feb 10, 2026 | In progress: issued Feb 2026 | [600 Montgomery St](https://www.permitgraph.org/a/0207/032) | fire only work for the floor 20 and 21 remodels done under pa#: 202508203517 and 202508203523; additions are 18 smoke detectors, 6 duct detectors, 16 modules, 2 strobe power supplies, 38 speaker/stro… | $98,420 |
| [202602065375](https://www.permitgraph.org/p/202602065375) | Feb 6, 2026 | In progress: issued Feb 2026 | [2 Embarcadero Center](https://www.permitgraph.org/a/0231/023) | 18/19th fl - fire only work to document the systems relocation sequence due to the tenant stairwell infill between floors nd 19. no parts added. ref pa 202410152915 |  |
| [202601284666](https://www.permitgraph.org/p/202601284666) | Jan 28, 2026 | In progress: issued Jan 2026 | [850 Bryant St](https://www.permitgraph.org/a/3759/042) | roof level: fire only work for the elevator modernization of cars 2 and 3 at the roof level machine room under 202112154499. additions are 1 smoke detector and 2 modules. | $1,920 |
| [202601274576](https://www.permitgraph.org/p/202601274576) | Jan 27, 2026 | Completed: final sign-off Feb 2026 | [1 Embarcadero Center](https://www.permitgraph.org/a/0230/028) | flr: 32/33; fire only work for the partial area remodels on floor 32 and 33 done under pa#: 202510217760; 2 speakers/strobes are added and an existing one is relocated. | $2,883 |
| [202601214187](https://www.permitgraph.org/p/202601214187) | Jan 21, 2026 | In progress: issued Jan 2026 | [4 Embarcadero Center](https://www.permitgraph.org/a/0233/044) | 14/f: fire only work for the remodel done under permit 202508082665. additions are 23 smoke detectors, 1 duct detector, 4 pull stations, 12 modules, 47 speakers, 42 speaker/strobes, and 2 strobes. | $107,880 |
| [202601214185](https://www.permitgraph.org/p/202601214185) | Jan 21, 2026 | Completed: final sign-off Jan 2026 | [1660 Bush St](https://www.permitgraph.org/a/0665/014) | fire only work to obtain an as-built permit for the emergency replacement of the fire alarm panel done under permit 202510217748, some devices were never installed and no additional ones added. |  |
| [202601214202](https://www.permitgraph.org/p/202601214202) | Jan 21, 2026 | In progress: issued Jan 2026 | [4 Embarcadero Center](https://www.permitgraph.org/a/0233/044) | fire only work for the 13/f. remodel done uner pa# 202508112754; additions are 17 s/d, 1 d/d, 4 pull stations, 3 modules, 50 speakers, 38 speaker/strobes, and 3 strobes. | $97,320 |
| [202601163985](https://www.permitgraph.org/p/202601163985) | Jan 16, 2026 | Completed: final sign-off Apr 2026 | [1455 03rd St](https://www.permitgraph.org/a/8721/033) | 9th fl - fire only work for the phone booth additions on floor 9 under pa 202506178881. additions are strobes | $4,347 |
| [202601093511](https://www.permitgraph.org/p/202601093511) | Jan 9, 2026 | Completed: final sign-off Jun 2026 | [1455 03rd St](https://www.permitgraph.org/a/8721/033) | 10th & 11th fl ref pa# 2025-0617-8877: 15 strobes are being added | $9,315 |
| [202601093510](https://www.permitgraph.org/p/202601093510) | Jan 9, 2026 | Completed: final sign-off Jan 2026 | [140 New Montgomery St](https://www.permitgraph.org/a/3722/080) | 25th fl ref pa# 2025-1112-9428: fire only work. addition of 2 speaker/strobes. | $1,922 |
| [202512232461](https://www.permitgraph.org/p/202512232461) | Dec 23, 2025 | In progress: issued Dec 2025 | [905 California St](https://www.permitgraph.org/a/0255/001) | roof level - fire only work to add 4 modules @ roof elevator machine rooms for cars 1-3 4-5; no associated remodel work or building permit number | $2,400 |
| [202512192222](https://www.permitgraph.org/p/202512192222) | Dec 19, 2025 | Completed: final sign-off Apr 2026 | [1455 03rd St](https://www.permitgraph.org/a/8721/033) | floor 4; fire only work for the phone booth additions on floor 4 under ref#: 202506178882; 2 strobes are added and 2 strobes for 4 booths | $2,484 |
| [202512192221](https://www.permitgraph.org/p/202512192221) | Dec 19, 2025 | Completed: final sign-off Apr 2026 | [1455 03rd St](https://www.permitgraph.org/a/8721/033) | floor 2; fire only work for the phone booth additions on floor 2 under ref#: 202506178874; 4 strobes are added for 4 booths | $2,484 |
| [202512171954](https://www.permitgraph.org/p/202512171954) | Dec 17, 2025 | Completed: final sign-off Feb 2026 | [369 Pine St](https://www.permitgraph.org/a/0268/012) | 5/f suite 518 - fire only. remodel done under permit 202509034512. 1 speaker/strobe is added. | $961 |
| [202512171953](https://www.permitgraph.org/p/202512171953) | Dec 17, 2025 | Completed: final sign-off Feb 2026 | [369 Pine St](https://www.permitgraph.org/a/0268/012) | 6/f suite 610 - fire only. remodel done under permit 202508294240. additions are 5 speaker/strobes and 1 strobe. | $5,426 |
| [202512171971](https://www.permitgraph.org/p/202512171971) | Dec 17, 2025 | Completed: final sign-off Feb 2026 | [369 Pine St](https://www.permitgraph.org/a/0268/012) | 4th floor: fire only for the suite 410 remodel done under pa #202509024393. additions are 3 speaker/strobes, as well as the relocation of 1 speaker/strobe. | $5,086 |
| [202512161848](https://www.permitgraph.org/p/202512161848) | Dec 16, 2025 | Completed: final sign-off Oct 2026 | [2301 San Jose Av](https://www.permitgraph.org/a/6972/036) | se building: voluntary replacement of the fires alarm syste including a cellular dialer, replace of 38 initiating devices and 5 notification devices and 2 new modules. | $45,290 |
| [202512161852](https://www.permitgraph.org/p/202512161852) | Dec 16, 2025 | In progress: issued Dec 2025 | [501 Post St](https://www.permitgraph.org/a/0306/025) | machine room on penthouse level: reprogram 2 (e) modules due to the removal of 4 heat detectors at the 2 elevator machine rooms on the penhouse level. | $1,200 |
| [202512121622](https://www.permitgraph.org/p/202512121622) | Dec 12, 2025 | In progress: issued Dec 2025 | [1455 03rd St](https://www.permitgraph.org/a/8721/033) | level 8; fire only work for air distribution alteration on level 8; pa: 202507221295; 1 relay module added for shutdown of 2 fcu. | $600 |
| [202512121619](https://www.permitgraph.org/p/202512121619) | Dec 12, 2025 | Completed: final sign-off Jan 2026 | [1455 03rd St](https://www.permitgraph.org/a/8721/033) | level 3; fire only work for the it room remodel on level 3 done under pa: 202506108366; 1 smoke detector and 1 speaker/strobe are relocated (no new devices). | $1,681 |
| [202512111477](https://www.permitgraph.org/p/202512111477) | Dec 11, 2025 | Completed: final sign-off Dec 2025 | [3 Embarcadero Center](https://www.permitgraph.org/a/0232/016) | fire work only for the promenade level remodel done under pa#: 202510157369; 1 speaker and 2 speaker/strobes are added, and 3 speaker/strobes are relocated. | $5,570 |
| [202512091267](https://www.permitgraph.org/p/202512091267) | Dec 9, 2025 | Completed: final sign-off Feb 2026 | [535 Mission St](https://www.permitgraph.org/a/3721/122) | 4th floor. fire only work for the suite 400. remodel on floor 4 done under pa#: 202508072540. additions are 1 smoke detector, 3 duct detector, 2 modules, 19 speakers/strobes, and 6 strobes. | $31,945 |
| [202512040928](https://www.permitgraph.org/p/202512040928) | Dec 4, 2025 | Completed: final sign-off Dec 2025 | [2 Embarcadero Center](https://www.permitgraph.org/a/0231/023) | 23rd fl, ste 2350 - remodel done under pa 202509266161 additions are 9 speakers, 4 speaker/strobes, and 3 strobes | $12,865 |
| [202512030793](https://www.permitgraph.org/p/202512030793) | Dec 3, 2025 | In progress: issued Dec 2025 | [535 Mission St](https://www.permitgraph.org/a/3721/122) | 8/f: additions of 2 speaker/strobes and 2 strobes for spect suite remodel done under pa202508122835 | $3,165 |
| [202512020681](https://www.permitgraph.org/p/202512020681) | Dec 2, 2025 | In progress: issued Dec 2025 | [55 Spear St](https://www.permitgraph.org/a/3713/007) | floor 37a/38a: fire only work for the "simpson thatcher" remodels on floors 37a and 38a. additions are 7 smoke detectors, 5 modules, 54 speakers, 52 speaker/strobes, 17 strobe, and the relocation of… | $113,660 |
| [202511250367](https://www.permitgraph.org/p/202511250367) | Nov 25, 2025 | Completed: final sign-off Dec 2025 | [1455 03rd St](https://www.permitgraph.org/a/8721/033) | 1st fl - fire only work for the bike storage remodel under pa 202506239234 additions are 4 speaker/strobes and 1 module | $4,445 |
| [202511240257](https://www.permitgraph.org/p/202511240257) | Nov 24, 2025 | Completed: final sign-off Feb 2026 | [425 Market St](https://www.permitgraph.org/a/3709/014) | 18th fl - fire only work for "new york life" remodel done under pa202508143050; additions/replacements are 18 smoke detectors, 24 duct detectors, 44 speakers. 42 speaker/strobes, and 26 strobes | $171,760 |
| [202511210147](https://www.permitgraph.org/p/202511210147) | Nov 21, 2025 | In progress: issued Nov 2025 | [600 Montgomery St](https://www.permitgraph.org/a/0207/032) | 25th fl - fire only work for "spark capital" remodel ref pa 202506058005 additions are 4 smoke detectors, 3 duct detectors, 7 modules, 13 speakers, 23 speaker/strobes, and 5 strobes | $53,340 |
| [202511200034](https://www.permitgraph.org/p/202511200034) | Nov 20, 2025 | Completed: final sign-off Jan 2026 | [140 New Montgomery St](https://www.permitgraph.org/a/3722/080) | 5 floor. fire only work for the spec suite remodel on flr 5; additions are 7 speaker/strobes; ref#: 202311090498. | $6,727 |
| [202511149585](https://www.permitgraph.org/p/202511149585) | Nov 14, 2025 | Completed: final sign-off Nov 2025 | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | floor 4; fire only work to add a module for door release at 2 locations at a walkway between section 3 and 4. no associated remodel work or ref permit. | $600 |
| [202511139479](https://www.permitgraph.org/p/202511139479) | Nov 13, 2025 | Completed: final sign-off Dec 2025 | [55 Spear St](https://www.permitgraph.org/a/3713/007) | 37a - fire work only for the spec suite; additions are speaker/strobes and 9 strobes. ref pa 202506188952 | $19,045 |
| [202511139480](https://www.permitgraph.org/p/202511139480) | Nov 13, 2025 | Completed: final sign-off Dec 2025 | [55 Spear St](https://www.permitgraph.org/a/3713/007) | 37a - fire only work for the corridor areas; additions are 7 smoke detectors and 7 speakers/s well as relocation of 5 smoke detecotrs ref pa 202505146425 | $15,370 |
| [202511129335](https://www.permitgraph.org/p/202511129335) | Nov 12, 2025 | Completed: final sign-off Nov 2025 | [555 Market St](https://www.permitgraph.org/a/3708/174) | 3rd fl - fire only work for the partial floor remodel under pa 202505126219 addition is a speaker strobe for the new conference room | $961 |
| [202511129336](https://www.permitgraph.org/p/202511129336) | Nov 12, 2025 | Completed: final sign-off Apr 2026 | [3 Embarcadero Center](https://www.permitgraph.org/a/0232/016) | 25th fl - fire work only for suite 2500 remodel done under pa 202507160935; additions are 13 smoke detectors, 9 duct detectors, 2 pull stations, 9 modules, 44 speaker/strobes, 55 speakers and 3 strob… | $131,940 |
| [202511109236](https://www.permitgraph.org/p/202511109236) | Nov 10, 2025 | In progress: issued Nov 2025 | [1455 03rd St](https://www.permitgraph.org/a/8721/033) | fire only work to replace 4 existing beam detector sets at the atriums of floor, 2,3,6& 9; 4 power supplies & 4 modules are also added. no associated remodel or ref permit number. (fire alarm system… | $29,990 |
| [202511109235](https://www.permitgraph.org/p/202511109235) | Nov 10, 2025 | In progress: issued Nov 2025 | [1515 03rd St](https://www.permitgraph.org/a/8721/029) | fire only work to replace 4 existing beam detector sets at the atriums of floor, 2, 4 & 5; 3 power supplies & 4 modules are also added. no associated remodel or ref permit number. (fire alarm system… | $23,815 |
| [202511109245](https://www.permitgraph.org/p/202511109245) | Nov 10, 2025 | Completed: final sign-off Dec 2025 | [600 Montgomery St](https://www.permitgraph.org/a/0207/032) | 22nd floor: fire only work for the spec office remodel. under ref pa #202504114245; additions are 7 smoke detectors, 4 duct detectors, 9 modules, 6 speakers, 16 speaker/strobes, and 6 strobes. | $44,390 |
| [202511079137](https://www.permitgraph.org/p/202511079137) | Nov 7, 2025 | Completed: final sign-off Nov 2025 | [55 Spear St](https://www.permitgraph.org/a/3713/007) | fire only work to add 8 strobes for the phone booth installation on floor 8b under ref#: 202510026579 | $4,968 |
| [202511048820](https://www.permitgraph.org/p/202511048820) | Nov 4, 2025 | In progress: issued Nov 2025 | [1 Embarcadero Center](https://www.permitgraph.org/a/0230/028) | 20th fl, ste 2020 - fire only work for remodel done under pa 202509054625; 1 strobe has been added | $621 |
| [202510288248](https://www.permitgraph.org/p/202510288248) | Oct 28, 2025 | In progress: issued Oct 2025 | [4 Embarcadero Center](https://www.permitgraph.org/a/0233/044) | 26th fl - fire only work ste 2610 remodel done under ref pa 202508294183. additions are 12 speakers, 17 speaker/strobes and 1 strobe | $26,500 |
| [202510217748](https://www.permitgraph.org/p/202510217748) | Oct 21, 2025 | Completed: final sign-off Jan 2026 | [1660 Bush St](https://www.permitgraph.org/a/0665/014) | floor 1; fire only work for the fire alarm system emergency update including direct replacment of 19 initiating devices/modules, and the panel motherland replacment. no ref. pa: as there is no associ… | $25,000 |
| [202510217746](https://www.permitgraph.org/p/202510217746) | Oct 21, 2025 | Completed: final sign-off Apr 2026 | [2222 Broadway](https://www.permitgraph.org/a/0564/070) | grant building; fire only work for elevator moderization at the grant bldg. additions are 5 smoke detectors, and 3 modules. no ref as no associated remodel is done. | $5,400 |
| [202510167471](https://www.permitgraph.org/p/202510167471) | Oct 16, 2025 | Completed: final sign-off Dec 2025 | [600 Montgomery St](https://www.permitgraph.org/a/0207/032) | 1st fl - fire only work for the installation of a 2-way communication system for the building including 10 call stations @ some floors. no ref pa # since there is no associated remodel work | $39,183 |
| [202510157363](https://www.permitgraph.org/p/202510157363) | Oct 15, 2025 | Completed: final sign-off Oct 2025 | [425 Market St](https://www.permitgraph.org/a/3709/014) | fire only work for the 26th fl. remodel work done under permit app #2025-0709-0436; 6 speakers/strobes are added and 1/smoke detector base is replaced with relay | $6,487 |
| [202510147292](https://www.permitgraph.org/p/202510147292) | Oct 15, 2025 | In progress: issued Feb 2026 | [1801 25th St](https://www.permitgraph.org/a/4285B/001) | add fire alarm panel with 52 devices for the cross cultural family center on floor 1. ref pa# 202202248652. | $54,000 |
| [202510076884](https://www.permitgraph.org/p/202510076884) | Oct 14, 2025 | In progress: issued Dec 2025 | [3359 24th St](https://www.permitgraph.org/a/6515/001) | installation of fire alarm system including a celluar dialer, initiating and notification devices. ref pa# 202104198808. | $118,230 |
| [202510026556](https://www.permitgraph.org/p/202510026556) | Oct 8, 2025 | Completed: final sign-off Aug 2026 | [550 Terry A Francois Bl](https://www.permitgraph.org/a/8721/011) | 1-4/fl- fire alarm ti. ref 202503172334 | $10,000 |
| [202510016447](https://www.permitgraph.org/p/202510016447) | Oct 1, 2025 | In progress: issued Oct 2025 | [255 12th St](https://www.permitgraph.org/a/3516/019) | fire only work to obtain an "as-built permit for voluntary upgrade of the fire alarm panel. initial fire alarm permit 202502281277 with some device removals |  |
| [202509185561](https://www.permitgraph.org/p/202509185561) | Sep 18, 2025 | Completed: final sign-off Dec 2025 | [85 02nd St](https://www.permitgraph.org/a/3708/019) | fire only work for the conference rooms remodel on floor 7 done under 202509084762; 3 speaker/strobees are added and 1 smoke detector is relocated. | $3,605 |
| [202509115046](https://www.permitgraph.org/p/202509115046) | Sep 11, 2025 | Expired or cancelled: cancelled Oct 2025 | [200 Mcallister St](https://www.permitgraph.org/a/0347/003) | 1st fl - fire only work dd a cellular dialer into (e) fire alarm system; no ref pa # (fire alarm addition only) | $7,318 |
| [202509115045](https://www.permitgraph.org/p/202509115045) | Sep 11, 2025 | Completed: final sign-off Dec 2025 | [535 Mission St](https://www.permitgraph.org/a/3721/122) | 8th fl - fire only work for "spec suites" remodel done under pa 202508122835; additions are 28 speaker/strobes and 2 modules | $28,108 |
| [202509115064](https://www.permitgraph.org/p/202509115064) | Sep 11, 2025 | Completed: final sign-off Oct 2025 | [555 Market St](https://www.permitgraph.org/a/3708/174) | 1st floor fire only work to add a cellular dialer into the existing fire alarm system; no ref on permit app. (fire alarm addition only | $7,318 |
| [202509094835](https://www.permitgraph.org/p/202509094835) | Sep 9, 2025 | Completed: final sign-off Oct 2025 | [4 Embarcadero Center](https://www.permitgraph.org/a/0233/044) | fire only for the wellness room. remodel on floor 29 done under pa: 202507080382. 1 speaker/strobe is added. | $961 |
| [202509054624](https://www.permitgraph.org/p/202509054624) | Sep 5, 2025 | Completed: final sign-off May 2026 | [100 Hooper St](https://www.permitgraph.org/a/3808/015) | floor 1; fire only work for fire alarm detection system at suite 35 and 50; no ref pa#. addition are 2 air-sampling detectors, 2 power supplies, 1 annunicator, 4 modules, and 8 speaker/strobes | $24,000 |
| [202509024313](https://www.permitgraph.org/p/202509024313) | Sep 2, 2025 | Completed: final sign-off Jan 2026 | [600 Montgomery St](https://www.permitgraph.org/a/0207/032) | floors 9 & 11 tenant improvement under 202504144336: additionas are 16 smoke detectors, 6 duct detectors, 22 modules, 2 speakers, 64 speaker/strobes & 19 strobes. | $129,920 |
| [202509024314](https://www.permitgraph.org/p/202509024314) | Sep 2, 2025 | Completed: final sign-off Jan 2026 | [600 Montgomery St](https://www.permitgraph.org/a/0207/032) | floors 10,12,13 tenant improvement under 202504144304; additions are 32 smoke detectors, 9 duct detectors, 33 modules, 7 speakers, 88 speaker/strobes & 31 strobes. | $175,740 |
| [202508294220](https://www.permitgraph.org/p/202508294220) | Aug 29, 2025 | Completed: final sign-off Sep 2025 | [425 Market St](https://www.permitgraph.org/a/3709/014) | fire only work to add a security system interface relay on 7/f. no ref pa # for this job. fire alarm addition only. | $600 |
| [202508284062](https://www.permitgraph.org/p/202508284062) | Aug 28, 2025 | In progress: issued Sep 2025 | [550 Terry A Francois Bl](https://www.permitgraph.org/a/8721/011) | 1st fl - fire only for the open ai remodel on level 1 done under pa #202504043753 additions are a vesda detector, 2 modules, and 3 speakers/strobes at the hardware lab. | $6,762 |
| [202508263859](https://www.permitgraph.org/p/202508263859) | Aug 26, 2025 | Completed: final sign-off Sep 2025 | [535 Mission St](https://www.permitgraph.org/a/3721/122) | fire only work for floor 21 remodel under 202506309837, 1 speaker/strobe added and 2 existing speaker/strobes relocated | $2,883 |
| [202508263861](https://www.permitgraph.org/p/202508263861) | Aug 26, 2025 | Completed: final sign-off Nov 2025 | [3 Embarcadero Center](https://www.permitgraph.org/a/0232/016) | 26th fl ref pa # 2025-0623-9229: fire only work. addition of 2 speaker/strobes | $1,922 |
| [202508213570](https://www.permitgraph.org/p/202508213570) | Aug 21, 2025 | Completed: final sign-off Apr 2026 | [1 Embarcadero Center](https://www.permitgraph.org/a/0230/028) | fire only work for the floor 38. remodel done under pa: 202505307558. additions are 1 smoke detector, 9 speakers, 13 speaker/strobes, and 2 strobes | $21,610 |
| [202508132891](https://www.permitgraph.org/p/202508132891) | Aug 13, 2025 | Completed: final sign-off Jan 2026 | [600 Montgomery St](https://www.permitgraph.org/a/0207/032) | fire only work for the remodel area on floors 23 and 24 done under ref permit #2025-0411-4225. additions are 16 smoke detectors, 7 duct detectors, 22 modules 46 speakers/strobes, and 27 strobes. | $104,450 |
| [202508132890](https://www.permitgraph.org/p/202508132890) | Aug 13, 2025 | In progress: issued Aug 2025 | [535 Mission St](https://www.permitgraph.org/a/3721/122) | floor 3; fire only work for the floor 3 conference center done under permit # 2025-0605-7981 additions are 1 module, 22 speaker/strobes and 2 strobes | $22,985 |
| [202508112704](https://www.permitgraph.org/p/202508112704) | Aug 11, 2025 | Completed: final sign-off Dec 2025 | [550 Terry A Francois Bl](https://www.permitgraph.org/a/8721/011) | fire only work to add 5 2 way comm stations on level 2-6, no ref permit. 9no associated remodel work) | $30,000 |
| [202508082611](https://www.permitgraph.org/p/202508082611) | Aug 8, 2025 | Completed: final sign-off Dec 2025 | [550 Terry A Francois Bl](https://www.permitgraph.org/a/8721/011) | 6th fl - fire only work for the "open ai" remodel under pa 202503112039 additions are 5 smoke detectors; 3 duct detectors, 1 modules, 1 strobe power supply, 44 speaker strobes and 30 strobes | $79,330 |
| [202508072483](https://www.permitgraph.org/p/202508072483) | Aug 7, 2025 | Completed: final sign-off Mar 2026 | [55 Spear St](https://www.permitgraph.org/a/3713/007) | fire only for the partial-floor remodel on floor 19a done under ref pa#: 202503172361; 1 speaker; 1 speaker/strobe and 2 strobes are added, as well as the relocation of 14 speaker/strobes. | $16,650 |
| [202508052286](https://www.permitgraph.org/p/202508052286) | Aug 5, 2025 | In progress: issued Aug 2025 | [945 Market St](https://www.permitgraph.org/a/3704/240) | 4/f: fire only work for the event center on floor 4 done under 202504073865; additions are 9 smoke detectors, 1 heat detector, 2 modules, 9 speaker/strobes, and 6 strobes. | $20,780 |
| [202508052290](https://www.permitgraph.org/p/202508052290) | Aug 5, 2025 | Completed: final sign-off Dec 2025 | [550 Terry A Francois Bl](https://www.permitgraph.org/a/8721/011) | fire only work for the open ai remodel on level 5 done under pa#: 202503111984; additions are 14 smoke detectors, 7 duct detectors, 4 modules, 2 stroke power supplies, 64 speaker/strobes, and 40 stro… | $132,820 |
| [202507312001](https://www.permitgraph.org/p/202507312001) | Jul 31, 2025 | Completed: final sign-off Aug 2025 | [55 Spear St](https://www.permitgraph.org/a/3713/007) | floor 35a, fire only work for the tenant stairwell construction on floor 35a done under pa#: 202505096158; no devices are required to be added, only relocation sequence reprogramming. |  |
| [202507241460](https://www.permitgraph.org/p/202507241460) | Jul 24, 2025 | In progress: issued Nov 2025 | [4131 Geary Bl](https://www.permitgraph.org/a/1539/001) | fire only work for the elevator modernization done under pa# 202505015606; addiions are 8 smoke detectors, 3 head detectors, and 13 modules | $14,200 |
| [202507241463](https://www.permitgraph.org/p/202507241463) | Jul 24, 2025 | Completed: final sign-off Aug 2025 | [140 New Montgomery St](https://www.permitgraph.org/a/3722/080) | fire only work to add a speaker/strobe for a portable phone booth on floor 23 installed under pa# 202503071787 this is fire permit #2 for the project | $961 |
| [202507231399](https://www.permitgraph.org/p/202507231399) | Jul 24, 2025 | In progress: filed Jul 2025, not yet issued | [750 Phelps St](https://www.permitgraph.org/a/5262/009) | bldg# 615. fire only work to install a new fire alarm system for building# 615. no associated building permit application. (fire alarm work only.) | $350,000 |
| [202507221280](https://www.permitgraph.org/p/202507221280) | Jul 22, 2025 | Completed: final sign-off Sep 2025 | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | fire only work for the privacy pods on floors 8 and 9 done under pa# 2025-0612-8629 additions are for fire alarm | $4,805 |
| [202507181087](https://www.permitgraph.org/p/202507181087) | Jul 18, 2025 | Completed: final sign-off Oct 2025 | [301 Van Ness Av](https://www.permitgraph.org/a/0786A/001) | fire only to obtain an as built permit for the device upgrade-loops 19/20" job initially approved under pa#: 202210144328. |  |
| [202507170998](https://www.permitgraph.org/p/202507170998) | Jul 17, 2025 | In progress: issued Jul 2025 | [1455 03rd St](https://www.permitgraph.org/a/8721/033) | 2nd floor; fire only work for the conference area remodel on floor 2 under pa#: 202506108373; additonal are 5 speaker/strobes. | $4,805 |
| [202507170995](https://www.permitgraph.org/p/202507170995) | Jul 17, 2025 | Completed: final sign-off Sep 2025 | [600 Montgomery St](https://www.permitgraph.org/a/0207/032) | 35th floor. fire only work for the floor 35 remodel done under 202502120191. addintons are 2 smoke detectors, 3 duct detectors, 13 speaker/strobes, and 6 strobes, 2 smoke dectector, 1 pull station, a… | $32,540 |
| [202507160863](https://www.permitgraph.org/p/202507160863) | Jul 16, 2025 | In progress: issued Jul 2025 | [4 Embarcadero Center](https://www.permitgraph.org/a/0233/044) | 14th fl: fire only work for the restrooms remodel done under permit # 202505096131. additions are 2 smoke detectors and 2 speaker/strobes. | $3,365 |
| [202507150778](https://www.permitgraph.org/p/202507150778) | Jul 15, 2025 | Completed: final sign-off Jul 2025 | [2 Embarcadero Center](https://www.permitgraph.org/a/0231/023) | 1st fl - fire only work for the security center remodel done under pa 202405242925, and the network interface additions for section monitoring and microphone cabability from 2 embarcadero center (ec)… | $70,000 |
| [202507110599](https://www.permitgraph.org/p/202507110599) | Jul 11, 2025 | In progress: issued Jul 2025 | [445 Geary St](https://www.permitgraph.org/a/0316/018A) | fire alarm to program a positive alarm sequence button (with password) for the existing fire alarm sytem. no ref. permit app#: |  |
| [202507110597](https://www.permitgraph.org/p/202507110597) | Jul 11, 2025 | In progress: issued Jul 2025 | [535 Mission St](https://www.permitgraph.org/a/3721/122) | fire alarm only work for the remodel on 12 flr done under pa#: 202501248998; additions are 33 speaker/strobes. | $31,715 |
| [202507100497](https://www.permitgraph.org/p/202507100497) | Jul 10, 2025 | Completed: final sign-off Aug 2025 | [343 Sansome St](https://www.permitgraph.org/a/0239/030) | fire only work for the "forge" remodel on floor 5 done under pa#2025-0430-5512, 21 speaker/stobes are added. | $20,180 |
| [202507100495](https://www.permitgraph.org/p/202507100495) | Jul 10, 2025 | In progress: issued Jul 2025 | [55 Spear St](https://www.permitgraph.org/a/3713/007) | fire only work to relocate 4 sprinklers/strobes in the unoccupied areas created with the floor 7a demolition. ref permit app#202506249311. | $3,844 |
| [202507090396](https://www.permitgraph.org/p/202507090396) | Jul 9, 2025 | In progress: issued Jul 2025 | [685 Townsend St](https://www.permitgraph.org/a/3799/007) | as-built :floor 1; fire only work to obtain an as-built permit for the bagel daddy remodel on floor1 done uner permit pa#; 202406053737. these drawings include the addition of 3 duct detectors not sh… | $8,037 |
| [202507090397](https://www.permitgraph.org/p/202507090397) | Jul 9, 2025 | Completed: final sign-off Jul 2025 | [10 Jackson St](https://www.permitgraph.org/a/0171/068) | suite 185: fire only work for remodel on the first floor. one done under ref#2024-1127-5843, additions are 2 smoke detectors, one duct detector, 2 modules, and 8 speaker/strobes. | $12,800 |
| [202506309741](https://www.permitgraph.org/p/202506309741) | Jun 30, 2025 | In progress: issued Jul 2025 | [4 Embarcadero Center](https://www.permitgraph.org/a/0233/044) | fire only work for the restrooms remodel on floor 13 done under pa#: 202505096175. additions are 2 smoke detectors and 2 speaker/strobes. | $3,365 |
| [202506309733](https://www.permitgraph.org/p/202506309733) | Jun 30, 2025 | In progress: issued Jun 2025 | [4 Embarcadero Center](https://www.permitgraph.org/a/0233/044) | 19th floor. fire only work for the office remodel on floor 19 done under 202506098227, 1 speaker strobe is relocated. no new devices added. | $961 |

---